    Conventional C10, C15, C20, C25, C30 concrete mix such as the figure below.

    The so-called concrete construction mix ratio refers to the proportional relationship between the constituent materials in the concrete. Adjustment steps: set the laboratory mix ratio as:

    Cement: Water: Sand:

    Pebble = 1:x:y:

    z, the moisture content of the sand on site is m, and the moisture content of the stone is n, then the construction mix ratio is adjusted as: 1:(x-y*m-z*n):

    y*(1+m):z*(1+n)。

    Concrete mix design is a very important work in concrete engineering, which directly affects the smooth construction of concrete, the quality of concrete engineering and the cost of concrete engineering.

    Principles of concrete mix design:

    1. The workability of the concrete mixture can meet the needs of construction;

    2. The strength of the concrete can meet the requirements of the design;

    3. Concrete should have good durability;

    4.In meeting the above requirements, minimize costs and increase benefits.

    Basic requirements for designing concrete mixtures:

    1. Meet the strength grade of concrete design.

    2. Concrete and workability that meet the construction requirements.

    3. Durability to meet the requirements of concrete use.

    4. To meet the above conditions, save cement and reduce concrete costs.

  2. Anonymous users2024-02-05

    I'll help him answer2009-8-18 20:38Wonderful c15:cement strength:

    Pebble concrete cement surplus coefficient coarse aggregate maximum particle size 20mm tarot degree 35 50mm material consumption per cubic meter: water: 180 cement:

    310 Sand: 645 Stones: 1225 The mix ratio is: :

    1:: Sand ratio water-cement ratio: c20:

    Cement strength: pebble concrete cement surplus coefficient coarse aggregate maximum particle size 20mm tarot degree 35 50mm amount of material per cubic meter: water:

    190 Cement: 404 Sand: 542 Stones:

    1264 Mix ratio::1:: Sand rate 30% water-cement ratio:

    C25: Cement strength: pebble concrete cement surplus coefficient Coarse aggregate maximum particle size 20mm Tarot degree 35 50mm Amount of material per cubic meter:

    Water: 190 Cement: 463 Sand:

    489 stones:1258 The mix ratio is::1::

    Sand rate 28% Water-cement ratio: C30: cement strength:

    Pebble concrete cement surplus coefficient coarse aggregate maximum particle size 20mm tarot degree 35 50mm material consumption per cubic meter: water: 190 cement:

    500 Sand: 479 Stones: 1231 The mix ratio is: :

  3. Anonymous users2024-02-04

    C25 Concrete Mix Ratio: 1:

    C10 Concrete mix ratio: sand: 860 stone: 1010 water 189 cement: 145 The so-called concrete construction mix ratio refers to the proportional relationship between the constituent materials in the concrete.

    The mix ratio of the laboratory is: cement: water:

    Sand:gravel=1:x:

    y:z, the moisture content of the sand on site is m, and the moisture content of the stone is n, then the construction mix ratio is adjusted to: 1:

    x-y*m-z*n):y*(1+m):z*(1+n)。

  4. Anonymous users2024-02-03

    Can you say the specific point This is according to the construction requirements, divided into pumping and non-pumping, and whether you want to use admixtures, a ratio has many factors to restrict It's not simply to say.

  5. Anonymous users2024-02-02

    Summary. Hello, I am glad to answer for you, :C10 concrete ratio.

    For example, the collapse of the concrete we took with C15 is 160 mm and 180 mm. At this time, the cement chosen is cement, and the sand is the middle sand of the river sand used. The diameter of the crushed stone is 20 mm to 40 mm.

    Then at this time, the ratio of this concrete is about 320kg of cement, 825kg of river sand, 1090kg of gravel, 190kg of water, and admixtures. Here is the ratio of one cubic meter of concrete. At this time, the mix ratio is probably cement:

    River Sand: Gravel: Water:

    The ratio of admixtures is:

    What is the conventional C10, C15, C20, C25, C30 concrete mix ratio?

    Ratio of C15 concrete. For example, the collapse of the concrete we took with C15 is 160 mm and 180 mm.

    At this time, the cement chosen is cement, and the sand is the middle sand of the river sand used. The diameter of the crushed stone is 20 mm to 40 mm. Then at this time, the ratio of this concrete is about 320kg of cement, 825kg of river sand, 1090kg of gravel, 190kg of water, and admixtures.

    Here is the ratio of one cubic meter of concrete. At this time, the mix ratio is probably cement:river sand:

    The ratio of crushed lithograph:water:admixture is.

    Ratio of C20 concrete. If the collapse of C20 concrete is also 160 mm, 180 mm.

    At this time, the cement is cement, the sand is also the medium sand in the river sand, and the gravel is 16 mm. Then the amount of 1 cubic concrete at this time is 355kg of cement, 790kg of river sand, 1090kg of gravel, 190kg of water, and admixture. At this point, their mix ratio is:

    Ratio of C25 concrete. If the collapse of C25 concrete is also 160 mm, 180 mm.

    Cement is also the choice of cement, and the sand is the middle sand of the river sand. The gravel is also of choice 16 mm. Then this is the amount in a cubic concrete, which is 390kg of cement, 755kg of river sand, 1090kg of gravel, 190kg of water, and admixtures.

    At this point, the mix ratio is. : C30 concrete ratio.

    For C30 concrete, if the slump is also 160 mm 180 mm, then the cement we choose is also cement, the sand is selected and the middle sand in the sand, and the gravel is also selected 16 mm. At this time, the materials for the weight of a cubic concrete are 430kg of cement, 720kg of river sand, 1085kg of gravel, 190kg of water, and admixtures. Then the mix ratio of this concrete is.

  6. Anonymous users2024-02-01

    What is the conventional C10, C15, C20, C25, C30 concrete mix ratio?

    What is the conventional C10, C15, C20, C25, C30 concrete mix ratio? Kiss! Hello, happy to answer your <>

    Pro-conventional C10, C15, C20, C25, C30 concrete mix as follows: conventional C10, C15, C20, C25, C30 concrete mix ratios are:

    1. C10C10 concrete mix ratio per cubic meter kg: cement 199kg, water 185kg, sand 850kg, stone 1126kg; C10 mix weight ratio is: 1:::

    The sand is medium sand, the fineness modulus is, and the gravel is the concrete mix ratio per cubic meter: cement 253kg, water 185kg, sand 750kg, stone 1172kg; C15 mix weight ratio: 1:::

    The sand is medium sand, the fineness modulus is, and the gravel is the concrete mix ratio per cubic meter: 330kg of cement, 185kg of water, 641kg of sand, and 1244kg of stone; The weight ratio of C20 mix is::, the sand is medium sand, the fineness modulus is, and the gravel is the concrete mix ratio per cubic meter

    385kg of cement, 185kg of water, 586kg of sand, 1244kg of gravel; C25 mix weight ratio is: 1::: sand is medium sand, fineness modulus is, gravel is concrete mix ratio per cubic amount kg:

    440kg of cement, 185kg of water, 532kg of sand, 1244kg of gravel; C30 mix weight ratio: 1::: sand is medium sand, fineness modulus is, gravel is concrete mix ratio per cubic amount kg:

    500kg of cement water, 185kg of water, 489kg of sand, 1255kg of gravel; C35 mix weight ratio: 1::: sand is medium sand, fineness modulus is, gravel is 5-40mm.

    Hope mine can help you <>

    Do you have any other questions?

  7. Anonymous users2024-01-31

    Hello, the mix ratio of C15 concrete is: cement 246kg, sand 767kg, gravel 1199kg, water 175kg, mix ratio 1:::

Related questions
13 answers2024-02-28

According to the national standard GB 7258-2004, it is classified as follows: >>>More

18 answers2024-02-28

C is process-oriented.

C++ is object-oriented. >>>More

16 answers2024-02-28

I'm sweating neurotic.

You can't get 20,000 points. >>>More

5 answers2024-02-28

I don't know exactly what the other two friends mean, but it seems that they are all based on the flow of discussions. >>>More

16 answers2024-02-28

Definition of a for loop.

for(the initial value of the variable; termination of operating conditions; The initial value of the first cycle i is 0, and it runs until i=3 stops i=2, and the condition is still satisfied, and the loop body is still executed, and the step size is 1+1 each time >>>More