What are the organizational measures in the project cost?

Updated on society 2024-03-31
9 answers
  1. Anonymous users2024-02-07

    The cost of measures is included in the construction and installation work cost.

    Environmental protection fee: refers to the various expenses required by the construction site to meet the requirements of the environmental protection department.

    Civilized construction cost: refers to the various expenses required for civilized construction on the construction site.

    3.Safety construction fee: refers to the various expenses required for safe construction on the construction site.

    Temporary facility fee: refers to the cost of temporary buildings, structures and other temporary facilities for living and production that must be erected by the construction enterprise for the construction of the construction project.

    Night construction cost: refers to the night shift subsidy, night construction efficiency reduction, night construction lighting equipment amortization and lighting electricity costs incurred due to night construction.

    Shortening the construction period and increasing the cost: refers to the construction increase cost incurred due to the shortening of the construction period, including the increase in the cost of night construction and the increase in the amount of input in turnover materials.

    Secondary handling costs: refers to the secondary transportation costs incurred due to special circumstances such as narrow construction sites.

    Completed project and equipment protection fee: refers to the cost of protecting the completed project and equipment before completion and acceptance.

    Other construction organization measures fee: refers to the construction organization measure fee items supplemented according to the characteristics of each specialty and regional project.

  2. Anonymous users2024-02-06

    There are environmental protection fees, civilized construction costs, safety construction costs, temporary facility fees, night construction costs, and secondary transportation fees, all of which are directly obtained by multiplying the list by the corresponding rate. In addition, there is a set of fixed costs, such as the installation and dismantling of mechanical equipment, some machines, how many sets of fixed amounts. There are also costs for scaffolding and formwork, which are also measures costs.

  3. Anonymous users2024-02-05

    Legal Analysis: The cost of the project of organizational measures includes the cost of construction of the document defense, the cost of environmental protection, the cost of temporary facilities, and the cost of safe construction. According to the relevant laws and regulations of our country, the cost of safety protection and civilized construction measures of construction projects is composed of civilized construction costs, environmental protection fees, temporary facilities fees and safety construction costs included in the cost of construction and installation projects.

    Other construction organization measures fee: refers to the construction organization measure fee items supplemented according to the characteristics of each specialty and regional project.

    Legal basis: Article 4 of the Regulations on the Management of Construction Project Safety Protection and Civilized Construction Measures and the Use of Construction Project Safety Protection and Civilized Construction Measures is composed of civilized construction costs, environmental protection fees, temporary facilities fees, and safety construction costs included in the cost of construction and installation projects. The cost of safe construction is composed of the cost of safety and combustion protection at the edge, hole, intersection and high-altitude operation, the cost of safety measures for dangerous projects and other costs.

    The composition of the cost of safety measures and other expenses of the project with greater risk shall be determined by the local construction administrative departments in combination with the actual situation of the region. Fifth construction unit, design unit in the preparation of project estimates (budget), should be based on the project cost management agency to determine the corresponding rate, reasonable determination of engineering safety protection, civilized construction measures costs.

  4. Anonymous users2024-02-04

    The cost of the project measures includes:1. Environmental protection fee;

    2. Civilized construction costs;

    3. Safety construction costs;

    4. Temporary facility fee;

    5. Night construction costs;

    6. Handling fees for two sparrows;

    7. Entry and exit and dismantling fees for large machinery and equipment;

    8. Concrete, reinforced concrete.

    formwork and bracket fees;

    9. Scaffolding fee;

    10. Completed projects and equipment protection fees;

    11. Construction drainage and precipitation fees.

    Legal basis: safety protection of construction projects and civilized construction measures.

    Article 3 of the Regulations on the Management of Costs and Use, the cost of safety protection and civilized construction measures referred to in these regulations refers to the construction safety and construction site in accordance with the current state construction.

    Environmental and health standards and relevant regulations, the purchase and renewal of construction safety protection equipment and facilities, and the improvement of the safety production conditions and working environment of the brigade. The list of safety protection and civilized construction measures is detailed in the attached table. Construction.

    If there are other requirements for safety protection and civilized construction measures for construction projects, the expenses incurred shall be included in the cost of safety protection and civilized construction measures.

  5. Anonymous users2024-02-03

    1. The meaning is different:

    1) The cost of construction technical measures refers to the cost incurred by the technical needs, such as the entry and exit of large machinery and equipment, and the cost of installation and dismantling.

    2) The cost of construction organization measures is the cost generated by the needs of the organization, such as the cost of civilized construction.

    2. The included fees are different

    1) The cost of construction technical measures includes: the entry and exit of large machinery and equipment, and the cost of installation and dismantling; concrete, reinforced concrete formwork and support fees; scaffolding fees; construction drainage, precipitation fees; Other construction technical measures costs.

    2) The cost of construction organization measures includes: environmental protection fee; civilized construction costs; safety construction costs; Temporary Facility Fees; night construction costs; shorten the construction period and increase the cost; secondary handling costs; Completed works and equipment protection fees; Other construction organization measures.

  6. Anonymous users2024-02-02

    Legal Analysis: The measure fee is the cost of a non-engineering entity project that occurs before and during the construction of the project to complete the construction of the project. The cost of measures can be divided into the cost of construction technical measures and the cost of construction organization measures.

    Among them, the cost of construction technical measures includes the entry and exit of large machinery and equipment and the installation and demolition fee, concrete, reinforced concrete formwork and support fee, scaffolding fee; construction drainage, precipitation fees, other construction technical measures costs, etc.; The cost of construction organization measures includes environmental protection fee, civilized construction fee, safety construction fee, temporary facility fee, night construction fee, shortening the construction period increase fee, secondary transportation fee, completed project equipment protection fee, and other construction organization measures fee.

    Legal basis: Article 5 of the Provisions on the Administration of Registration of the Business Scope of Enterprises Article 5 To apply for a licensed business project, the applicant shall apply to the examination and approval authority in accordance with the laws, administrative regulations and decisions, and after approval, apply for registration with the enterprise registration authority with the approval documents and certificates. If the examination and approval authority has a limit on the business period of the licensed business project, the registration authority shall register the business period, and the enterprise shall engage in business within the business period approved by the examination and approval authority.

    To apply for general business projects, the applicant shall refer to the "Classification of National Economic Industries" and relevant provisions to independently select one or more types of business, and directly apply for registration with the enterprise registration authority in accordance with the law.

  7. Anonymous users2024-02-01

    The project fee for pro-kiss measures and the cost of organizational measures are two different cost items in the project budget, and their differences are as follows:1Measure Project Fee:

    It refers to the regular funds that need to be spent in the implementation of the project, mainly including the salary, equipment, materials, travel, meetings, consulting fees and so on. 2.Organizational measures fee:

    It refers to the cost of personnel protection such as scaffolding, safety nets, and protective facilities during the construction process, as well as the cost of on-site filial piety and public security, as well as labor baggage and fees, social insurance, tax and other expenses. To sum up, the measure project fee emphasizes the normal expenditure in the process of project implementation, mainly for the completion of the whole project required for various conventional expenses, while the organizational measure fee is mainly to ensure the safety of personnel in the construction process and prevent accidents on site.

  8. Anonymous users2024-01-31

    Summary. The difference between the two is that the measure project fee is the cost of the measures taken to ensure the safety, environmental protection, quality and other aspects of the construction project, while the organizational measure fee is the cost of the organizational measures taken to ensure the smooth progress of the construction project.

    The difference between the two is that the measure project fee is the cost of the measures taken to ensure the safety, environmental protection, quality and other aspects of the construction project, while the organizational measure fee is the cost of the basic cost of taking the organizational measures to ensure the smooth progress of the construction project.

    The cost of the measure project and the cost of the organizational measure are two different cost items in the construction project. The cost of the measure project refers to the cost of the measures taken to ensure the safety, environmental protection and quality of the construction project, such as the environmental impact assessment of the construction project, the assessment and monitoring of the construction project. Organizational measures refer to the expenses required for organizational measures taken to ensure the smooth progress of construction projects, such as the costs of bidding, contract management, project supervision, quality inspection and other expenses of construction projects.

  9. Anonymous users2024-01-30

    Measure fee. It generally includes the following items:

    1) Conservation fee for the cave of the ring and the fence;

    2. Civilized construction costs;

    3. Safety construction costs;

    4. Temporary facility fee;

    5) Increasing the cost of night construction;

    6) Secondary handling fee;

    7) Blind entry and exit and installation and dismantling fees for large machinery and equipment;

    8. Concrete, reinforced concrete.

    formwork and bracket fees;

    9. Scaffolding fee;

    10) Carry the cost of completed projects and equipment protection;

    11. Construction drainage and precipitation fees.

Related questions
6 answers2024-03-31

There are three ways to calculate insurance premiums: observation, classification, and addition and subtraction. It usually consists of two parts: >>>More

5 answers2024-03-31

The calculation steps are as follows:

1. Determine the combination of quota items: Generally, there are several subitems on the corresponding quota of a bill of quantities item. >>>More

5 answers2024-03-31

That's all I know:

International Labour Organization (ILO): Develop policies and programmes to improve working conditions and increase employment opportunities, and to identify labour standards for use by countries around the world. >>>More

14 answers2024-03-31

The acceptance of the foundation and foundation division project shall be organized by the chief engineer (or the project leader of the construction unit). The units participating in the acceptance include: construction units, construction general contractors, supervision units, design units, and survey units. >>>More

10 answers2024-03-31

Quality EngineerThe following conditions are required to apply for the certificate >>>More