Who is responsible for organizing the acceptance of the foundation project

Updated on society 2024-02-10
14 answers
  1. Anonymous users2024-02-06

    The acceptance of the foundation and foundation division project shall be organized by the chief engineer (or the project leader of the construction unit). The units participating in the acceptance include: construction units, construction general contractors, supervision units, design units, and survey units.

    The sub-projects included in the acceptance of the foundation and foundation division projects include pile foundation, earthwork excavation, dewatering, drainage, waterproof concrete, membrane waterproofing (or waterproofing works), formwork, steel bars, concrete, backfill (or earthwork backfill), and brick masonry.

    Analysis: Project acceptance management.

    According to the provisions of the "Code for Acceptance of Construction Quality of Building Foundation Engineering" GB50202 2002: the acceptance of the foundation and foundation division project shall be organized by the chief engineer or the project leader of the construction unit to organize the project leader and technical quality person in charge of the survey, design unit and construction unit, and jointly carry out in accordance with the design requirements and this code and other relevant provisions.

    According to the provisions of Article 50300 2001 of the Unified Standard for Acceptance of Construction Quality of Construction Projects, the project leader of the construction unit and the person in charge of technology and quality shall be accepted by the chief engineer (the project leader of the construction unit); The person in charge of the project of the survey and design unit of the foundation and foundation and the main structure of the subdivision project and the person in charge of the technical and quality department of the construction unit shall also participate in the acceptance of the relevant subdivision project.

    According to the background information, the foundation and foundation division of this project includes the following sub-projects: pile foundation, earthwork excavation, dewatering, drainage, waterproofing concrete, membrane waterproofing (or waterproofing works), formwork, steel bars, concrete, backfill (or earthwork backfill), brick masonry.

  2. Anonymous users2024-02-05

    The foundation engineering belongs to a sub-project, first of all, it should be reported to the supervision on the basis of the self-inspection of the construction unit, and then the supervision unit shall report to the construction unit, and the construction unit shall organize the design, geological survey, supervision, construction unit and the first quality supervision department to accept the site.

  3. Anonymous users2024-02-04

    Party A is responsible for organizing acceptance.

  4. Anonymous users2024-02-03

    The director or the project leader of the construction unit is organized.

  5. Anonymous users2024-02-02

    The acceptance of the foundation and foundation engineering of the construction project shall be carried out according to the procedures of self-assessment, design approval, supervision and approval, owner acceptance and supervision.

    1. After the construction of the foundation and foundation division (sub-division) is completed, the construction unit shall organize relevant personnel to inspect and report to the project director engineer (or project leader of the construction unit) of the supervision agency on the basis of self-inspection

    2. Before the acceptance of the foundation and foundation division project, the construction unit shall compile the quality control data of the division project into a book and submit it to the project supervision agency for review, and the supervision and verification shall be signed by the chief engineer after meeting the requirements, and the quality supervision station shall be notified three working days before acceptance.

    3. The chief engineer (the person in charge of the project of the construction unit) shall organize the participating parties to accept the foundation and foundation division project in a timely manner after receiving the acceptance report, fill in the quality acceptance record of the foundation and foundation division project after passing the acceptance, and endorse the acceptance conclusions and opinions, and the relevant responsible person shall sign and stamp the official seal of the unit, and attach the quality inspection record of the division project.

    4. The personnel participating in the acceptance are: the chief engineer, the project leader of the construction unit, the project leader of the design unit, the project leader of the survey unit, the technical quality person in charge of the construction unit and the project manager.

  6. Anonymous users2024-02-01

    The procedures for quality supervision and acceptance of foundation and foundation division projects mainly include:

    After the completion of the construction of the foundation and foundation division (sub-division), the construction unit shall organize relevant personnel to inspect and report to the project director engineer of the supervision agency (the project leader of the construction unit) on the basis of passing the self-inspection

    Before the acceptance of the foundation and foundation division project, the construction unit shall compile the quality control data of the division project into a book and submit it to the project supervision agency for review, and the supervision and verification shall be signed by the chief engineer after meeting the requirements, and the quality supervision station shall be notified three working days before acceptance.

    The supervising engineer (the person in charge of the project of the construction unit) shall promptly organize the five parties involved in the construction of the foundation and foundation division project for acceptance, and shall fill in the quality acceptance record of the foundation and foundation division project after passing the acceptance, and endorse the acceptance conclusions and opinions. The relevant responsible person shall sign and affix the official seal of the unit, and attach the quality inspection record of the branch project.

    When the supervising engineer (the project leader of the construction unit) organizes the acceptance of the foundation and foundation division project, the following personnel must participate: the chief engineer, the project leader of the construction unit, the project leader of the design unit, the project leader of the survey unit, the technical quality person in charge of the construction unit and the project manager.

  7. Anonymous users2024-01-31

    1. The inspection and acceptance of the sub-projects included in the foundation engineering division are all qualified.

    2. The information about safety and functional inspection (testing) is complete and complete.

    The construction unit shall organize the design unit, the supervision unit, the construction unit (technical leader) and the survey unit to jointly accept the foundation and foundation.

  8. Anonymous users2024-01-30

    It's OK to send money to the leader in advance

  9. Anonymous users2024-01-29

    Either way, passing is fine.

  10. Anonymous users2024-01-28

    Summary. No. Foundation (including pile foundation) acceptance, to the safety station to accept, the construction unit to get the acceptance of the quality station to get the acceptance reply, in order to return to the soil, the main structure construction, supervision to issue:

    The quality assessment report of the foundation project, Party A, supervision, design and construction shall be stamped on the acceptance application form.

    The main building project refers to the load-bearing structural system that accepts, bears and transmits all the upper loads of the construction project on the foundation and maintains the integrity, stability and safety of the structure. Its components include:

    1. Concrete engineering: (1) formwork engineering (2) reinforcement engineering (3) prestressed engineering (4) concrete engineering (5) cast-in-situ structural engineering (6) prefabricated structural engineering (7) concrete structure subdivision engineering, 2. Masonry engineering: (1) basic provisions (2) masonry mortar (3) brick masonry engineering (4) concrete small hollow block masonry engineering (5) stone masonry engineering (6) reinforced masonry engineering (7) filling wall masonry engineering (8) winter construction, 3. Steel structure engineering: (1) basic provisions (2) raw materials and finished products (3) steel structure welding engineering (4) fastener connection engineering (5) steel parts and steel components processing engineering (6) steel component assembly engineering (7) steel structure.

    Can the main construction be carried out before the foundation and foundation are not accepted?

    No. Foundation (including pile foundation) acceptance, to the quality of the station to accept, the construction unit to get the quality of the station acceptance reply, in order to return to the soil, the main structure construction, supervision to issue: the quality assessment report of the foundation engineering, Party A, supervision, design, construction should be stamped on the acceptance application form.

    The rapid rise of the main building project refers to the load-bearing structural system that receives, undertakes and transmits all the upper loads of the construction project on the basis of the foundation, and maintains the integrity, stability and safety of the structure. Its components include: 1. Concrete engineering:

    1) Formwork engineering (2) reinforcement engineering (3) prestressing engineering (4) concrete engineering (5) cast-in-situ structural engineering (6) prefabricated structural engineering (7) concrete structure subdivision engineering, 2. Masonry engineering: (1) basic provisions (2) masonry mortar (3) brick masonry engineering (4) concrete small hollow block masonry engineering (5) stone masonry engineering (6) Senqin reinforcement masonry engineering (7) filling wall masonry engineering (8) winter construction, 3. Steel structure engineering: (1) basic provisions (2) raw materials and finished products (3) steel structure welding engineering (4) fastener connection engineering (5) steel parts and steel components processing engineering (6) steel component assembly engineering (7) steel structure.

    Dear, this is the answer found for you.

  11. Anonymous users2024-01-27

    Responsible for the overall command of design, supervision, construction and other engineering projects, and responsible for the quality of the project. Engineering designers: review the engineering design scheme to ensure that the engineering design scheme meets the specified requirements.

    Supervisors: responsible for the inspection, acceptance and supervision of the construction quality of the project to ensure that the construction quality of the project meets the standards. The person in charge of the construction unit:

    Responsible for the construction according to the construction plan, and responsible for the construction quality. Acceptance personnel: responsible for on-site inspection, measurement, analysis of the quality of foundation and foundation engineering, and quality evaluation.

    Can you elaborate on that a little bit more?

    Hello sorry to keep you waiting, I'm glad to answer for you, 1. The personnel for the acceptance of foundation and foundation engineering include: Project leader: responsible for the overall command of design, supervision, construction and other engineering projects, and responsible for the quality of the project.

    Engineering designers: review the engineering design scheme to ensure that the engineering design scheme meets the specified requirements. Supervisor suspected of jurors:

    Responsible for the inspection, acceptance and supervision of the construction quality of the project, and ensure that the construction quality of the project is up to standard. The person in charge of the construction unit: responsible for the construction according to the construction plan, and responsible for the construction quality.

    Responsible for reviewing the acceptance report, ensuring that all construction is completed in accordance with the specified requirements, and issuing acceptance documents.

  12. Anonymous users2024-01-26

    The acceptance of the building foundation and the main structure shall be organized by the chief engineer.

    Procedures for the acceptance of foundation and main structure engineering:

    1. After the construction of the main branch is completed, the construction unit shall organize relevant personnel to inspect and report to the chief engineer of the supervision agency on the basis of passing the self-inspection.

    2. Before the acceptance of the main branch of the company, the construction unit shall compile the quality control data of the division project and endorse the conclusions and defense opinions into a book, and submit it to the supervision agency for review, and after meeting the requirements, the chief engineer shall sign the review opinion and notify the quality supervision station three working days before acceptance.

    3. The chief engineer shall promptly organize the five parties involved in the construction of the main branch project to accept the acceptance report after receiving the acceptance report, and shall fill in the quality acceptance record of the main branch project after passing the acceptance, and the relevant responsible person shall sign and affix the official seal, and attach the quality inspection record of the division project.

    4. When the supervising engineer organizes the acceptance of the main branch project, the supervising engineer, the project leader of the construction cavity foundation unit, the project leader of the design unit, the technical quality person in charge of the construction unit and the project manager must participate.

  13. Anonymous users2024-01-25

    First, the foundation and the foundation of the Tan Lu foundation project included in the contents.

    The foundation and foundation division projects include: foundation, foundation, foundation pit support, groundwater control, earthwork, slope, underground waterproofing and other sub-division projects.

    Second, the foundation and foundation engineering quality acceptance engineering data.

    1. After the completion of all the construction of the sub-divisions and sub-projects in the foundation and foundation division project, the construction unit shall issue a construction quality self-assessment report after passing the self-inspection, which shall be reviewed, signed and sealed by the project manager and the person in charge of the construction unit;

    2. The supervision unit shall conduct quality evaluation of the whole process of supervision, provide a quality assessment report, and review, sign and seal by the director and the relevant person in charge of the supervision unit;

    3. The survey and design unit shall inspect the survey and design documents and design changes, recognize whether the project foundation and foundation entity are consistent with the design, and issue a quality inspection report;

    4. There are complete foundation and foundation engineering archives.

    3. Foundation and foundation engineering acceptance organization and acceptance personnel.

    1. The project leader of the construction unit (or the director of project supervision) shall organize the acceptance of the foundation and foundation division project, and the construction, supervision (construction), construction, design, survey and other units of the project shall participate in the acceptance;

    2. The members of the acceptance team are composed of the director of project supervision (the person in charge of the project of the construction unit), the person in charge of the survey, design and construction unit, the person in charge of the project technology and quality of the construction unit, and the person in charge of the technical and quality department of the construction unit.

    Fourth, the foundation and foundation engineering acceptance procedures.

    The acceptance of the foundation and foundation engineering of the construction project shall be carried out in accordance with the procedures of self-assessment, design approval, supervision and approval, acceptance of the construction unit and supervision.

  14. Anonymous users2024-01-24

    The acceptance of the foundation is usually organized by the construction unit or the supervision unit. The construction unit refers to the unit that invests in the construction project and is responsible for the management of the construction project, while the supervision unit is an independent third-party organization hired by the construction unit to supervise the quality and progress of the project. Foundation acceptance is a very important part of the construction project, which is usually carried out after the completion of the foundation construction, in order to ensure that the quality of the foundation meets the construction standards and technical specifications.

    The parties involved in the acceptance of the foundation usually include the construction unit, the supervision unit and the construction unit. Among them, the construction unit is one of the organizers of foundation acceptance, which is responsible for providing foundation-related engineering design documents and technical information to the supervision unit, and negotiating with the construction unit to solve the existing problems. The supervision unit is the main participant in the acceptance of the foundation, and it will send professional engineers and technicians to conduct surveys, on-site inspections and tests on the foundation to judge whether the bearing capacity and stability of the foundation meet the requirements.

    In addition, the construction unit is also obliged to cooperate with the foundation acceptance work, provide necessary assistance and cooperation for the supervision unit, and ensure the smooth progress and quality of the acceptance.

    Foundation acceptance is another important part of construction engineering, which is carried out on the basis of foundation acceptance. The purpose of foundation acceptance is to inspect and evaluate the quality and safety of foundation engineering, find and correct problems in time during the construction process, and avoid potential safety hazards in the future. The main participants in the foundation acceptance include the construction unit, the supervision unit, the design unit and the construction unit.

    The construction unit is the organizer of the foundation acceptance, and it should provide the design documents and construction records related to the foundation project, and explain the purpose and standards of inspection and evaluation to the supervision unit and the design unit. The supervision unit and the design unit are the main executors of the foundation acceptance, and they will send professional engineers and technicians to conduct surveys, on-site inspections and tests on the foundation project, and draw up the corresponding inspection and evaluation reports. The construction unit also has the obligation to cooperate with the foundation acceptance work, provide necessary assistance and cooperation for the inspectors, and ensure the smooth progress of the acceptance progress and quality.

    In short, foundation acceptance and foundation acceptance are very important links in construction projects, which are not only related to the quality and safety of construction projects, but also directly affect the subsequent construction process and use of the silver calendar. Therefore, the construction unit, the supervision unit, the design unit and the construction unit should pay full attention to it, and actively participate in and cooperate with the acceptance work. <>

Related questions
5 answers2024-02-10

The net assets of the enterprise are more than 4 million yuan. >>>More

16 answers2024-02-10

It's up to you to take the aspect of the project. If you have the strength to combine book knowledge and practice, you can ask your peers.

6 answers2024-02-10

There are two parts: the basic examination and the professional examination for the first-class registered structural engineer. The foundation test is an objective question that is answered on an answer sheet. The professional examination adopts a combination of subjective and objective examination methods, that is, candidates are required to write the calculation process on the answer sheet while filling in the answer sheet. >>>More