What are the basic procedures for bathroom renovation? The correct process and steps to decorate the

Updated on home 2024-03-11
11 answers
  1. Anonymous users2024-02-06

    How to decorate the bathroom, many people may not have carefully considered, think that the bathroom is a shower, toilet and washing, as long as the toilet, shower and washstand are installed, in fact, the bathroom decoration process is not understood, the later troubles are a lot, the following 8 major bathroom decoration process, do it, you can also install the perfect bathroom. Step 1, hydropower transformation, hydropower positioning, oblique tee, water trap, water supply pipe pressure test, drainage test water can not be missing, choose the wall row or the ground row, in this step also to plan Step 2, sewer sound insulation, sewer pipe sound insulation If you don't do a good job, as soon as you release water upstairs, your home will make a noise Step 3, the bottom layer is waterproof, and the bottom layer is slope waterproof to avoid hiding water at the bottom in the future. Step 4, the wall is waterproof, the base layer should be waterproof to be 40 cm, and the surface layer waterproof should be 2 meters 4 high.

    Step 5, paste wall tiles, and use corner paving to make it more beautiful Step 6, ground waterproofing, closed water test, height not less than 20 cm, test for more than 48 hours, observe for 4 days, to confirm that there is no leakage Step 7, beautiful seams, after the tile is paved, do beautiful seam treatment, and better sanitation Step 8, install the integrated ceiling and sanitary ware, complete this step, and your bathroom will be basically decorated.

  2. Anonymous users2024-02-05

    1. Hydropower transformation.

    1. Laying of water supply pipes.

    2. The wall circuit is embedded.

    2. Waterproof measures.

    1. The waterproof measures of the bathroom are a necessary project, and the waterproof coating in the bathroom extends from the ground to the wall.

    2. Bathroom waterproofing is mainly: wall and ground waterproofing.

    3. Paving tiles.

    1. Ceramic tile is the decorative material of the floor and wall of the bathroom, which can not only strengthen the waterproof effect of the wall and the ground, but also have a good decorative effect.

    2. Bathroom tiling is mainly: wall tile paving.

    Fourth, ceiling decoration.

    The water vapor in the bathroom tends to rise to the ceiling, so the decorative materials of the ceiling must also have the performance of waterproof, moisture-proof, corrosion-proof and high-temperature resistance. The common bathroom ceiling material is aluminum gusset.

    5. Install a bathtub.

    6. Bathroom basin device.

    7. Bathroom faucets and hardware devices.

  3. Anonymous users2024-02-04

    To put it simply: package the pipes first.

    Then install the squatting toilet, and the toilet does not need to be installed first.

    Then do waterproofing, at least twice. Apply the second time after the first dry.

    If you have a shower, paint the wall to a metre height.

    Install swing doors. If it is the final installation of the sliding door.

    Paste the wall tiles again, and then the floor tiles.

    Suspended ceiling again. Come to an end.

  4. Anonymous users2024-02-03

    The bathroom is an area with a relatively small proportion of space in the whole house, but its decoration.

    The project is more cumbersome, and it is best to follow the process in the decoration and proceed in a certain order. So what are the processes for decorating the bathroom of the house? It can be summarized as follows: 1. Hydropower pipelines; 2. Waterproof setting; 3. Tiled ceilings.

    4. Install accessories.

    Plumbing: Plumbing is the basic project for decorating the bathroom of the house. The electrical aspect relates to the bathroom lights, bath bombs.

    Exhaust fan. etc., it is necessary to design the circuit direction of the bathroom, and plan to install and reserve several circuit sockets.

    in the bathroom. In terms of waterways, there are water inlet pipes.

    Roads and drainage pipes, water inlet pipes should also take into account hot and cold water.

    Waterproof setting: Waterproof setting is an important process for decorating the bathroom of the house. There is a toilet in the bathroom, and there is also a function of washing and bathing, and water can be found everywhere, which is the whole house except the kitchen.

    The wettest place. Once the waterproof treatment is not done well, it will not only cause trouble to your daily life, but also harm your neighbors, so waterproof setting is an important process in the bathroom of the house.

    After the waterproof effect test is qualified, you can pave the tiles and install the ceiling. This is a more personalized process in the process of decorating the bathroom of the house, and you can choose the corresponding style according to your personal preferences, but the bathroom is a wet area and a floor after all.

    The choice of tiles should consider non-slip, and the wall ceiling should consider moisture-proof. Anti-slip measures should be done to avoid the potential safety hazards of living in the bathroom in the future, and to do a good job of moisture-proof, that is, to avoid the old damage of the toilet and affect the electrical circuit.

    After the first three decorations are completed, the overall decoration of the bathroom is almost in the end, and the last item is to install the toilet.

    Wash basin. Rain showerhead.

    Bathroom cabinets. Mirrors, bath towels.

    Hooks and other bathroom supplies. These can be installed according to individual needs.

    The above is a summary of the process steps of decorating the bathroom of the house, the most important is the water and electricity and waterproof engineering, because these two are hidden in the dark, it is not easy to rectify in the future, we must put the top priority in the process of decorating the bathroom of the house.

  5. Anonymous users2024-02-02

    1. Hydropower transformation.

    When we decorate the bathroom, the first thing to do is the water and electricity transformation, which includes the heating of the bath bomb and the treatment of the water pipe into the wall. Before carrying out the water and electricity transformation, we must first consider the location of the bathroom that needs to be installed with bathroom equipment and its safety model, and when we determine the construction plan, we can reserve some sockets in case we need to add electrical appliances in the future.

    2. Waterproof treatment.

    Waterproof treatment is one of the most important items of bathroom decoration, generally the bathroom floor should be coated with waterproof paint twice, the waterproof layer should be about 250mm higher than the ground, and then do a good job of the protective layer, after the ground waterproofing, the wall of the bathroom also needs to do a good job of waterproof engineering, the wall waterproof layer of the bathroom is best to do the top, after the waterproof project is done, you must not forget to do a 24-hour closed water test.

    3. Paste tiled sedan chairs.

    Because the bathroom is more humid, when we choose bathroom tiles, it is best to choose tiles with good non-slip and waterproof performance, such as tiles with concave and convex texture on the surface, the style and pattern of tiles can be selected according to the style of the bathroom and other actual conditions.

  6. Anonymous users2024-02-01

    The first step is hydropower construction, which is the first and more important step in toilet construction. We need to carry out the layout and design of water and electricity, including the design of heating and lighting wiring, such as the location of the installed bathroom equipment, how many sockets need to be reserved, etc. In addition, the construction of water and electricity should be carried out in strict accordance with the construction standards, and the quality of water pipes and wires should be qualified, so as not to affect the normal use of toilets.

    The second step is waterproofing: The waterproofing of the toilet is particularly important. Generally, its waterproof layer is about 250mm above the ground, and then a protective layer is made on it. In addition, after the completion of the waterproof project, it is necessary to carry out a 24-hour closed water test, so as to effectively test the waterproof performance of the house, and the pressure level should be debugged well, not too low, not too high, otherwise the actual test results will be affected.

    Step 3: After the construction of concealed tiles is completed, the next step is the decoration design. It is best to choose different shades for wall tiles and floor tiles, which can achieve a good zoning effect.

    Moreover, the tile should be waterproof, energy-consuming, wear-resistant, and non-slip, such as the tile with concave and convex texture on the surface has good anti-slip performance. In addition, the color and size of the tiles should also be determined according to the overall decoration style, so that the effect is better.

    Step 4: After the bathroom ceiling tiles are paved, the next step is the design of the ceiling. Aluminum gusset or integral bathroom ceiling can be used.

    This device is both beautiful and functional. In addition, the ceiling height of the bathroom should not only ensure the flatness, but also pay attention to the installation design of the exhaust fan.

  7. Anonymous users2024-01-31

    1.Hydropower retrofit.

    Hydropower renovation is the beginning of the completion of the decoration project, related to the safety and convenience of the use of hydropower, hydropower as far as possible to go to the top, the junction of the water pipe to install the bridge bend protection circuit, hot and cold water pipe interval of more than 10 cm, really not work also to go to the top of the water to the ground, to avoid the risk of water seepage damage to the circuit.

    2.Watertight. The bathroom floor and wall should be waterproof, the wall is blue and green, and the ground is waterproof back to 30 cm, so as to prevent leakage at the connection between the wall and the ground, and the waterproof test must be done after the construction is completed, inject more than 5 cm of water and close it for 2 days, check whether there is leakage, if there is, it should be dealt with in time.

    3.Drain. Bathroom sewer pipe must be made of water trap, from the source of water seal odor and insects, floor drain is very critical, you can choose deep water seal type floor drain, which can more effectively block the odor, shower area paved long type floor drain, the advantage is that the area is large and the drainage is fast.

    4.Ceiling. Many owners will choose aluminum gusset as the ceiling material, because this material is beautiful and moisture-proof, and the air heater must be installed on the keel at the same time, so as to be stable.

    5.Sanitary ware enters.

    Now smart home is very popular, owners may wish to pick a smart mirror cabinet, not only to listen to the **, but also to watch beauty tutorials, feel the changes brought by technology to life.

    Toilet is a place with a high usage rate, which is related to people's comfort and health, and it is not easy to obtain the ideal decoration quality and effect, and the owners need to do a good job in water and electricity transformation, waterproofing, drainage, ceiling, and sanitary ware into these key processes.

  8. Anonymous users2024-01-30

    When decorating the bathroom, the bathroom should be done first, and the waterproof and waterproof should be done twice, and then attention should be paid to the appropriate storage cabinet for customization, and try to make dry and wet separation.

  9. Anonymous users2024-01-29

    It is necessary to determine the size of the bathroom, and the water and sewage circuits of the toilet need to be determined, so that the space can be better planned and decorated better.

  10. Anonymous users2024-01-28

    When the bathroom is decorated, it is generally the first to lay wall tiles, then lay floor tiles, and finally install the toilet sink, if the bathroom space is relatively large, you can do some hanging cabinets.

  11. Anonymous users2024-01-27

    First of all, it is necessary to determine the size of the bathroom and design it reasonably, so that it can be better decorated, and we must pay attention to the selection of tiles, the decoration of the wall, and the reasonable planning of the overall structure.

Related questions
17 answers2024-03-11

Bathroom waterproofing should be done well.

In addition to the basic waterproof work, the bathroom leakage is mainly the junction between the ground and the wall, which should be dealt with urgently, leaving no dead ends, and the waterproofing of the wall is best to be 180mm, which can not only eliminate water leakage, but also prevent water from wetting the wall. >>>More

11 answers2024-03-11

We all know that decoration is a very deep knowledge, decoration is a lot of tedious things, it is a headache, we all know that the bathroom is a more humid place, but also a more important part of our house, because the general problem is in the bathroom more, leakage, blockage or something. Therefore, it is necessary to pay attention to the characteristics when decorating, so what are the key points of family bathroom decoration? Family bathroom decoration should pay attention to safety Since the bathroom uses more water, anti-slip and anti-fall is also a problem that needs special attention when decorating the bathroom, which is also a key issue in the decoration of the family bathroom. >>>More

5 answers2024-03-11

What are the feng shui points to decorating the bathroom? Pay attention to these points and don't commit feng shui taboos.

6 answers2024-03-11

Waterproof wall paint: performance is more important.

To decorate a bathroom, the walls are usually covered with tiles. However, the same bathroom wall material can no longer meet the individual needs, and the emergence of waterproof coatings and waterproof wallpaper provides a new opportunity for the "makeover" of the bathroom space. The formula of waterproof wall paint adds special waterproof and breathable molecules, which can form a dense paint film, so that water molecules cannot penetrate it, ensuring the breathing function of the wall, so it can be used on the wall of the bathroom. >>>More

28 answers2024-03-11

The home is going to be renovated, what color is better to choose for bathroom tiles? The space of the bathroom is generally very small, its lighting will certainly not be very good, on the wall tile, it is not suitable to choose dark tiles, dark tiles have a very dark effect on the main color of the entire bathroom space, in order to better reflect the tone of the bathroom, we can generally use white, and the daytime can also reflect the color of the sun, if the owner does not like white, then the color of the tile with a pattern needs to be matched with light and elegant colors, The main thing is to be concise and clear. The floor of the bathroom also needs tiles, so the color of the floor tiles in the bathroom, the color of the bathroom floor tiles needs to be darker than the color of the wall tiles, so as to better match the theme color of the whole space. >>>More