What are the steps in the renovation of a rough house?

Updated on home 2024-03-20
7 answers
  1. Anonymous users2024-02-07

    The steps and methods of water and electricity decoration of the blank room are as follows:

    1. Circuit installation.

    1. Before the installation of hydropower, there must be strong and weak electricity, and the design and construction drawings of water supply and drainage.

    2. It is forbidden to set the wires without any protection directly in the wall, in the floor, under the floor or on the ceiling.

    3. Lines with different voltages, different circuits, and different signals are strictly forbidden to wear in the same pipe.

    4. The installation of lamps and lanterns should be completed after the paint construction, and the switchgear should be installed on the phase line, otherwise after the switch is off, the lights will still be charged and the electrical equipment will be electrified, which is easy to cause electric shock. If the luminaire uses a screw head, the reed tongue of the screw head should be connected to the control phase wire.

    5. Remember not to connect the wire in the conduit, that is, if the length of the wire is not enough to be wired, the connector of the wire cannot be in the conduit, and it should generally be wired in the junction box such as switches, sockets, lamp head boxes, etc.

    6. The power system should take appropriate protective measures, grounding protection and zero protection, generally take grounding protection, and it is strictly forbidden to use two protection measures at the same time.

    7. The interface of the line should be smooth, the connecting plate should be firm, and it is strictly forbidden to block the wire to block the conduit.

    Second, the installation of waterways.

    1. The hot water faucet in the cold and hot water faucet should be installed on the left side. The electric water heater should have a grounding protection device, which can remove the air in the bile when it is first used, and it can be energized after being filled with water.

    2. The horizontal pipe of the drainage pipe should have a certain slope, and the socket connection should be tight to ensure that there is no leakage. Fixed pipe brackets, elevator spacing reasonable, firm.

    3. The installation of the waterway must be firm and accurate, and the installation position of toilet appliances must also be accurate and firm.

    The villa master provides you with local building policies, building drawings, and villa design drawings;

    Villa appearance renderings service, thousands of popular drawings for you to choose.

    Villa Master.

  2. Anonymous users2024-02-06

    The decoration process of the rough house can be divided into the following points: 1. Choose a decoration company, determine the decoration style, recommend a number of decoration companies to compare, make a budget, and then make a reasonable choice in combination with other circumstances after comparison, so that the decoration water can be fully squeezed out. 2. The determination of the decoration budget of the rough house, the signing of the decoration contract, after the decoration style is set, it is necessary to make a budget, the budget can know how much it will cost, so that a number of decoration companies can be compared, if you think it is good, you can sign the decoration contract, and pay attention to the clear division of responsibility when signing, including the division of safety responsibilities.

    3. Decoration, installation, in the decoration process, we should pay attention to the decoration of water and electricity and the preparation of the installed things, and we must avoid the phenomenon of delaying the project. 4. House acceptance, waste picking. The acceptance of the house requires the presence of designers, owners, construction leaders, decoration supervisors and others, and they can only pass after checking that there are no problems.

  3. Anonymous users2024-02-05

    Of course, the steps in the decoration of the rough house are to renovate the water and electricity first. The wall is hung on the shed, and then the D is paved with cement, and there is decoration and so on.

  4. Anonymous users2024-02-04

    How many steps can be taken in the whole process of renovation?

    1. Basic decoration.

    The basic decoration is also hard decoration, and the soft decoration design should be completed on the basis of hard decoration. Hydropower engineering, waterproofing engineering, ground leveling, wall and floor tile laying are these processes are very important parts of basic decoration. Once there is something wrong in a certain link, it will directly affect the comfort of staying in the future.

    2. The main part of the decoration.

    Once the foundation is complete, the next step, which is also very crucial, can be implemented. The installation of doors, windows, floors, customized wardrobes, kitchen cabinets and other decoration processes are the main body.

    3. Soft decoration part.

    For the decoration of new houses, basic decoration is the key, and after the main decoration such as door and window installation is completed, the final step can be carried out - soft decoration. Soft decoration can further beautify the space environment and make the space effect more refined.

  5. Anonymous users2024-02-03

    If you buy a house, you must renovate it before you can live in it. Whether it is preliminary decoration, simple decoration or fine decoration, it can be, mainly depending on the economic ability of the owner. Today we will talk about what the decoration steps of the rough house are!

    1. What are the steps of the decoration of the blank house?

    Step 1: Determine the area of the rough room decoration and measure the wall size.

    1. The area involved in the decoration process, especially the area of tiles, wall paint, wallpaper and floor.

    2. The size of the main wall, special attention should be paid to the wall size of the furniture in the future.

    Step 2: Reasonably dismantle and renovate the rough house, and the use of space is not wasted.

    The demolition and renovation here are mainly wall demolition, wall building, shoveling wall skin, dismantling heating and replacing plastic steel windows. It is recommended that the hydropower transformation be done in one step, and do not do the demolition or demolition, because once the bricks are on the wall and the ceiling is sealed, the follow-up work will be difficult. Therefore, it is also necessary to determine the location of switches, lamps, washbasins, bathtubs and washing machines.

    The garbage after demolition and renovation should be cleaned out in time, which is mainly to facilitate the decoration work after that.

    Step 3: Optimize the appearance of the pipes in the rough room and strengthen the decorative effect.

    Generally, the bathroom and bathroom are the most installed pipes, and these two places are also the most tangled positions in the decoration of the whole rough house, which need to be non-slip and ensure the drying effect. That's why it is said that the appearance of the pipe needs to be optimized, which has both moisture-proof effect and decorative function.

    Step 4: Mainly the paving of tiles, that is, the physical decoration of the ground. Before tiling, the floor drain needs to be prepared, and after the waterproofing and brushing are completed, it is the tiling work. The placement specifications should be grasped well, the tiles need to be soaked in water and dry, and the broken ones can be left for cutting.

    Step 5: Beautify the walls to make the rough room shine.

    To make the walls of the rough room look beautiful, it is recommended to put wallpaper.

    Generally, brush nitro paint on the place where the wallpaper needs to be pasted, and it will dry the next day. Do not open the window for 48 hours after the wallpaper is pasted, and the wallpaper should be slowly dried. If there is a warping phenomenon in some parts, you can ask the master to help repair it.

    Step 6: Arrange the installation of the socket in the blank room, and the work can be completed in half a day.

    2. Precautions for the installation of water and electricity in the blank room.

    1. First of all, think about the location, installation method and whether hot water is needed for all the equipment related to water, such as water heaters, water purifiers, kitchen treasures, water softeners, washing machines, toilets and wash basins.

    2. Think about whether the water heater is an electric water heater or gas in advance, and avoid temporarily replacing the type of water heater. The number of water outlets in the toilet is left to facilitate water flushing; Washing machine drain can consider making the drain pipe into the wall. It's convenient and beautiful, but think about the location of the washing machine first.

    3. After the waterway transformation, there should be a pressure test, and when the house is closed, you should pay attention to check whether each drain outlet in the kitchen and bathroom is smooth. In the early decoration construction, especially during the tiling of the kitchen and bathroom, it is most likely to cause the cement to fall into the drainage outlet and cause blockage; After laying the kitchen and bathroom floor tiles, you should put water to check to see if the floor drain drainage is smooth.

    Hope it helps.

  6. Anonymous users2024-02-02

    How to decorate the rough house has become a question for many owners. There are many items and materials involved in decorating a rough house, and you must understand the steps in decorating. So today I'm here to introduce you to:Steps to decorate a rough houseWhat it is, and what to pay attention to when decorating a rough house.

    If you are interested, please follow us and take a look.

    1. What are the steps to decorate the rough house.

    Step 1: Measure the area.

    Before renovating, you need to have a clear idea of the size of the house. Start by identifying the areas involved in the renovation process. In particular, the tile area, the wall tile area, the wall paint area, the wallpaper area and the floor area, and secondly, the size of the wall, especially the size of the wall where the furniture needs to be placed.

    Step 2: Modify the main body.

    The main demolition includes wall demolition, wall masonry, shovel wall skin, plastic steel windows, etc. The garbage after demolition should be cleaned up in time to ensure that the room is clean and the construction is convenient. It should be reminded that it is better to set the finished door at this stage, since the delivery time of the finished door is long.

    Step 3: Hydropower transformation.

    The placement of the stove and future household appliances in the cabinet must be determined before the hydropower retrofit, and the use of each space should be arranged before the hydropower renovation is carried out. Otherwise, once the wall tiles are installed, the ceiling will be sealed and it will be a hassle to add sockets.

    Step 4: Bricklayers and carpenters appear.

    Before entering the site early, you must buy tiles and buy floor drains before tiling. After the tiles enter the site, after the waterproofing and the foundation wool are finished, they are ready to be tiled. At the same time as tiling, the size of the basin and faucet was also determined, and the cabinet designer was invited to visit the door for the second time.

    At the same time, it is also necessary to buy good wall paints and wallpapers, etc. Next, it is the turn of the painter to enter the field to paint the wall, in addition to leveling and sanding, it is recommended to brush the topcoat at least twice. If you want to paste wallpaper, after the wall paint is painted, you can ask the master to come to the door to paste the wallpaper.

    While bricklayers and painters come in, don't forget to buy panels, sockets, and light fixtures.

    Step 5: Install the panel and kitchen ceiling.

    The socket should be equipped with a switch function, especially in the kitchen, so that the rice cooker and microwave oven can be plugged and unplugged and can be controlled with a switch. At the same time as installing the sockets, you should buy the ceiling for the kitchen. If you need to install a bath bomb, it's best to buy and install it before the ceiling.

    Step 6: Install the cabinet and finished door.

    The installation of cabinets is a collaborative project, so you should make an appointment in advance for a stove and sink. It is best to send it on the same day and install it with the cabinet. The reason for installing the finished door at this time is because the finished door installation should be installed in front of the floor, mainly because the door installation steps are complex, hinges, door locks, door stoppers, door frames, etc., and tools are used a lot.

    Step 7, first install the drying rack, etc., and then install the floorThe reason why it is recommended to install the drying rack, curtain rod, lamps, sanitary ware, bathroom hardware, and then install the floor, because these items are a lot of gray, and the floor can be avoided before installation.

    I believe everyone already understands the above suggestions. For the choice of decoration, we still have to combine our own actual situation and their own preferences. I hope that the advice on the steps to decorate a rough house will be helpful for everyone to decorate.

  7. Anonymous users2024-02-01

    Now a lot of people are buying real estate, among which the sales of rough houses are also particularly good, it can be seen that there are many people buying rough houses now, and after we buy it, everyone will decorate all their own lives, so if the decoration of these rough houses gradually becomes a topic of people, then what are the steps of rough house decoration? Today we're going to talk about these questions!

    The rough house is a house without decoration, most of the doors and windows, now the best are very expensive, semi-finished, and have also been favored by many people, especially young people who pursue individuality and can decorate according to their own preferences. What are the steps of the rough house decoration?

    Rough room decoration steps:

    1. Design in the early stage of design, go to his room for detailed measurements, don't be lazy, it's best to measure in person, the measurement content mainly includes: clear decoration process area. In particular, floor area, wall paint area, wallpaper area, floor area; Define the main wall dimensions.

    Especially later you need to design the wall dimensions of the furniture.

    2. Main body disassembly: In the construction stage, the main body dismantling is the first to be carried out, mainly including wall demolition, wall building, shoveling wall, disassembly and heating, steel window replacement, etc. The main content of the reform is to put the first framework in the first place. This is the most important step in the renovation step of the rough house!

    3. Hydropower transformation: Before the transformation of the hydropower station, the main structure of the structure should be completed. Between the two links of the hydropower renovation and the demolition of the main body, the first cabinet measurements should also be carried out.

    In fact, the so-called cabinet of first measures and no practical content, because of the wall and floor treatment, the cabinet designers could not give specific design dimensions, but, like the developers reserved in the location of the nozzles, hood sockets, made some relevant recommendations.

    The steps of rough house decoration include:1. If the outlet position of the range hood is affected, it will affect the installation of the range hood.

    2。Check the location of the water meter; 3。See if the water port is convenient for installing the sink later.

    For the first measurement of the cabinet, you can do it yourself. Once the waterway is completed, it is best to waterproof the toilet immediately. The kitchen does not need to be waterproof.

    This is an indispensable step in the decoration of the rough house!

    The main materials before the renovation, such as ceramic tiles, large core boards, etc., the entrance time should be in the renovation of water and electricity. Due to the reform of the circuit, if it involves the gutter, the position of the tiles and the large core board are not suitable, the workers move to a lot of trouble. Although the decoration steps of the rough house will be very troublesome, but the advantage is that we can make it into the kind we like, so if you really don't feel troublesome, you can buy some rough houses to let yourself show your talents, which not only allows you to save money by buying a house, but also allows you to live in the house you like, in fact, it is really very good!

Related questions
7 answers2024-03-20

The steps and methods of water and electricity decoration of the blank room are as follows: >>>More

4 answers2024-03-20

The renovation process consists of three stages. At first, it is the design stage, which requires the main decoration designer to communicate to understand the style that the owner likes, and integrate the popular trends into it, and determine the design plan before starting to screen the decoration company. >>>More

10 answers2024-03-20

Although there are many hardcover rooms on the market.

But the rough house. >>>More

7 answers2024-03-20

The decoration cost of the rough house is 50,000 yuan, and whether it can be decorated well mainly depends on the standards and requirements of the decoration. Generally speaking, the decoration cost of 50,000 yuan can meet the basic decoration needs to a certain extent, but it may not be able to achieve a high standard of decoration effect. >>>More

3 answers2024-03-20

First, in the actual new TOEFL listening test, each paragraph of the material is only read once, and in some questions, candidates can only see the questions after the material is finished, which requires listening at the same time, taking notes in a timely manner, on the basis of understanding, recording the key points in the material and the details that may be examined, in addition, in the process of note-taking, it is necessary to be clearly organized, write as neatly as possible, and advocate the use of some of their own customary abbreviations and graphics to express, so as to improve the efficiency of note-taking. And it can lay a good foundation for efficient and accurate information extraction when answering questions. >>>More