night construction 22; 00 6:00 Subject to approval by the Environmental Protection Bureau, and a notice will be posted in the community. Complaint **12369
Notice on several measures to prevent construction from disturbing the people.
2007-04-04.
Hu Jian Jian Guan (2007) No. 022.
In order to further strengthen civilized construction, reduce construction disturbances, and adapt to and promote the construction of a harmonious society, the relevant measures are hereby notified as follows:
1. The on-site fence must be continuously closed, and if the fence of the construction site is less than 5 meters away from the house, noise reduction measures such as increasing the wall and setting up barriers should be taken; The outside of the scaffolding on the construction site must be fully enclosed with a green dense mesh.
2. The construction site should be hardened, and water should be sprinkled in a timely manner to reduce dust; Cleaning roads, floors, scaffolding, seine nets and other operations should be sprinkled with water in advance; The garbage on the floor should be packed into barrels for centralized lifting or closed through the pipeline for transportation, and it is strictly forbidden to throw it at high altitude.
3. There shall be no stagnant water at the construction site; The slurry shall not be discharged at will; Construction wastewater needs to be subjected to secondary sedimentation before it can be discharged into the external network.
Fourth, the construction debris should be transported in a timely manner, and the muck that is not transported temporarily for more than 48 hours should be covered with measures.
Fifth, the vehicle entering the site should be forbidden to honk, and the cover of the muck transport vehicle should be closed and cleaned and washed before leaving the construction site.
6. Watering and dust reduction measures should be taken for mechanical operations; If the wind speed is forecast to reach level 5 or above, the outdoor demolition operation shall be stopped.
7. Promote the use of ready-mixed mortar and ready-mixed concrete, and restrict on-site mixing in the central urban area.
8. Large machinery and equipment on the construction site should be set up as far away from residential areas as possible, and maintenance should be strengthened to prevent sharp mechanical noise; Hoisting and other construction contact methods shall be used in flags, radio communications, etc., and high-noise contact methods such as whistles and steel pipes shall not be used.
9. Equipment rooms should be set up for small and noisy fixed equipment such as pressurized pumps, electric saws, toothless saws, and grinding wheels at the construction site; Shelters should be set up around mobile strong noise sources such as pickaxes as much as possible.
10. On-site loading and unloading objects should be lightly loaded and slow, and noise reduction objects such as straw bales should be laid at the loading and unloading points; Lifting equipment shall be used for the loading and unloading of large objects, and it is strictly forbidden for cars to unload.
Ten. 1. Construction at 22:00 and 06:00 at night is subject to approval; Approved nighttime construction shall reduce noise emissions in accordance with regulations, and strong lighting shall not directly illuminate residents' windows; The construction unit shall notify the surrounding community in advance of the night construction situation and noise reduction measures.
Ten. Second, deep foundation pit engineering, underground engineering to take measures to protect the underground pipeline and surrounding buildings, the construction plan should be reviewed by experts.
Ten. 3. If the construction of the project really needs to occupy the road, the approval procedures shall be handled in accordance with the regulations.
Ten. 4. During the construction period, the responsible personnel of the construction site shall take turns on duty to properly handle public complaints in a timely manner.
Ten. 5. In order to ensure the implementation of various measures, the municipal construction industry management department has set up a special agency to be responsible for accepting all kinds of construction disturbance complaints.
Notice is hereby given to the Shanghai Municipal Construction Industry Management Office.
-
I don't think so, but it's 10 o'clock at night.
-
Legal analysis: Between 10 p.m. and 6 a.m., it can be regarded as disturbing the people, and you can call the police to deal with it, and then the police will detect whether there is really a disturbance to the people, and if so, they will be allowed to correct it.
Legal basis: Article 60 of the Law of the People's Republic of China on the Prevention and Control of Environmental Noise Pollution Article 60 Anyone who violates the provisions of the first paragraph of Article 44 of this Law and causes environmental noise pollution shall be ordered to make corrections by the public security organ and may be fined concurrently. Where the people's departments at or above the provincial level decide in accordance with law that the competent departments for ecology and the environment of local people's governments at or above the county level shall exercise the administrative punishment powers provided for in the preceding paragraph, follow their decisions.
-
Legal analysis: The regulations on the time of disturbance of the people in the decoration construction are generally 8 o'clock in the morning. According to the Law of the People's Republic of China on the Prevention and Control of Environmental Noise Pollution
It is forbidden to carry out noise-generating renovation and other disturbing operations in residential buildings that have been completed and put into use on statutory holidays, holidays, and weekdays from 12 to 14 o'clock and from 6 p.m. to 8 p.m. the next day. If the operation is carried out during other periods, noise control measures shall be taken to reduce the disturbance to the surrounding residents.
Legal basis: Labor Law of the People's Republic of China
Article 1 This Law is enacted in accordance with the Constitution in order to protect the lawful rights and interests of laborers, adjust labor relations, establish and maintain a labor system suited to the socialist market economy, and promote economic development and social progress.
Article 2 This Law shall apply to enterprises and individual economic organizations (hereinafter collectively referred to as "employers") within the territory of the People's Republic of China and to workers who have formed labor relations with them.
State organs, public institutions, social organizations, and workers with whom they have established labor contract relations shall be subject to this Law.
-
Legal analysis: After 22 o'clock in the evening and before 6 o'clock in the morning, it is considered a disturbance, and you can negotiate a solution or choose to call the police to deal with it. If you need to work at night, you need to go to the Environmental Protection Bureau for night construction permit, and the noise during night construction is only 55 decibels.
During some special periods, such as large-scale events and activities such as the college entrance examination, the high school entrance examination, and the Nanjing Youth Olympic Games, there are also special requirements for the construction of relevant areas. Construction is not allowed at night, and some even require a complete halt.
Legal basis: According to Article 21 of the Regulations of the People's Republic of China on the Prevention and Control of Environmental Noise Pollution, the noise emitted by the construction unit to the surrounding living environment shall comply with the environmental noise construction site boundary emission standards stipulated by the state.
Article 23: When the emission of construction noise exceeds the national environmental noise construction site emission standards and endangers the surrounding living environment, the local people's environmental protection department may limit its operation time after reporting to the people's ** at or above the county level for approval. Article 24:
It is forbidden to carry out construction work that produces noise pollution and affects residents' rest at night in residential areas, cultural and educational areas, and recuperation areas, except for emergency repair and emergency operations. If the production process must be operated continuously or due to special needs, it must be approved by the people's environmental protection department at or above the county level.
-
Legal analysis: noise construction time in the community where the owner lives: In the property management, the noise construction time control of the community where the owner lives is very strict, generally speaking, the noise construction time from Monday to Friday is 8:00 a.m
30-9:00 to 11:30-12:
00, 2:00 p.m. to 5:30-6:00 p.m
00, there can be no noise at noon, and there is no noise all day on Saturdays and Sundays.
Legal basis: "Law of the People's Republic of China on the Prevention and Control of Environmental Noise Pollution" Article 30 In the area where noise-sensitive buildings are concentrated in urban areas, it is forbidden to carry out construction operations that produce environmental noise pollution at night, except for emergency repairs, rush to brighten and praise dangerous operations, and continuous operation due to production process requirements or special needs.
If it is necessary to operate continuously due to special needs, it must be certified by the people at or above the county level or its relevant competent departments.
For night operations provided for in the preceding paragraph, nearby residents must be announced.
-
Legal Analysis: The disturbance is between 22 p.m. and 6 a.m. In the area where noise-sensitive buildings are concentrated in urban areas, it is forbidden to carry out construction operations that produce environmental noise pollution at night, except for emergency repairs, emergency operations and continuous operations that must be required due to production process requirements or special needs.
If it is necessary to continue the operation due to special needs, there must be a certificate from the people at or above the county level or the relevant competent departments. The night operations provided for in the preceding paragraph must be announced to nearby residents.
Legal basis: Article 63 of the Law on the Prevention and Control of Environmental Noise Pollution The following terms in this Law have the following meanings:
1) "Noise emission" refers to the radiation of noise from a noise source to the surrounding living environment.
2) "Noise-sensitive buildings" refer to buildings that need to be kept quiet, such as hospitals, schools, institutions, scientific research institutes, and residences.
3) "Areas with a concentration of noise-sensitive buildings" refer to medical areas, cultural, educational and scientific research areas, and areas dominated by institutions or residential buildings.
4) "Night" means the period between 22 p.m. and 6 a.m.
5) "Motor vehicles" means automobiles and motorcycles.
-
Legal analysis: The state stipulates that the decoration time of the spring notice is between 6 am and 22 pm, and the decoration noise disturbs the public can call 12369 to complain.
Legal basis: Law of the People's Republic of China on the Prevention and Control of Environmental Noise Pollution
Article 30? In areas where noise-sensitive buildings are concentrated in urban areas, it is forbidden to carry out construction operations that produce environmental noise pollution at night, except for emergency repairs, emergency operations, and continuous operations that must be carried out due to production process requirements or special needs.
If it is necessary to operate continuously due to special needs, it must be certified by the people at or above the county level or its relevant competent departments.
The night operations provided for in the preceding paragraph must be announced to nearby residents.
Article 63? For the purposes of this Act, the following terms have the meaning of "night" means the period between 22 p.m. and 6 a.m.
Measures for the Management of Environmental Protection Reporting" Article 2? Environmental protection reports** shall use the "12369" special service ** number, and the name of each place shall be unified as "12369" environmental protection report**. The report matters accepted by the institutions that undertake the "12369" environmental protection reporting work in accordance with the law are called reports.
Article 4 Environmental protection reports must be received if there is a report, and violations must be investigated.
1.Effective. 2.Yes.
3.Want; Yes. Not knotted. >>>More
It is not possible to apply for resident medical insurance in other places, but only in the place of household registration, and you can apply for social insurance medical insurance in other places.