1. Main ventilator driver.
Finger (critical process) dictation.
General provisions Hold a certificate to work, check hidden dangers, set measures, and then operate the fan blades, the coupling is fastened intact, the bearing has no heating phenomenon, and the spindle has no cracks.
The motor has no abnormal sound and the temperature is normal.
Electronic control equipment The air test of electronic control equipment can only be operated if the air test is normal.
Damper and damper winch The winch rotates flexibly, the wire rope, connecting device and damper are intact, there is no debris in the air duct, and the explosion-proof door is free of rust and air leakage.
Accessories All instruments and protection devices are complete and reliable.
Description: 1. The opening of the ventilator must be approved by the supervisor.
2. Before operation, the manual turning car should be flexible without jamming and abnormal phenomena for 1 2 turns.
3. The ventilator is replaced once a month, and the standby ventilator must be in good condition, and the standby ventilator can be put into operation within 10min.
4. If the air volume and negative pressure of the ventilator are found, it should be reported to the competent department at a higher level in time.
5. If there is an emergency with the ventilator, the ventilator can be poured to run first, and then report to the competent department at a higher level in time.
6. The driver of the main ventilator should fill in various operation records in time.
Is this a format OK? If used after evaluation, full hair.
-
Personnel (safety inspectors) finger dictation training materials.
Before entering the well: 1. Report, I am a body examiner*** Please line up to accept the well inspection.
2. Carry complete safety equipment and labor protection equipment into the well, and confirm it.
3. If you do not carry dangerous goods, please enter the well after confirmation.
When going out of the well: 1. If the items you carry meet the regulations, you can go out of the well, and the confirmation is completed.
2. Implement the collective promotion into the well system, you can go out of the well, and the confirmation is completed.
2. When the time of entering the well meets the specified requirements, it can be out of the well, and the confirmation is completed.
-
1. Strictly implement the relevant provisions of the three major regulations of the coal mine, and be responsible for the inspection and supervision of the safety production of the project.
2. Do a good job in the publicity, education and management of safety production, and summarize, exchange and promote advanced experience.
3. Stop illegal command and illegal operation, and have the right to suspend production in case of serious danger and report to the leader of the wheel for processing.
2. On-site "finger dictation" safety confirmation.
2. Before the start of construction: conduct a comprehensive inspection of the scope of operation. Check the ventilation and mechanical and electrical equipment in the roadway, gas concentration, gas probe hanging, carefully clean up a series of unsafe hidden dangers such as live gangue on the top gangue, and all have been treated. That's it!
3. On-site command: comprehensively manage the process flow of each work in the class, conduct on-site supervision, and deal with the hidden dangers of the shift in a timely manner. Key inspections, the number of drilling positions, the depth of the angle of the bolt drilling and the quality of the installation, must comply with the provisions of the operating regulations. That's it!
4. Safety inspection after the completion of the process: focus on checking the roadway forming front, bolt anchor cable fastening force and inter-row distance, laying net and steel belt, temporary track laying quality and roadway civilized production, and there are no potential safety hazards in the working face. That's it!
5. The on-site situation has been clearly explained. That's it!
Preventive measures should be taken before the occurrence of water penetration accidents in coal mines, and underground operators should understand and do a good job of self-rescue measures after the occurrence of accidents, and the enterprise or the rescue party should organize rescue work to deal with water disasters in a timely manner and save the trapped personnel. The following are some of the rescue measures and technical measures for mine water treatment provided by Beijing Hengxiang Hongye after water permeation. >>>More
First, the mine organizes personnel to actively rescue (such as transporting pumping equipment, cables, pumps, etc.), second, notify the ambulance team that signed the agreement to go to the scene to see the disaster relief and report to the relevant management departments, third, the relevant leaders take the initiative to coordinate with the management departments (leniently) try to solve the problem with fines, it is best to talk about not going to jail, fourth, private visits (send big red envelopes), finally, analyze the cause of the accident, report to the management departments, and finally, review to the various departments.
Strict is love, loose is harmful, and do a good job of safety and benefit three generations. >>>More
What I want is a coal mine supervision and inspection system form.
First, go to a hospital that is qualified to diagnose occupational diseases, such as your local occupational disease prevention and control hospital or CDC. Countries diagnosed with occupational diseases have corresponding welfare policies. By the way, don't just listen to the diagnosis conclusions of ordinary hospital doctors, the diagnostic criteria for occupational diseases are not exactly the same as the ordinary clinical standards, and the conclusion is that three doctors with occupational disease diagnosis qualifications should make conclusions at the same time. >>>More