When will the construction of the Xidu to Jiepai Highway be completed and opened to traffic, and a f

Updated on society 2024-03-09
14 answers
  1. Anonymous users2024-02-06

    Traffic road ** is the alarm service desk, is China's public security traffic management organs.

    It is a department set up to accept the mass traffic accident police, direct and dispatch police officers to deal with various alarms and requests for help, and at the same time accept reports, complaints, and inquiries from the masses on traffic management and traffic police law enforcement issues. This department is the main component of the command center of the public security traffic management organ.

    The main components of the highway are roadbed, road surface, bridges, culverts, ferry terminals, tunnels, greening, communications, lighting and other facilities along the road.

  2. Anonymous users2024-02-05

    1. Urban roads can reach all areas of the city, for transportation and pedestrians in the city, convenient for residents' life, work and cultural and recreational activities, and connect with roads outside the city to bear the burden of external traffic.

    The literal meaning of highway is a public road, a public transportation road, cars, bicycles, rickshaws, horse-drawn carriages and many other means of transportation and pedestrians can walk, of course, different highways have different restrictions.

    2. From the analysis of traffic volume, the traffic composition of urban roads is relatively complex, but there is basically no heavy-duty traffic, and highways are the opposite. This is inevitably reflected in the design of pavement structures.

    3. The management department is different. Municipal roads are managed by the construction administrative department; The highway is under the management of the transportation administrative department.

  3. Anonymous users2024-02-04

    The main difference between urban roads and highways is that urban roads bear the rainwater drainage on both sides of the road; The highway is not responsible for stormwater drainage on both sides of the road.

  4. Anonymous users2024-02-03

    I asked you the difference between the road and the highway, you Rory, I said a lot.

  5. Anonymous users2024-02-02

    Legal definition and classification of highways, urban roads and roads.

    The Highway Law does not stipulate the definition of highways, but Article 36 of the Regulations on the Administration of Highway clearly defines the connotation of highways, that is, "highways" refer to public roads that can drive cars between cities, urban and rural areas, and rural areas that have been accepted and approved by the competent highway authorities. Highway includes roadbed, pavement, bridges, culverts, and tunnels of highways. "Highway land" refers to the land within an area of not less than one meter beyond the side ditch (or interception ditch) on both sides of the highway and the side ditch (or interception ditch).

    The specific scope of highway land shall be determined by the people at or above the county level. "Highway facilities" refers to highway drainage equipment, protective structures, crossings, boundary markers, piles, safety facilities, communication facilities, testing and monitoring facilities, maintenance facilities, service facilities, ferry terminals, flowers and forests, special houses, etc.

    In the "Regulations on the Administration of Urban Roads", Article 2 stipulates the definition of urban roads: urban roads refer to roads, bridges and ancillary facilities with certain technical conditions for vehicles and pedestrians in the city.

  6. Anonymous users2024-02-01

    Say a lot, none of them are clear, people want to know that the car is on the road, how to know if this section is an urban highway or an urban road, all the same, the road and the highway speed limit is different, and it is not easy to control the speed if you can't recognize it. It's my business for the rest of your department to take care of this road, and so on.

  7. Anonymous users2024-01-31

    The full name of the Transportation Bureau is the Transportation Bureau, which is the first administrative department, which manages transportation, transportation management, collection and inspection, road administration, highways, water transportation, etc. The full name of the Highway Bureau is the Highway Administration, which is under the management of the Transportation Bureau, and is mainly responsible for the maintenance and management of trunk roads (national and provincial roads).

    The local transportation bureau is an administrative department of the local government, which mainly manages the local roads, waterways, shipping, automobile transportation, etc.

    1) Implement the national guidelines, policies, laws and regulations related to transportation; Formulate and implement the development strategy, industrial policies and regulations of the city's transportation industry; Formulate development plans and plans for the transportation industry, and organize their implementation; Responsible for statistical work and information guidance in the transportation industry.

    2) Organize and implement the construction of national, provincial key and large and medium-sized highways and waterway transportation projects; Responsible for the construction and maintenance of the city's highway and waterway transportation infrastructure and the construction of ports, ports and shipping facilities using the industry management of the shoreline layout.

    C) responsible for the city's road and waterway transportation industry management and transportation administration; Maintain the order of equal competition in the city's road and waterway transportation market, and guide the transportation industry to optimize its structure and coordinate its development; Organize and implement the transportation of key materials and emergency transportation.

    D) responsible for the city's highway administration, waterway navigation administration and traffic fee collection management; organizing, coordinating or participating in the raising and supervision of transportation construction funds; Directing internal audits in the transportation industry; Responsible for the use of foreign capital and international exchanges and cooperation in the transportation industry.

    5) Responsible for the city's navigable waters, port water safety supervision, inland river rescue and salvage work; Responsible for ship inspection and ship anti-fouling supervision and management; Supervise and guide the safety production management of the city's transportation industry. (6) Formulate and organize the implementation of science and technology policies, plans, technical standards and specifications for the transportation industry, and organize major transportation science and technology projects; Guide and supervise the quality, technology, communication and information, environmental protection and energy conservation of the transportation industry, and promote the technological progress of the industry.

    7) Guide the administrative law enforcement and industry system reform of the transportation industry.

    8) Undertake the daily work of the Transportation Readiness Office of the Municipal National Defense Mobilization Committee.

    9) Responsible for the ideological, organizational and work style construction of the bureau organs and directly subordinate units, and strengthen the leadership of discipline inspection and supervision and mass work; guide the construction of spiritual civilization and the construction of the workforce in the city's transportation industry; Guide vocational education and training in the city's transportation industry.

    10) undertake other matters assigned by the Municipal Party Committee and the Municipal Committee.

    The Highway Bureau is an institution and a public institution under the local transportation bureau, which mainly manages the local highway construction and highway, bridges, tunnels, culverts, aqueducts survey and maintenance management, maintenance, repair and highway planning, surveying and reconstruction; And collect all kinds of highway fees, responsible for road administration, maintenance of the right of way of the highway in the jurisdiction, to ensure the smooth flow of the highway.

  8. Anonymous users2024-01-30

    The standard of municipal road bai and highway is not the same.

    First of all, the municipal road zhi

    Roads need to consider the right layout of urban pipe roads, urban green belts, bicycle lanes, etc., while highways need to consider traffic volume and traffic intensity. Therefore, municipal roads are more complex than highways, and there is a difference in management authority, municipal roads are managed by the urban construction department, and highways are managed by the transportation department.

  9. Anonymous users2024-01-29

    First of all, the standards of municipal roads are not the same as those of highways! For example, municipal roads need to consider urban pipelines (sewage pipes, electrical lines, cable pipes, water supply.

    gas pipes, etc.), urban green belts, bicycle lanes, etc., while highways mainly consider traffic volume and traffic intensity (the proportion of heavy-duty vehicles). From this point on, municipal roads are more complex in appearance than highways; Secondly, there is the difference in management authority, municipal roads are managed by the urban construction department, and highways are managed by the transportation department, but there are also intersections (for example, the former suburbs have been developed into urban areas).

  10. Anonymous users2024-01-28

    Road traffic refers to the abbreviation of "traffic."'The movement and retention of vehicles and pedestrians on the road. Sometimes this also includes parking a car. The service of the flow of people by enterprises and the movement of goods by people, and sometimes the storage of goods, are called "transportation", such as passenger transportation, cargo transportation, road transportation, railway transportation, air transportation, water transportation, etc.

    The above two are collectively referred to as "transportation" or "transportation and transportation". In China, it is also often referred to simply as "transportation", or simply as "transportation".

  11. Anonymous users2024-01-27

    (1) "Road" refers to highways, urban roads, and places that are within the jurisdiction of the unit but allow social motor vehicles to pass, including:

    Wide. Venues, public parking lots, and other places used for public passage.

    2) "Vehicle" means motor vehicle and non-motor vehicle.

    3) "Motor vehicle" refers to a vehicle that is driven or towed by a power unit and driven on a road for passenger use or for transporting goods.

    and wheeled vehicles for special engineering operations.

    4) "Non-motorized vehicle" refers to a vehicle that is driven by human or animal power and driven on the road, as well as a vehicle driven by a power plant.

    Motorized wheelchairs and electric bicycles for the disabled with a design maximum speed, empty mass, and dimensions that meet the relevant national standards.

    General tools. 5) "Traffic accident" refers to the incident of personal or property damage caused by the fault or accident of the vehicle on the road.

    Road traffic includes: people, vehicles (any car) passing on the road.

  12. Anonymous users2024-01-26

    The main function of the transportation bureau is to be responsible for road and water transportation sources.

    Ports and waterways, local railways transportation industry management, traffic fees (road maintenance fees, tolls, etc.) levy and audit management, planning, construction and maintenance, etc. The function of the Highway Bureau is to be responsible for the collection and management of traffic fees (road maintenance fees, tolls, etc.) of highways in relevant areas, as well as planning, construction, maintenance and maintenance.

    It can be seen that the functions of the Highway Bureau are included in the functions of the Transportation Bureau, in fact, it is also because the management business of the highway part of the local highway accounts for a large proportion of the separate Highway Bureau, at the administrative level, the Highway Bureau and the Transportation Bureau are at the same level or half a level, accept the guidance of the Transportation Bureau, and the specific division of labor within has clear boundaries, relatively speaking, the functions of the Highway Bureau are more specific. In some areas with a small volume of traffic business, only a traffic bureau is set up, and there is no separate highway bureau.

  13. Anonymous users2024-01-25

    The project was established to carry out the engineering feasibility study.

    Preliminary design. Technical design.

    Construction drawing design.

    Basic procedures for highway engineering construction.

    1. According to the overall urban planning and highway planning, carry out the pre-feasibility study of the project and prepare the project proposal. (Report to the provincial government and the Department of Transportation for approval).

    Second, the engineering feasibility study stage.

    1. Planning and site selection (subject to approval by the Provincial Department of Construction).

    2. Soil and water conservation evaluation (commissioned to be prepared by relevant consulting units and submitted to the competent department of water resources for approval).

    3. Environmental impact report (commissioned to be prepared by relevant consulting units and submitted to the competent provincial environmental protection bureau for approval).

    4. Apply for the pre-examination of the land for the control project (submit to the competent department for approval according to the principle of subordination).

    The Municipal Bureau of Land and Resources prepares a plan for the balance of occupation and compensation, and the Municipal Bureau of Agriculture conducts a standard farmland review.

    The Municipal Land Bureau organizes the preliminary examination.

    Municipal Agricultural Bureau for the record.

    The city reports to the province.

    Approved by the Provincial Department of Agriculture.

    Shaoxing Municipal Land Bureau preliminary examination.

    Approved by the Provincial Land Department.

    5. Prepare a feasibility study report.

    6. The feasibility study report shall be reviewed and revised according to the opinions of experts and submitted to the competent department for approval.

    3. Preliminary design stage of the project.

    1. According to the approved feasibility study report, the construction unit entrusts the survey and design unit to prepare preliminary design documents.

    2. Organize relevant departments and experts to review the preliminary design, and submit it for approval according to the principle of project affiliation according to the review opinions.

    Fourth, according to the approved preliminary design, apply to the provincial government, listed as the implementation of key construction projects (projects).

    Fifth, the construction drawing design stage.

    1. The construction unit entrusts the design unit to carry out the construction drawing design according to the approved preliminary design.

    2. Organize the review of construction drawing design.

    3. According to the review opinions, modify the construction drawing design documents and submit them to the competent department for approval according to the affiliation.

    6. In accordance with the relevant provisions of the state, carry out land measurement, land acquisition and demolition, prepare an application for construction land, declare land use to the land management department, and obtain the qualification for construction land.

    7. Organize construction, supervise bidding, and sign a construction supervision service contract.

    8. Apply for construction permits and enter the construction stage.

    9. After the completion of the project, the construction unit applies for delivery and acceptance, and the acceptance enters the trial operation stage.

    10. When the conditions for completion acceptance are met, the construction unit shall apply to the competent department of transportation to organize the completion acceptance, and the project shall be officially put into operation after passing the acceptance.

    Ten. 1. Post-project evaluation.

  14. Anonymous users2024-01-24

    Article 22 of the Highway Law stipulates that "highway construction shall be carried out in accordance with the capital construction procedures and relevant provisions prescribed by the State. "The.

    The regulations define the system of procedures for the construction of highway infrastructure in the form of law. The highway capital construction process is not only a guarantee of the quality of highway construction, but also.

    One of the contents of scientific management of highway construction.

    According to Article 8 of the Ministry of Communications Decree No. 6 of 2006 "Measures for the Supervision and Administration of Highway Construction", "highway construction shall be in accordance with the provisions of the state.

    The construction procedures and relevant provisions of the house are carried out. **The examination and approval system shall be implemented for investment in highway construction projects, and the implementation of enterprise investment in highway construction projects.

    Approval system. The competent departments of transportation of the people's ** people at or above the county level shall, in accordance with their duties and authority, examine and approve highway construction projects, and shall not exceed their authority in examination and approval

    Approve the project or simplify the construction process without authorization. ”

    According to Article 9 of the Measures for the Supervision and Administration of Highway Construction, the implementation of the first investment in highway construction projects shall be carried out in accordance with the following procedures: (1) according to the plan, the preparation of project proposals;

    2) According to the approved project proposal, carry out the engineering feasibility study and prepare the feasibility study report;

    3) According to the approved feasibility study report, prepare preliminary design documents;

    4) According to the approved preliminary design documents, prepare construction drawing design documents;

    5) Organize project bidding according to the approved construction drawing design documents;

    6) According to the relevant provisions of the state, carry out land acquisition and demolition and other pre-construction preparations, and apply to the competent department of transportation for the permit;

    7) Organize the implementation of the project according to the approved project construction permit;

    8) After the completion of the project, prepare the completion chart, project final accounts and completion financial accounts, and handle the project delivery, completion acceptance and property transfer procedures; (9) After the completion and acceptance are qualified, the organization project will be evaluated in the future.

    If there are other simplified provisions on the construction procedures for highway construction projects, they shall be implemented in accordance with their provisions.

    According to Article 10 of the Measures for the Supervision and Administration of Highway Construction, the implementation of enterprise investment in highway construction projects shall be carried out in accordance with the following procedures: (1) according to the plan, the preparation of the engineering feasibility study report;

    2) Organize the bidding of investors and determine the investors in accordance with the law;

    3) The investor prepares the project application report and submits it to the project approval department for approval as required;

    4) According to the approved project application report, prepare preliminary design documents, which involve public interests, public safety, and strong engineering construction.

    The content of the standard shall be submitted to the competent department of transportation for review according to the subordination of the item date;

    5) Prepare construction drawing design documents according to the preliminary design documents;

    6) Organize project bidding according to the approved construction drawing design;

    7) According to the relevant provisions of the state, carry out pre-construction preparations such as land acquisition and demolition, and declare the construction permit to the competent department of transportation;

    8) Organize the implementation of the project according to the approved project construction permit; (9) After the completion of the project, prepare the completion chart, project final accounts and completion financial final accounts, and handle the project delivery and completion acceptance;

Related questions