What are the job responsibilities of the construction engineering materials clerk?

Updated on society 2024-03-23
2 answers
  1. Anonymous users2024-02-07

    The main responsibility is to control the collection of materials for the project, how to be reasonable, maximize the benefits of saving costs and ensuring quality.

    The main specific responsibilities of the construction engineering materials clerk:

    1. The bulk materials of the project, such as: steel bars, cement, wood, templates, steel pipes and batch consumables are purchased by the company's material department, and sporadic materials and change materials are purchased by the project department's material staff.

    2. Master the general plan and monthly and weekly plans of the project, and prepare the best plan for engineering materials.

    3. Make market inquiries according to the material plan, shop around, and then report to the manager to determine.

    4. Be familiar with the progress of the project and the market situation, purchase according to the plan, and meet the quality schedule requirements.

    5. Master the performance and quality requirements of the material, and provide the certificate to the technician according to the inspection batch.

    6. The materials that need to be re-inspected shall be re-inspected according to the inspection batch, and the re-inspection form shall be given to the technician.

    7. Grasp the regional information of the material, and the situation of the supplier, and collect first-hand information.

    8. Grasp the inventory of materials and adjust the material plan in time.

    9. For the purchase of materials that do not meet the requirements, they should not be used in the project, and they should be solved through negotiation.

    10. Master the materials and budget, such as the material budget and timely feedback information to the budget staff for approval.

    11. Timely grasp the on-site engineering changes and timely supply.

    12. Materials are stored and reimbursed in a timely manner, and the reimbursement time cannot exceed three days.

    13. Supervise the use of materials, stop the waste and damage of materials in a timely manner, and punish the relevant personnel.

  2. Anonymous users2024-02-06

    In today's social life, job responsibilities are used more and more frequently, and job responsibilities are the basis for organizational assessment. Don't have a clue when it comes to job responsibilities? The following is my carefully organized building materials clerk's job responsibilities, welcome to read and collect.

    Job Responsibilities:

    1. Cooperate with materials to do a good job in the measurement of various materials;

    2. According to the company's system regulations, do a good job in material acceptance, warehousing, warehousing and inventory management at the construction site, and do a good job in material registration ledger;

    3. Responsible for filling in and making receiving documents and controlling the quality of materials;

    4. Responsible for the stacking planning, sorting and tidying of on-site materials;

    Qualifications:

    1. Age 22-45 years old, technical secondary school degree or above, excellent fresh graduates can be trained;

    2. Understand computer operation and be able to enter basically;

    3. Work conscientiously and responsibly, be careful, have a strong sense of responsibility, be able to bear hardships and stand hard work, and have a good sense of teamwork and cooperation spirit;

    4. Experience in construction sites is preferred.

    1. Familiar with the construction process, prepare the material plan, and organize the material entry according to the plan.

    2. Be responsible for the quality of incoming materials and do a good job of tracking services. Grasp the use of materials.

    3. The materials entering the site should be stacked in different categories, and effective anti-corrosion, moisture-proof, and anti-deformation (quality) measures should be taken according to the nature of the materials.

    4. The materials that need to be re-inspected should be sent for inspection in a timely manner, and correspond to the materials entering the site.

    5. Timely statistics and reporting of on-site material loss.

    6. Ensure zero inventory and rational application of backlog materials.

    7. Establish material analysis files (**, source) and feedback decision-making level of Jingxiang Yinshi.

    1. Engage in the planning, procurement, inspection, statistics, and accounting of construction materials at the construction site of construction and municipal engineering;

    2. Participate in the preparation of material and equipment configuration plans;

    3. Participate in the establishment of material and equipment management systems;

    4. Responsible for collecting information on materials and equipment, and participating in the evaluation and selection of units;

    5. Responsible for materials and equipment. Purchase, participate in the management of procurement contracts;

    6. Responsible for the acceptance and sampling re-inspection of incoming materials and equipment;

    7. Responsible for the receiving, distribution and storage management of materials and equipment after entering the site;

    8. Responsible for supervising and inspecting the reasonable use of materials and equipment;

    9. Participate in the disposal of remaining and unqualified materials and equipment;

    10. Responsible for establishing material and equipment management accounts;

    11. Responsible for the inventory and statistics of materials and equipment;

    12. Participate in the cost accounting of materials and equipment;

    13. Responsible for the compilation of materials and materials for banquet preparations;

    14. Responsible for summarizing, sorting and handing over materials and equipment materials.

Related questions
8 answers2024-03-23

The new process of construction engineering refers to a process that involves all aspects of the construction industry such as civil engineering, decoration materials, thermal insulation materials, and pipelines compared to the traditional process, breaks through the original and old construction processes and operating methods, and adopts modern high-tech construction technology in order to obtain better technical and economic benefits. >>>More

9 answers2024-03-23

1) Work under the leadership of the project manager and the technical director, implement the ISO9001 quality system program management operation, be responsible for collecting the documents and engineering data of the construction site for sorting and keeping, and require the project data to be neat and complete. >>>More

6 answers2024-03-23

First, first enter the venue to prepare:

1. Project commencement report, construction permit, construction organization design, materials and equipment for review. >>>More

1 answers2024-03-23

There are many types of rules and regulations for construction enterprises, which can generally be divided into three categories according to their role and nature. >>>More

4 answers2024-03-23

The engineering construction project accountant should do a good job of the corresponding work content and job responsibilities, specifically: >>>More