-
I believe that you are in a hurry, and I will help you translate it as follows. It can be seen that life-threatening things such as medication instructions are very dangerous to find someone to translate them casually:
Description: Metformin hydrochloride tablets are biguanide oral hypoglycemic agents for patients with non-insulin-dependent diabetes mellitus (type 2) who have failed to control their diet alone. It can be used as a primary ** drug or as an adjunct drug; It can be taken alone or with insulin or sulfonylureas.
Dosage and how to use:
Metformin is taken by mouth, initially at an initial dose of 500 mg three times daily; It can also be taken twice daily at 850 mg and with meals. The dosage can be gradually increased as needed, but should not exceed a maximum of 3 grams a day. It can take up to two weeks to control the condition.
Once achieved, medication can be reduced to maintenance levels.
-
Procedure. This process assumes that the back cover, taken out, and power machine is closed, and you are ready to enter the modulator cabinet.
1 Using the grounding rod, the short nail assembly ensures that all remaining charges are based on it and it is safe to proceed.
2 refers to the service manual for the prevention section and reviews the system regarding the handling of the SF 6 before relieving the pressure, it must be completed before removing any hardware from the magnetron flange.
3. The gas pressure release valve is located near the four ends of the gantry.
4. Carefully remove the hard drive assembly and keep the small plastic coupling between the drive motor and the magnetron.
5. Remove the solenoid on the front panel and reserve.
Disconnection. 1 pulse cable disconnect from the top of the magnetron.
Pay attention to the direction of the wire of the pulse cable. Smaller shielded wires go to the side of the magnetron.
Keep the hardware and capacitors with tubes.
2 drainage regulator wells with half of the water put into clean containers, it will not overflow the water when the line is disconnected and air is introduced into the system.
3 Carefully disconnect the water hose from the magnetron and secure to the side of the machine to avoid leakage to the electronic or RF transmission lines.
4. Remove the ground terminal and keep the hardware.
5. Remove the fastening screws from the round base of the magnetron and place it in a safe place.
6 The magnetron is completely disconnected, carefully, with a towel in hand, the lifting tube of the house does not leak any water that may still be inside the tube.
7 Remove the O-ring and inspect for flange pinching, arcing, or other abnormalities.
8. Cover the opening of the RF transmission line with an east-west opening to prevent objects from falling in.
9. Wipe clean with an alcohol cotton ball, flange the new magnetron and the flange of the RF transmission line and install the new O-ring. (If there is no new o-ring, then clean up the old swab and reinsert it into the coupler.) )
10 records of the date of relocation, high voltage and filament hours of the old magnetron information label. Calculate the total time and months of usage and record your tickets.
Magnetron alignment blocks.
In December, 2002, the magnetron alignment block introduced a brand new magnetron. If you replace the magnetron on the machine there is no alignment block (serial number 5860932) it is recommended that you add it during this process (each indicated, in this section).
Translate so much that you only give 50 points?
The number of documents is comprehensively stated.
It includes the current research status of domestic potato macroslabs! >>>More
Design description. The sample design description is as follows: >>>More
The English abbreviation of "plastic material" is:
plastic >>>More
Wait, I know, but I forgot, I have to look up the book, is that okay?