Hotel decoration customers on the construction period requirements are generally tight, because the rent of the store began to pay rent, a few days in advance is to help customers save budget, some sales season can not be missed, according to the actual situation of each project, as short as 20 days, long more than 3 months, which has a lot of influencing factors, briefly described as follows:
1. Whether large-scale structural changes are involved, the more structural changes, the longer the construction period. For example, whether to use steel structure to build two floors, whether to pour concrete stairs, which requires sufficient maintenance time.
2. Whether it can only be constructed at night, many public spaces are not allowed to be constructed during the day, which requires some low-noise construction to be arranged during the day, and overtime at night to do loud work such as slotting. When working at night, the efficiency of workers will inevitably decrease, and the construction period will also increase.
3. Property factors, property approval is required for construction, and the progress of approval is also one of the factors affecting the construction period.
4. To save time, there should be a rigorous and effective engineering organization arrangement, all the work goes hand in hand, the materials are at least prepared before various processes, and the display cabinets, bar counters, seats, etc. that can be processed outside can be processed more externally, and the finished product is customized, which is a coordinated and balanced process to prevent nesting.
5. On-site management yields benefits, workers' supervision and management, rigorous delay and laziness, planning and layout of the construction site, distance between materials and construction, etc.
6. The complexity of the process, whether the carving of the artificial pattern is complicated, and whether the modeling of the ceiling requires a lot of man-hours.
7. Whether the design plan is confirmed in time and how much the medium-term plan has been changed.
8. Weather reasons, especially in the hot summer, because the construction site has not yet installed air conditioning, resulting in reduced work efficiency of workers.
9. The size of the area is not completely proportional to the construction period, although the sparrow is small, the five organs are complete, the area is small and the process is also needed, as long as the process is coordinated, the total construction period can also be appropriately compressed.
-
The first thing to face is the problem of hotel store decoration design. First of all, it is necessary to find a good store, after the hotel is rented, make an appointment with a professional designer to go to the site to measure, according to the needs of the room structure, hotel function and other needs, the designer will make a preliminary plan, concept drawing and other materials for the customer's reference. Secondly, after the customer is satisfied with the plane scheme and design concept, the design contract is signed to further deepen the design, which should not only meet the functional needs of the hotel but also pursue reasonable beauty, and provide renderings that fully reflect the design concept and hotel style.
Next, the designer should provide complete construction drawings, including elevation drawings, hydropower drawings, wall remodeling drawings, etc. It will take about two months together.
-
It requires the hotel customer to be completely safe in maintenance as well as to start investing resources to pay the rent, a few days in advance to help the customer save budget, how long the renovation period of the 1000 square hotel may not be some depending on the location of each project briefly lost seasonal sales. In 20 days, the weather is more than 3 months. Many factors may apply:
t2.Is it possible to build only at night, and many public places cannot be built during the day? It needs some tiny structure.
How long is the renovation period of 1000 square meters hotel, daytime, overnight work, clean work, etc. At night, the skills of the person will inevitably decline, and the construction season will rise.
3.The need for property assets, site construction permits, and the progress of the agreement are also among the factors that affect the construction phase.
4. Save time for efficient and effective organization arrangement, everything is done manually, all materials are still made different processes before, how long is the renovation period of 1000 square hotel It can be standardized for off-site processing, bars, seats, etc., it is a coordinated and balanced process to avoid work.
5. On-site management benefits, employee buried limb direction and management, delay delay, site design and appearance, distance between materials and Li ruler construction, etc.
6.The complexity of the method, at least one artificial carbhachadh pattern is extremely intricate, and at least one of the desired shapes is required every hour at the top.
7.Was the plan confirmed at one time and what are the changes in the medium-term plan?
These conditions indicate weather conditions, especially during the summer heat, while no ventilation system is installed on the site, which leads to operational efficiency.
9.There is no size and the length of the area completely distinguishing small gealbh small and perfect, requiring a small different approach, as well as in the process of time coordination, to be able to accumulate time well as a whole.
Construction project management must be considered from the point of view of quality, investment and development. It is believed that the time should be reasonable to build which liquid height should have a working foundation and foundation for three months, and each major project is about 10 days a day, about 6 months. It also lasts for 6 months and is valid for 12 to 14 months.
The length of life is longer than that, and the closure of winter should take into account that the value of winter is rising.
You can get it for free
-
Summary. Hotel decoration schedule (1) main body demolition - entry, wall demolition, wall building. (2) Hydropower transformation - chisel trunking, hydropower transformation and acceptance.
3) Package pipeline - buried trunking concealed hydropower renovation project, closed water experiment without leakage to start waterproof engineering (4) tiling - bathroom, kitchen wall magnet. (5) Carpentry (passes, etc.) -- carpentry entry, hanging ceiling, gypsum corners. --Cover door covers, window covers.
Making wooden cabinet frames - simultaneous production of various wooden doors, modeling doors and flat pressing. --Wood veneer paste, line production and fine installation (6) Brush oil -- Wooden panel brush dustproof paint (clear oil). (7) Brush wall paint or paste wallpaper - wall base treatment, sanding, leveling.
Wall oil ici at least three times - furniture paint in, nail holes, paint. (8) Corner treatment - household goods, stickers (protective edges) at the seams of the door (9) installation of socket panels (10) bathroom ceilings (11) cabinets (12) installation of finished doors (13) installation of lamps, sanitary ware, bathroom hardware (14) installation of drying racks, window rails (15) floor --- corners, laying floor tiles, solid wood or composite wood flooring, waterproof marble strips, baseboards. Hope it helps.
Not really. Hotel decoration schedule (1) main body demolition - entry, wall demolition, wall building. (2) Hydropower transformation - chisel trunking, hydropower transformation and acceptance.
3) Package pipeline - buried trunking concealed hydropower renovation project, closed water experiment without leakage to start waterproof engineering (4) tiling - bathroom, kitchen wall magnet. (5) Carpentry (passes, etc.) -- carpentry entry, hanging ceiling, gypsum corners. --Cover the door cover, the window lacks the Zen set.
Making the frame of the wooden Fuyou dust cabinet - making all kinds of wooden doors, modeling doors and flat pressing at the same time. --Wood veneer paste, line production and fine installation (6) Brush oil -- Wooden panel brush dustproof paint (clear oil). (7) Brush wall paint or paste wallpaper - wall base treatment, sanding, leveling.
Wall oil ici at least three times - furniture paint in, nail holes, paint. (8) Corner treatment - household goods, stickers (protective edges) at the seams of the door (9) installation of socket panels (10) bathroom ceilings (11) cabinets (12) installation of finished doors (13) installation of lamps, sanitary ware, bathroom hardware (14) installation of drying racks, window rails (15) floor --- corners, laying floor tiles rolling, solid wood or composite wood flooring, waterproof marble strips, baseboards. Hope it helps.
After the decoration is completed, it will be accepted.
-
Generally speaking, there is definitely more than one hotel decoration. If for some special reasons, you need to decorate a guest room in one of them, you can also do it.
First of all, it is necessary to make a plan for the design section, which takes less than a week, because it is necessary to communicate with the owner to determine the design plan.
The decoration style is different, the materials used are different, and the construction period is different.
Generally speaking, it takes about 15 to 45 days, and the cost ranges from 10,000 to 100,000 yuan.
-
It depends on the plan and date proposed by the renovation team hired by the hotel.
-
Summary. During the renovation of the hotel, arrange in advance what to do when the project is approached.
-
The decoration of a five-star hotel is too early to sign a contract one to seven days in advance. The lead time for signing the contract is only slightly longer than the decoration company that can prepare materials, machinery and manual construction after receiving the decoration payment. At least half a month in advance.
Extension: How to sign a renovation contract:
You have to pay attention to the details of the contract, budget and post-settlement, material costs, design drawings, labor costs, acceptance and other details given by the decoration company. Three tips for signing a renovation contractAbout design drawings: Many home renovation disputes are reflected in the understanding of the project.
For example, because there are no more detailed drawings, there may be some gaps between designers and consumers in understanding, and there will be gaps in the specific size of some projects due to unclear drawings. Therefore, when signing the contract, try to prepare the drawings as much as possible to avoid unnecessary troubles in these aspects after the start of construction. About the contract documents:
In addition to the project budget and design drawings, a relatively complete home improvement contract should also include the construction technology, construction plan and material purchase orders of both parties A and B for key construction projects. The construction process is a magic weapon that restricts the construction party to strictly implement the agreed process practices and prevent cutting corners. Therefore, there should be a detailed construction plan in the contract, mainly because the current phenomenon of home renovation delaying the construction period abounds.
-
How long does it take to move in a new house? 1. Ordinary adults, ventilated for 3 months, can move in; 2. For children who are resistant to coarseness, they can only move in after more than half a year of ventilation; 3. If Jianzhenguo is pregnant, Mu Fang should also be ventilated for half a year before moving in;
Many villa decoration owners have complained that the construction period is too long or even postponed, resulting in the postponement of the move-in time, villa decoration is a complex and meticulous project, due to too many villa decoration details resulting in the decoration period can not be accurately estimated, can only be estimated according to the room type, area and construction requirements, let's take a look at how much time it takes to decorate a villa. >>>More
Article 19 Where the term of a labor contract is more than three months but less than one year, the probationary period shall not exceed one month; If the term of the labor contract is more than one year but less than three years, the probationary period shall not exceed two months; For fixed-term and indefinite-term labor contracts of more than three years, the probationary period shall not exceed six months. >>>More
It only takes an hour or two.
Car waxing, as a traditional project of car beauty, the role of waxing is first of all waterproof, acid rainproof, due to the protection of car wax, will reduce the amount of water droplets attached to the body, the effect is very obvious, can reach 50% to 90%; The second is to prevent high temperature and ultraviolet rays, the weather is getting hotter and hotter, and the car is easy to cause the aging and fading of the paint due to light when driving or storing it all year round, and the film formed by waxing can reflect part of the light, effectively avoiding the aging of the car paint. >>>More
PLC is a kind of intelligent controller, which is a computer (PC).PLC is a programmable controller. PLC is a programmable controller >>>More