What are the accounts that need to be calculated for the renovation budget? What to pay attention to

Updated on home 2024-04-10
7 answers
  1. Anonymous users2024-02-07

    1. Design account: Entrust others to design to pick the hand, and the design fee accounts for 5-20% of the entire decoration cost. 2. Data account:

    The current decoration information has been a product of the flow of homework, decoration has become a form, run three building materials market, you can inquire about the price. However, at the beginning, the decorator should list the specific material menu and mark the approximate price of the market, so as to negotiate the price when the material is collected. Secondly, let the decorator budget the amount of various decoration materials to prevent the decorator from cutting corners.

    3. Inquiry: Inquiry is actually bargaining, in the decoration data market, the business can bargain, and the goal of inquiry is to find out the reserve price of the information. 4. Budget:

    On the basis of design and asking for price, work with the decorator to budget the cost of the entire decoration materials. 5. Work account: Before decoration, it is necessary to set aside enough time to design, materials, inquiry and pre-design, the more abundant the preparation, the faster the decoration can be.

    In terms of work arrangement, as far as I am concerned, I should arrange the materials in order, and the decoration process should be synchronized and slightly earlier, so as to avoid missing the construction period. 6. Equity account: sign the decoration contract, which should include the information used, the designated brand and the price agreed by both sides.

    It is also necessary to pay attention to the fact that after the decoration acceptance, if there is a problem, Party A should assume the position within the time limit of the rules, and this should be indicated in the contract.

  2. Anonymous users2024-02-06

    In addition to the decoration costs of floors, walls, ceilings, doors and windows, there are also costs for furniture and electrical appliances for interior decoration. The ratio of furniture and decoration should be 1:1, and even the cost of furniture is higher.

    Nowadays, many people spend their money on expensive decoration materials, and rarely think about furniture, in fact, it is furniture, ornaments and art decorations that really affect the atmosphere of the family.

    Among them, the decoration cost can be divided into three types according to its spending method: design cost, material cost and labor cost. The so-called design fee refers to the design fee for you to help you with space planning, drawing a variety of floor plans, including floor layout, ceiling layout, compartment size, water and electricity configuration, section elevation, perspective drawing, and responsible for on-site supervision and guidance. The design fee accounts for no more than 10% of the total decoration cost in the decoration.

    The material cost accounts for about 40% and 50% of the total cost of the decoration. The selection of materials should be based on the requirements of design and use function, not blindly pursuing luxury, or looking for low-cost materials in order to reduce costs, and quality should be the focus of attention.

    Labor costs account for about 30% of the total cost of decoration. The qualifications, reputation, and number of projects undertaken by the decoration team are necessary conditions for selecting decoration personnel. The size of the project, the length of the construction period, the complexity of the design, and the difficulty of construction all have a direct impact on the labor cost.

    The following is illustrated by taking the mid-range decoration standard as an example. Materials: living room walls and ceilings brush Dulux latex paint, the ground is made of composite flooring, the bedroom floor is laid with composite flooring, beech wood composite doors and plastic steel windows are used, wooden door sets are made, long wooden curtain boxes, marble window sill boards, balcony sealed aluminum alloy windows, kitchens and bathrooms are paved with pan-Asian floor tiles, pan-Asian bricks are attached to the wall, and the ceiling is made of aluminum alloy gusset for the ceiling. Marble or stainless steel countertops, stainless steel washing basins and faucets, installation of range hoods and water heaters, electrical switches, sockets, wiring, lighting, etc., the cost is about 17,000 yuan.

  3. Anonymous users2024-02-05

    Many of the above are not used, and there is also the need for workers' wages, which is not a small amount!

  4. Anonymous users2024-02-04

    When making a renovation budget, you need to pay attention to the following aspects: decoration ** device (click to start calculating).

    1.Determine the demand: determine the decoration needs and style, and formulate a budget plan in a targeted manner to avoid budget constraints caused by blind purchase or repeated use of materials and projects.

    2.Purchase materials: When selecting materials, pay attention to the quality, use, and other details of the materials, so that you know what to expect, and listen to the opinions of experts or experienced people to determine whether the quality of the materials is reasonable.

    3.Consider hidden costs: In terms of renovation budget, you need to consider hidden costs, such as water and electricity pipe renovation, design changes, tile joints, smart home systems, etc., which need to reserve a certain budget.

    4.Pay attention to the construction time: the renovation schedule also needs to be considered, and the time node should be formulated. Generally, this time node needs to be coordinated between the construction team and the customer, and it is recommended to adopt a clear construction agreement to avoid the budget getting out of control due to the construction schedule and delays.

    5.Reserve a floating budget: Reserve a certain floating budget as a reserve fund to deal with possible changes, additions, and repairs, etc., and also need to set aside a certain budget for home improvement after completion.

    6.Master the quality standards of decoration: In the budget process, it is also necessary to understand the quality standards of decoration to avoid the increase in repair and maintenance costs in the later stage due to quality problems.

    7.Use an experienced decoration company: Choose an experienced decoration company, you can get reasonable decoration suggestions and technical guidance in actual operation, and it is easier to control the budget in the whole decoration budget process.

  5. Anonymous users2024-02-03

    What to pay attention to in the renovation budgetSpending money on the cutting edge also requires some understanding of some accounts in terms of renovation budgets. As well as a little knowledge of some calculation methods in construction, to prevent being fooled, but also to help count money.

    There are still some tricks to learn about renovation budgeting. From 5 aspects, I will introduce the precautions for decoration budget.

    1.Design account: If the owner designed it himself. Effect and time must be considered; Entrusting others to design should be selected by experts, and the design fee accounts for 5% to 20% of the entire decoration cost.

    2.Material account: At present, the decoration materials next to the Wang material has been a productized flow operation, decoration has become a model, in fact, it is a combination, so after taking three or five building materials market, you can consult the bottom price, but first of all, the builder should list a detailed list of materials, calibrate the approximate market.

    to bargain for material picking; Second, let the builder estimate the amount of material needed and specify the proportion of the remaining loss. In case the builders cut corners. The budget is based on the design and the design, and the material cost of the entire decoration is calculated together with the builder.

    Digging socks The big decoration budget can't be saved, don't pick the sesame seeds and lose the watermelon;

    2. Real owners: where should the important capital budget for home improvement be placed?

    3.Time account: Before decoration, we must leave enough time to design, materials, inquiry and budget in place, the more adequate the preparation, the faster the decoration speed; If you prepare your own materials. It is necessary to arrange the picking sequence, use first and buy first, and then use and then buy, so as to prevent delays and delays for a long time.

    4.Equity account: Before the decoration, the contract should be signed with the construction party with decoration qualifications, and the contract content should include the quantity, specifications, **, decoration cost, labor level, and completion time of the materials used; Other than that.

    When signing the contract, you must pay attention to the decoration acceptance, if there is a problem. The construction party should be responsible within the specified time limit, because it is difficult to find quality problems during general acceptance, and only live for a period of time to be exposed, this problem is the most quality guarantee, and the contract must be indicated, and must not be negligent.

    5.Paint dosage calculation method: People use paint to decorate the wall, often encounter a problem, do not know how much paint to use.

    Buying too much is wasteful. If you buy less, you have to buy it again, and it will cause different colors to affect the appearance. In fact, the calculation is very simple, as long as the area of the room to be painted (square meters) is divided by 4, and then the height of the wall to be painted (meters) is divided by 4, the sum of the above two quotient values is the number of paints required (kg).

    For example: a room of 20 square meters, the paint required is: 20 4 = 5 The height of the stucco wall is 4 meters, 4 4 = 1, add the two quotient values:

    5+1=6, then you can buy 6 kg of paint and apply it twice.

    You can get it for free

  6. Anonymous users2024-02-02

    The decoration budget includes all the expenses in the decoration process, such as the cost of decoration materials, labor costs, design costs, supervision costs, after-sales service costs, etc.

    The specific decoration of the house** can be calculated here, just enter the area + city, and calculate the decoration in 3 seconds**: [Click here, free decoration**].

    When making a renovation budget, we need to take into account all the expenses in the renovation process, and we should carefully understand the local renovation market** and ** level to estimate according to our own needs and financial capabilities. At the same time, it is necessary to understand the cost of each decoration, it is recommended that you list each cost in detail, and allocate the material cost and labor cost as reasonably as possible to ensure the reasonableness of the overall decoration budget. Nachai empty.

    For the various expenses in the decoration budget, the decoration company will give you a list of the approximate cost of the main materials, household appliances, lamps and other items required for different structures, which can help families better formulate the decoration budget, and it is recommended that you can refer to it. ** is based on the local market price, seeking truth from facts, and users can adjust it according to the ** in the table and the specific situation of the region.

    In short, before formulating a decoration budget, it is necessary to grasp the local decoration market and various tariff standards, refine the various expenses, and recommend a variety of ways to collect decoration information, including on-site visits, consulting a number of decoration companies, using decoration platforms, etc. At the same time, it is recommended that you take into account that reasonable spending is necessary, but the emphasis is on "moderation", and make a reasonable budget according to your own financial strength and actual needs.

  7. Anonymous users2024-02-01

    The calculation of the renovation budget is determined based on factors such as the size of the house, the style of decoration, the choice of materials, and so on. Generally speaking, the renovation budget can be divided into the following aspects:

    If you want to know the specific decoration**, you can use the "decoration artifact" ** device to calculate, just enter the area + city, immediately calculate the local decoration**, list the detailed list of 102 decorations, so that you don't have to worry about overspending on the decoration, click here to start calculating: [3 seconds to get the local decoration**].

    1.Basic decoration costs: including wall painting, floor laying, ceiling treatment, etc. According to the local market price, the basic decoration cost per square meter is generally between 200-500 yuan.

    2.Indoor water and electricity renovation costs: including the arrangement of water pipes and wires. According to the specific situation of the house, the cost of water and electricity renovation per square meter is generally between 200-500 yuan.

    3.Furniture and appliance costs: Depending on individual needs and brand choices, the cost varies greatly. Generally speaking, furniture and appliances account for about 30% of the entire renovation budget.

    4.Decoration material cost: including floor tiles, wall tiles, wooden floors, paint, etc. Depending on the brand and quality of the material, the cost varies greatly. Generally speaking, the cost of decoration materials accounts for about 30% of the entire decoration budget.

    5.Ancillary engineering costs: including cabinets, bathrooms, lamps, etc. Depending on individual needs and brand choices, the cost varies greatly. Generally speaking, the cost of ancillary works accounts for about 20% of the entire renovation budget.

    6.Design and construction costs: Depending on the level and experience of the designers and construction teams, the costs vary greatly. Generally speaking, the design and construction cost accounts for about 20% of the entire renovation budget.

    It should be noted that the above fees are for reference only, and the specific costs need to be determined according to the specific situation of the house and personal needs. When formulating a decoration budget, it is recommended to consult several decoration companies, compare **, and choose a cost-effective plan. At the same time, it is important to leave some budget room for possible surprises and changes.

    Tuba Rabbit is one of the largest decoration platforms in China, with a total of more than 41 million owners, 110,000 decoration companies, covering more than 300 cities across the country, and the user reputation is very good, not only to meet your decoration needs, but also to provide professional decoration companies according to your budget

Related questions
5 answers2024-04-10

Renovation company project budget.

Serial Number Project Name Unit Unit Price Quantity ** (Yuan) Process Description. >>>More

10 answers2024-04-10

I also majored in civil budgeting. Regarding the trade-off between civil engineering and decoration, I think we should first ask ourselves what the budget is for, because only by determining what you want can you have a clear goal implementation plan. If it is based on interest, I personally think that for the purpose of charging, you can learn, starting from civil engineering, decoration is easier to read, on the one hand, civil engineering is the foundation, and the second is a wide range of applications. >>>More

9 answers2024-04-10

1.Hydropower below 80 square meters of units in 2000 yuan 5000 yuan, 120 square meters of units in 4000 yuan, 8000 yuan in general, home improvement companies will pre-charge 1000 2000 yuan of water and electricity advance. 2. Floor tiles, wall tiles, floor tiles, and wall tiles are much more complex than floors, and they require the meticulous work of decoration workers, so the cost of paving floor tiles and wall tiles is more than that of flooring. >>>More

7 answers2024-04-10

We all know that decoration is a very deep knowledge, the development of the decoration industry has risen a lot of decoration methods, now the decoration has the concept of half-package repair or full-package repair, half-package repair is a way between the clear package and the half-package, the construction party is responsible for the construction and the procurement of accessories, the main materials are purchased by the owner. So what are the items included in the home renovation half package budget? Responsible for indoor structure renovation (such as wall demolition or new wall), then Responsible for hydropower renovation construction (water supply and drainage design and installation, circuit design and installation, sanitary ware installation, etc.), Responsible for mud construction (backfilling, ground leveling, waterproof treatment, wall tiles and floor tiles, etc.) Responsible for wood construction (ceiling, modeling production and some on-site production of furniture, etc.) Responsible for paint construction (wall, wallpaper or latex paint, furniture paint, etc.) Some of the above parts may be installed by the seller, such as sanitary ware. >>>More