What documents are included in the construction approval document for construction projects?

Updated on society 2024-04-22
8 answers
  1. Anonymous users2024-02-08

    1. Information required for construction project application:

    1. Site selection opinion (Planning Unit of Construction Bureau).

    2. Environmental impact assessment documents for construction projects (Environmental Protection Bureau).

    3. Water protection approval (Water Conservancy Bureau).

    4. Approval of seismic fortification requirements for construction projects (Earthquake Prevention and Disaster Reduction Bureau) 5. Project approval documents for construction projects (Development and Reform Bureau or higher-level competent departments) 6. Construction land planning permit (Planning and Management Unit of Construction Bureau) 7. Construction land approval document or land use right certificate (Land Bureau).

    8. Proof of construction funds (financial sector).

    9. Special review form for seismic fortification of construction projects (review by the Construction Management Section of the Construction Bureau) 10. Preliminary design approval (Construction Management Market Management Unit).

    2. Materials required for construction permits:

    1. Fire review opinions (fire brigade).

    2. Construction project planning permit (Planning Management Unit).

    3. Survey and design contract (construction unit).

    4. A copy of the qualification of the survey and design enterprise (survey and design unit) 5. Construction drawing review report (drawing review agency).

    6. Construction drawing review certificate (drawing review agency).

    7. Construction drawing design document review and filing form (construction management market management unit) 8. Notice of winning the bid for the project (bidding office).

    9. Construction contract (copy) (construction unit).

    10. The bidding documents of the winning enterprise project (construction unit) 11. A copy of the qualification certificate of the construction enterprise (construction unit).

    12. A copy of the safety production license of the construction enterprise (the construction unit) 13. The record of the contract price of the construction project (bidding office).

    14. Construction project integrity contract (Supervision Bureau).

    15. Supervision contract or owner management agency (construction unit).

    16. Accident insurance invoice for construction personnel (insurance company) 17. Quality supervision certificate and safety supervision certificate (quality supervision station).

    18. Solicitation of opinions on the design of lightning protection devices (Meteorological Bureau) 19. Notice of pre-deposit of migrant workers' wage deposit (Labor and Social Security Bureau) (3% of the contract price of the construction project).

    20. Notice of Wage Reserve for Migrant Workers (Labor and Social Security Bureau) (construction unit, 10% of the contract price).

    21. Application Form for Construction Permit for Construction Projects (Construction Management Market Management Unit)**!!

  2. Anonymous users2024-02-07

    1. Site selection opinion (Planning Unit of Construction Bureau).

    2. Environmental impact assessment documents for construction projects (Environmental Protection Bureau).

    3. Water protection approval (Water Conservancy Bureau).

    and so on.

  3. Anonymous users2024-02-06

    Construction, project, engineering, laying, investment, commonly known as engineering construction projects refer to all kinds of housing construction, civil engineering, equipment installation, pipeline laying, decoration and other fixed asset investment in new construction, expansion, reconstruction and technical transformation and other construction projects, commonly known as engineering construction projects. All engineering and construction projects invested and built in China must implement the construction application system and accept the supervision and management of the local construction administrative department or its authorized agency.

    1. What are the requirements for construction enterprises to apply for qualifications?

    Construction enterprises refer to enterprises engaged in new construction, expansion and reconstruction activities of civil engineering, construction engineering, line and pipeline equipment installation engineering, and decoration engineering.

    The Ministry of Construction's Regulations on the Administration of Construction Enterprise Qualifications clearly states that construction enterprises shall apply for qualifications in accordance with their registered capital, net assets, professional and technical personnel, technical equipment and completed construction project performance, and pass the examination. After obtaining the corresponding level of qualification certificate, you can engage in construction activities within the scope permitted by your qualification level.

    2. Supervision and management of general contracting of projects.

    On the basis of the draft for comments, the competent department of housing and urban-rural development shall guide and supervise the general contracting activities of the project, and the competent investment department shall supervise and manage the approval, approval and filing of the investment project, and further refine the regulatory basis: the competent department of housing and urban-rural development shall supervise and manage the general contracting activities of housing construction and municipal infrastructure projects, and the development and reform department shall perform the corresponding management duties in accordance with the relevant laws and regulations on the management of fixed asset investment and construction.

    In addition, from the separate chapter on supervision and management in the draft for comments, to the official document deleting the supervision and management requirements such as safety production license management, safety production assessment certificate, construction drawing design document review, construction permit handling, information management, etc., it is also the same as the "** Investment Regulations" implemented on July 1, 2019 The project unit shall prepare project proposals, feasibility study reports, and preliminary designs, in accordance with the ** investment management authority and the prescribed procedures. The general idea can be summarized as that the two ministries and commissions of housing and urban-rural development and development and reform shall perform the corresponding supervision and management duties in accordance with the law.

    3. Provisions on the quality assurance period of the project.

    Under normal use conditions, the minimum warranty period for construction projects is:

    A) infrastructure engineering, housing construction foundation engineering and main structure engineering, for the design documents specified in the reasonable service life of the project.

    2) Roof waterproofing works, toilets with waterproof requirements, rooms and external walls of leakage prevention, for 5 years.

    3) Heating and cooling system, for 2 heating periods and cooling periods.

    4) Installation and decoration of electrical pipelines, water supply and drainage pipelines, and equipment for 2 years.

    The warranty period of the construction project shall be calculated from the date of acceptance of the completion of the project.

    The quality of construction projects refers to the comprehensive requirements for the safety, applicability, economy, environmental protection, aesthetics and other characteristics of the project in the relevant laws, regulations, technical standards, design documents and contracts in the relevant sections of the country. The quality of construction work is equivalent to the quality of engineering projects. The quality of the project is single-piece, one-time and long-term.

  4. Anonymous users2024-02-05

    The construction content of the construction project includes: project name, construction location, investment scale, capital, investment amount of the year, project scale, commencement of construction, completion date, contracting method, and project preparation.

    Engineering construction project application refers to the construction of the project by the construction unit or its first organization in the feasibility study report of the project or other project documents are approved, must be submitted to the local construction administrative department or its authorized agency for construction, the approval documents for the project approval, including the credit certificate issued by the bank and the approval of the construction land and other relevant documents.

  5. Anonymous users2024-02-04

    The construction content of the construction project includes: project name, construction location, investment scale, capital, investment amount of the year, scale of the project, commencement of construction, completion date, contract awarding method, and project preparation.

    Engineering construction project application refers to the construction of the project by the construction unit or its first organization in the feasibility study report of the project or other project documents are approved, must be submitted to the local construction administrative department or its authorized agency for construction, the approval documents for the project approval, including the credit certificate issued by the bank and the approval of the construction land and other relevant documents.

    Procedures for applying for construction. 1) The construction unit shall receive the registration form of the construction project from the construction administrative department or its authorized agency.

    2) Fill in the registration form carefully according to the content and requirements of the registration form.

    3) Submit the registration form to the competent department of the construction unit for review and signature.

    4) Submit the registration form to the construction administrative department and submit the project approval documents and construction project planning permits, land use certificates, investment licenses and capital certificates.

    5) After the construction administrative department or its first institution reviews and signs the opinion, it shall return the project registration form of the construction unit and enter the construction review procedure.

    1. How to deal with construction disputes.

    1. Reconciliation. Reconciliation is a way for the parties to a civil dispute to negotiate, compromise and make concessions on the basis of voluntary mutual understanding and reach an agreement on the dispute that has occurred, and resolve the dispute on their own (without the participation of a third party in persuasion).

    2. Mediation. Mediation refers to the activities of a third party other than the parties to the dispute at the request of the parties to the dispute, based on laws, regulations and policies, or the provisions of the Bukai contract and social morality, to guide and persuade the parties to the dispute, so as to promote mutual understanding, consultation, voluntary agreement and dispute resolution.

    3. Arbitration. Arbitration is a way for the parties to voluntarily submit the dispute to a third party (arbitration institution) for adjudication based on an agreement reached before or after the dispute arises, and all parties to the dispute are obliged to enforce the award.

    4. Litigation. Civil litigation refers to the activities of the people's courts, with the participation of the parties and other litigation participants, to resolve civil disputes by means of trial, adjudication, enforcement, etc., as well as the sum of various litigation relationships arising therefrom. Litigation participants include plaintiffs, defendants, third parties, witnesses, evaluators, inquest personnel, etc.

    Legal basis: Building Law

    Article 38.

    When preparing the construction organization design, the construction enterprise shall formulate corresponding safety technical measures according to the characteristics of the construction project; For highly specialized engineering projects, special safety construction organization designs shall be prepared and safety technical measures shall be taken.

    Article 39.

    Construction enterprises shall take measures to maintain safety, prevent dangers, and prevent fires at the construction site; If conditions permit, the construction site shall be closed for management. If the construction site may cause damage to adjacent buildings, structures and special working environments, the construction enterprise shall take safety protection measures.

  6. Anonymous users2024-02-03

    The construction application must be carried out by Party A. After the construction administrative department or its first agency reviews and signs the opinions of the first and dispersal office, the project registration form of the construction unit shall be returned and the construction shall enter the review procedure.

    In 2016, the "Implementation Plan for Clearing and Standardizing the Examination and Approval of Investment Projects" was issued. In the implementation plan, the content of the clean-up specification includes, among the 65 items for construction approval, 34 items are retained, and 24 items are integrated into 8 items; It was changed to 2 items for inter-departmental solicitation of opinions, and 5 items related to mandatory safety assessment, which were not included in the administrative examination and approval items. After the clean-up and standardization, the number of items submitted for approval for construction was reduced to 42.

    The principle of cleaning up the norms: First, if there is no basis in laws and regulations and is not included in the catalogue of examination and approval items that have been decided to be retained, the examination and approval will be cancelled.

    Second, if there is a basis in laws and regulations, but there is no need to keep it, the examination and approval must be cancelled through the amendment of the law.

    Third, the examination and approval authorities can cancel the examination and approval of matters that can be resolved by soliciting the opinions of relevant departments or through follow-up supervision.

  7. Anonymous users2024-02-02

    What is a project application? What are the main contents of the construction application?

    Hello. Home expert Yingzi is happy to answer for you. The construction application content of the construction project mainly includes:

    1. Project name; 2. Construction site; 3. Investment scale; 4. Funding**; 5. The amount of investment in the current year; 6. Project scale; 7. Commencement and completion dates; 8. Contracting method; 9. Preparation for the construction of the project. Hello, I hope my answer can help you. If you have any questions, please ask me.

    Have a great day. If I can help you, you give a like, look forward to your like, dear, thank you.

  8. Anonymous users2024-02-01

    1) Procedures for applying for construction.

    Part I: Preparation for a real estate development company.

    Before submitting to the administrative authority for approval, the real estate development company should go through the land transfer procedures, entrust a qualified survey and design institute to conduct research and make a report on the project to be built, which should be accompanied by detailed planning and design parameters and renderings, and implement sufficient development funds.

    Part II: Administrative Examination and Approval.

    In accordance with China's current laws, regulations and rules, the administrative licensing and examination and approval of real estate construction projects shall be carried out.

    1. The planning department shall review the planning requirements of the preliminary design.

    2. The public security fire detachment shall review the fire protection design of the preliminary design.

    3. The traffic police detachment of the Public Security Bureau shall review the traffic conditions of the preliminary design.

    4. The Civil Air Defense Office shall review the preliminary design of the civil air defense design.

    5. The Bureau of Land and Resources conducts a pre-examination of land use.

    6. The municipal department, the environmental protection bureau, the health bureau, the ** bureau and other relevant departments shall review the relevant professional content of the preliminary design.

    7. The Construction Committee formulates and issues the preliminary design approval, and reviews the requirements for the implementation of the preliminary design approval documents.

    8. The construction committee shall conduct a policy review of the construction drawing design documents, and issue a technical review entrustment notice according to the opinions of the owner.

    9. According to the "Construction Drawing Design Document Review Report" issued by the construction drawing design review agency, the Construction Committee issued the "Construction Drawing Design Document Review and Approval Letter".

    1. The public security fire brigade conducts fire protection design review.

    2. The Civil Air Defense Office conducts a review of civil air defense facilities.

    3. The Construction Committee, municipal departments, garden bureaus, environmental protection bureaus, and health bureaus shall review the content and scope of relevant specialties according to the division of responsibilities.

    4. The planning department shall supplement the approval of the planning and design conditions of the changed part of the planning and design, and issue the "Construction Project Planning Permit" (copy) after the construction unit pays the relevant fees.

    1. The construction unit shall handle the construction application and registration.

    2. The construction party contracts the project and determines the construction team. The construction team is determined through bidding for bidding projects, and the contract is directly awarded for non-bidding projects.

    3. The Construction Committee organizes functional departments to review the conditions for the commencement of the project and issue the Construction Permit for Construction Projects.

    The real estate management department shall handle the pre-sale registration and issue the "Commercial Housing Pre-sale License".

    2) Submitted materials.

    1) Application; (2) Business license of the enterprise; (3) Land use certificate or land use right certificate; (4) Planning permit for construction land; (5) Construction project planning permit; (6) construction permits; (7) Housing completion acceptance data; (8) Housing surveying and mapping results; (9) Other documents that shall be submitted in accordance with relevant regulations.

Related questions
11 answers2024-04-22

Water conservancy and hydropower are engineering majors.

1) All citizens of the People's Republic of China, law-abiding and law-abiding who meet one of the following conditions can apply to participate in the first-class construction engineer qualification examination. >>>More

5 answers2024-04-22

The quality standards of construction projects include: meeting the quality objectives and quality requirements of the project; Comply with the agreed requirements of the signed contract and supplementary agreement; Meet the requirements of design and construction drawings and technical documents; Comply with various norms and standards and quality management rules and regulations of the department; Pass acceptance. >>>More

4 answers2024-04-22

Construction engineering, covering all civil engineering engineering content, including specific: architecture, structure, electrical equipment layout, heating and ventilation design, construction organization, cost, quality and schedule management, budget accounting, etc. Civil engineering is a discipline that uses basic scientific knowledge such as mathematics, physics, chemistry, and computer information science, technical scientific knowledge such as mechanics and materials, and corresponding engineering and technical knowledge to research, design and construct engineering facilities such as industrial and civil buildings, tunnels and underground buildings, highways and urban roads, and bridges. >>>More

5 answers2024-04-22

The construction cost is composed of the following parts:

1. Direct engineering costs, that is, various expenses that constitute the engineering entity, including labor costs, material costs, construction machinery use costs, etc. >>>More

6 answers2024-04-22

Traditional engineering insurance includes construction engineering insurance and installation engineering insurance, but with the development of various scientific and technological projects, scientific and technological engineering insurance has also become an important part of engineering insurance. >>>More