-
According to Sinopec News Network News on May 24 this year, Yanshan Petrochemical officially issued a notice to fully launch the pilot project of energy management system. The project is expected to be completed by the end of this year. At that time, the system will cover the whole process of Yanshan Petrochemical Energy, production, transportation, conversion, consumption and optimization on the basis of integrating the original energy modules, and comprehensively improve the company's energy management level.
-
Yanshan Petrochemical has built an energy management and optimization system, based on the construction of the system, innovated the energy management model, established an enterprise energy management and control center, strengthened the centralized management of the tracking, accounting and analysis of the whole process of energy production, transmission, transfer and consumption, and realized the visualization and optimization of the process. From February 2014 to the end of August 2015, more than 1,000 yuan of practical efficiency was optimized. Zhenhai Refining & Chemical Co., Ltd. has established an intelligent monitoring system for the steam pipeline network, which carries out real-time monitoring and dynamic optimization of boilers, steam pipeline networks, gas pipeline networks, etc., to achieve energy saving, emission reduction, cost reduction and efficiency increase, with an annual increase of 7.5 million yuan.
Maoming Petrochemical has built a plant-wide energy balance optimization model covering the whole process of energy, production, transportation, conversion and consumption, and has successfully optimized the fuel, equipment load and power production of the power system of 8 boilers and 6 steam turbines of the three thermal power stations of the thermoelectric division, and optimized the calculation of the optimal operating parameters under the current working conditions based on real-time production data, and the system has been put into trial operation.
-
I feel the same way! Although the appearance is glamorous, and the construction is carried out in a large way, but there is still a lack of cultural energy in the bones. . .
-
It feels okay, at least it's clean
-
It's really rubbish, it's garbage from top to bottom, and the factory leaders cover the sky with one hand, and they can do whatever they want.
-
The preparation of energy management system, the establishment of energy management institutions, production energy-saving training, strengthen energy-saving publicity, the most important thing is to audit and record the energy consumption of enterprises, analyze the energy-saving points of enterprises, prepare energy-saving planning, energy-saving transformation, and save production costs for enterprises, you can refer to the "GB-T15587-1995 Industrial Enterprise Energy Management Guidelines".
-
It's basically the same as any other system. It is necessary to identify energy factors, identify priority control energy factors, identify laws and regulations, set goals and indicators, and formulate management plans and emergency plans for optimal control factors. The preparation of energy system management manuals, procedural documents and work instructions can be integrated with other systems, fully integrated into other management systems, or directly add energy management requirements to other system documents.
Then there is the operation control, the detection of energy performance, the internal audit of the system, the management review, etc. Before certification, the system must be run for 3-6 months, a complete internal audit and management review must be carried out, and a closed loop must be obtained.
The information that needs to be submitted to the certification company includes: energy management system manual, procedural documents, legal operation certificate of the enterprise, the type of energy medium and energy-consuming working fluid of the enterprise, the annual consumption, the scale of the enterprise, the process energy consumption of each process, and the comprehensive energy consumption.
Under normal circumstances, various energy consumption indicators need to meet the secondary standards of cleaner production, otherwise they cannot pass the energy system certification here. The screen name is my phone number. Please contact me if necessary.
-
Our company is going to hold a seminar on energy management recently, so if you are interested, you can come and attend. Gratuitous.
-
Energy management, through the scientific monitoring and collection of water, electricity, gas, air conditioning, etc., and through the data analysis of the collection, we can know where there is room to save energy, and prescribe the right medicine. After the implementation of the conservation policy, the amount of consumption before the implementation is compared, so as to achieve the purpose of energy management and cost saving.
-
It is recommended to use dedecms, and the site of Dongyi is not good.
-
The content management system is very good! I know if I use it, I have used it, and the operation is very clear.
-
The quality management system you mentioned, I don't know if your company has this structure, a complete quality management system needs a perfect configuration of the structure. First of all, clarify the responsibilities of the department, authority, configuration, implementation content, record, and tracking. Specifically, it needs to be established according to the actual situation of your company.
-
It is recommended to do a quality management system, 9000 management, if you can't achieve certification at present, you go to the next 9000 management program online, covering various departments, it is best to have the kind of division of responsibilities. According to the responsibilities of the quality (quality inspection) department, the corresponding division of labor is established, and there are generally responsibilities such as incoming materials, manufacturing process, shipment, product testing, measurement, and certification.
-
1。First of all, the company's leaders are mainly the bosses who are very supportive of quality work, and when there are difficulties in quality work, quality is the priority;
2。The second is to plan the quality management system for the company's products. Including: the establishment of standardization, quality management institutionalization, and the refinement of quality management;
3。Further detailed management of product quality: including: control of incoming materials, manufacturing processes, finished products and nonconforming products;
4。The control aspects of the company's quality cost: including: cost roots, control means, measures;
5。The establishment of the company's all-round quality system: planning, implementation, preparation of documents, summary, formulation of assessment objectives, assessment, review, continuous improvement, external audit, certification, etc.;
6。For the management of the internal affairs of the quality management department: hold weekly quality meetings, regular company management meetings, formulate requirements for record management, inspect the quality certificates, seals and business personnel management of the enterprise, and arrange special personnel for the management of documents related to the company.
7。It is also necessary to maintain a good cooperative relationship with relevant business departments to match the quality management work.
-
From the point of view (which can be gradually improved), your company's quality control is relatively not very recognized by the superiors, and they know that there is a certain difficulty in perfecting.
There are a few forms you can start with. The form of the application from raw materials to finished products should be "gradually" improved, and the form should be circulated, and the replies of the relevant departments should be summarized and reviewed by the above. And regularly report and track improvements.
If it is more difficult to deal with, it should be reported to the special follow-up team, and strive for the strength of the superior.
If it is a patrol ring, (it can be gradually improved)!
I hope it helps you and I wish you all the best in your work.
-
No management system can be built at the outset, so the first thing is to establish it, and then to improve it gradually.
It's a bit cumbersome to say, so it's recommended to read the relevant documentation.