-
First, first enter the venue to prepare:
1. Project commencement report, construction permit, construction organization design, materials and equipment for review.
2. Concrete mix ratio design and material inspection.
3. On-site acceptance. Temporary facilities (schemes), safe and civilized construction preparations.
4. Engineering survey and positioning records.
Should be all prepared:
Basic information table of construction projects.
Construction approval materials (project approval documents requested from the construction unit).
Construction project planning permit (planning permit requested from the construction unit), notice of winning the bid for the construction project (notice of winning the bid from the construction unit), construction contract (construction contract requested from the construction unit).
Supervision contract (supervision contract requested from the supervision unit).
A copy of the qualification and personnel certificate of the construction unit.
Copies of project supervision institutions and relevant certificates.
A copy of the qualification and personnel certificate of the design unit.
A copy of the qualification and personnel certificate of the survey unit.
Copies of project construction institutions and related certificates (including qualification certificates, personnel employment certificates (project manager, technical leader, constructor, budget officer, quality inspector, safety officer, material officer, surveyor, sampler, data clerk, drainage, heating, electrical engineer).
Drawing triage records and design change documents.
Design documents and design changes before the start of construction.
Construction site quality management inspection records and schedules.
1. A package of quality responsibility system.
2. The main professional types of work operation certificates (tower cranes, scaffolding workers, gantry frames, electric welders, butt welders, straight ribbing, electroslag welders) (ask for each team).
3. The qualification contract of the subcontractor.
4. Construction drawing review (construction drawing review certificate).
5. Geological survey documents.
6. Construction organization design, construction plan and approval.
There are others.,I'm not all out here.,If you need it, you can hit it in the (library) (construction materials first enter the site to prepare) to **a.,All of the above need to be done to enter the site Of course, that is also sent by me = =!
-
Please send us the email and send you the detailed information.
-
The detailed process of the work of the building data clerk:
1. Pre-construction information.
2. Quality acceptance data.
3. Test data.
4. Materials, products, components and other certification materials.
5. Construction process data.
6. Information that should be supplemented if necessary.
7. Completion information.
8. Archive data for construction project quality supervision.
Note: The whole set of data storage quality supervision station for curtain wall, steel structure and grid.
The work of the construction engineering archivist is a complex professional work integrating engineering construction management and archives management knowledge, and must have certain professional knowledge of construction, archives and the ability to operate computer construction application software.
-
There is an engineering data clerk workflow. pdf
How to be a good data clerk. pdf
The data clerk fills in the data specification tutorial. rar
Civil Engineering Data Clerk Tutorial. doc
JGJT 185-2009 Construction Engineering Data Management Regulations. pdfhi I explain or adopt the post best to pass it to you.
-
I don't have this information, your list is very detailed, if you are engaged in this industry, it is recommended to buy a set of data software, which basically has these information.
-
The things that the data clerk does in each area are not very different.,Last year there was a new version of the general book.,It is recommended that you buy a new general evaluation of the site is to be new.,The answer above is very detailed.,Generally don't use all of them.。。。
Commencement data, foundation division, main body division, roofing division, decoration division, energy-saving division, completion information, (household acceptance). >>>More
Chow Yun-fat is a Chinese film and television actor, photographer, and national first-class actor. >>>More
The work of a data clerk is definitely not very easy to do at the beginning, because I don't know how to start, I only started to contact this area last year, I will tell you some of my experience, I hope to give you some help. >>>More
Summary. Dear, the application for the conversion of the chemical enterprise information clerk can be written like this: Dear xx I became a probationary employee of the company on 20/x/x, and the 3-month probationary period has expired today, according to the company's rules and regulations, I now apply to become a regular employee of the company. >>>More
1. Responsible for independently completing the collection and compilation of engineering data; >>>More