Do you know the decoration process of Jialin? What does it look like?

Updated on home 2024-04-04
15 answers
  1. Anonymous users2024-02-07

    Jialin decoration provides good design drawings, contacts the manufacturer to directly send the required materials for decoration, and each link is checked by the company.

  2. Anonymous users2024-02-06

    Lanting Home Renovation Process.

    1. Enter, dismantle the wall, and build the wall. After the hydropower positioning, the next step is to groove. The groove made by a good groove master is basically a straight line, and there are basically no hairy teeth on the edge of the groove.

    Note that before slotting, be sure to ask the plumber to mark all the hydropower directions on the wall, and remember to check the hydropower diagram to see if it is consistent.

    2. When renovating the waterway, pay attention to the surroundings must be tidy. When concluding a contract for waterway renovation, it is advisable to indicate the materials used in the waterway renovation. In addition, in the renovation of the waterway, it is necessary to pay attention to the size of the sewer pipe in the original room, and the pipe connected to the external sewer pipe should be matched with the original sewer pipe.

    3. In the circuit transformation, it should be noted that the lamps and electrical appliances of the whole house should be installed in advance in order to determine the location of the switch and socket, and at the same time, it should be noted that the new buried wire and the replacement line are different. It is better to buy a wireless doorbell for a doorbell.

    The main description of the above is how to decorate the house? What is the specific introduction of the process of decorating the house, the house decoration is actually in the process of processing, there are many key points, and the confirmation style is only one of them, and there are a lot of style choices, so it must be careful when choosing, and the final decoration effect of each style is different, if you choose the wrong style, you will also make your mood very low.

  3. Anonymous users2024-02-05

    Content from the user: Orange of Water Conservancy.

    The first customer negotiation - after the intention to measure the room (I generally want to charge a deposit of 1000 yuan, which varies from person to person) - do preliminary CAD design and budget (do not produce renderings, if you want to do renderings, you must collect a deposit of 1000 yuan, and the renderings are done by professionals) - sign the contract and issue detailed construction drawings (different from person to person, sometimes I know that he will come to see the plan to sign the contract, and the construction drawings will be done in advance) - enter the site to assist the foreman to go through the procedures and hand over the site - go to see the construction site in the middle of the construction, The big model is like this, it's not a constant layer, it's up to you to do it yourself.

    Decoration process 1: home decoration consulting: 1) Negotiate with the user to ask the decoration company to decorate, and tell the company their requirements.

    2) After the design and decoration company receives the user's floor plan, the designer will personally go to the site to measure and observe the site environment, study whether the user's requirements are feasible, and obtain on-site design inspiration. Preliminary selection of some material samples to introduce to the user, if the user agrees, the designer will further provide detailed engineering drawings and item-by-item ** list, at this time the user should provide the decoration company to be used furniture, equipment information, in order to cooperate with the design. 2:

    On-site measurement: The designer conducts on-site survey to the customer's room to be renovated, and conducts a comprehensive investigation, so as to carry out home decoration design more scientifically and reasonably. 3:

    Sign the contract: Under the premise that both parties confirm the design plan and budget, sign the "Beijing Family Room Decoration Project Construction Contract" supervised and printed by the Beijing Municipal Administration for Industry and Commerce, and clarify the rights and obligations of both parties. Second, the basic layout of the lamps:

    Light produces color HVAC designers.

  4. Anonymous users2024-02-04

    The general process of Chengdu's decoration company is to measure the house" design and construction The process of the high-end company is basically to pay the design fee first, and then measure the house" construction (payment of the project) The project payment is paid in three installments, 65% in the early stage, 30% in the middle and 5% in the final period, which is formulated by the China Decoration Association. There are also 60% in the early stage, 35% in the middle period, and 5% in the last stage, and the difference is not big. My friend's house was installed in Chengdu Sboland, and this company is doing mid-to-high-end ones, and I saw that their finished house was quite beautiful.

  5. Anonymous users2024-02-03

    I know a little bit about it! I think first you have to decide whether it's clear, half, or all. If you don't have the energy and time to use the whole package, if you have some energy and want to control the money, use the half package, and if you are energetic, the most economical use the clear bag!

    In order to ensure the quality of construction and the later quality assurance, it is recommended to use half a package, that is, the legendary main material A purchase + base B supply. Let's talk about it in detail! ~ 1:

    Once the contract is signed, Party A shall pay 50% of the project materials and construction costs; When the progress of the construction period is more than half (year, month, day), Party A will pay 40% of the construction cost for the second time. The remaining 10% of the final payment will be settled after Party A's acceptance of the completion of the project. 2:

    Collect the deposit first (each company is different), collect 60% of the project after signing the contract, collect 35% after half of the project, and collect 5% after passing the acceptance 3: Only 50 yuan is charged before signing the contract, and the owner will receive 30% of the decoration money and 1,000 yuan in advance for water and electricity on the day of signing the contract, and the hydropower renovation is completed and the water and electricity costs are calculated; The carpentry foundation is completed, the waterproof is completed, and 30% is delivered after the successful closed water test; After shoveling the wall skin, scraping putty two to three times and polishing, pay 30%; After applying latex paint, pay 5%; After installing the lamps, sanitary ware and hardware pendants, the inspection is qualified, and the balance is paid 5%. Finally, a friendly reminder!

    As long as you sign the contract, you have to pay most of the decoration materials to the other party, how much is involved in the contract, and you should pay attention to the scope of the materials you agreed to provide. That's about it, just for reference! Hope it helps!

  6. Anonymous users2024-02-02

    You have to think about how to decorate, what pattern, so let's say, water and electricity must be done first, because these are to be done in the wall or underground, in short, in the dark, that is, water and electricity are sitting under all other decorations, so you must do it first, but water and electricity is in line with your decoration style, where do you want to install lights, what lights, where to put washing machines, microwave ovens, these must be arranged in advance, and then you can determine the location of sockets and faucets and drainage, Also calculate the length of wires and water pipes, and more!

    So 1, to the existing decoration design drawings of the whole house, this should be completed together with the design 2, water and electricity in advance (network broadband, satellite TV), bathroom waterproofing, 3, purchase decoration materials.

    4. Carpentry. 5. Walls, suspended ceilings.

    6. Floor (floor or floor tiles).

    7. Lighting, doors, door locks, kitchen cabinet installation, sink and sewer pipe installation, gas stove installation, range hood installation.

    8. Buy furniture, electrical appliances,

  7. Anonymous users2024-02-01

    It's best if you do it yourself, but it takes skill. First of all, lay out the water pipes, wires, and switches, and then you can carry out various tasks according to your own ideas. Simple and cumbersome, hehe. It is recommended to refer to the decoration drawings more, which will be of great help.

  8. Anonymous users2024-01-31

    There are several kinds of decoration, large bags and clear bags. If you have the energy, you choose to clear the bag, that is, buy the materials yourself, and let the family work for you and pay the wages. The big bag, that is, you don't have to care about anything, and you can just collect the house when the time comes.

  9. Anonymous users2024-01-30

    The picture below you is reversed, right? It is suggested that the rooms should be interchanged. Steps:

    1. Find a few decoration companies and ask them to make a copy (compare the unit price of similar projects), 2. Examine the construction projects of several decoration companies, mainly to see whether the basic materials used are environmentally friendly, to see whether the construction site is clean and tidy, 3. Whether the contract is formal (issued by the local management department), 4. The company has a small reputation in the local area. The importance of this is 4321, and finally, merit-based admission.

  10. Anonymous users2024-01-29

    What are the basic steps and processes for decorating a house? 1.schematic design; 2.main body demolition and alteration; 3.Hydropower renovation + waterproofing; 4.carpentry processes; 5.masonry process; 6.Paint process + wallpaper paving; 7.installation of customized products, etc.

  11. Anonymous users2024-01-28

    There is a very big difference, to Yichang decoration, it is very good.

  12. Anonymous users2024-01-27

    There are generally three stages in the rough house decoration process.

    In the first stage of design, it is necessary to communicate with the decoration designer to understand the decoration style that the owner likes. And to incorporate the popular fashion trends into it, after deciding on the design plan, it is necessary to start selecting the decoration company.

    The second stage is the construction phase, where the renovation company carries out the demolition and renovation work, including the renovation of water and electricity and the inspection of concealed works. For example, it is necessary to test whether the floor heating is unobstructed and whether the waterproof project is in place. After the water discharge is done during the construction process, a 24-hour closed water test is required.

    Once all the water and electricity are ready, it is necessary to paste the floor tiles and tiles.

    The third stage is the carpentry work.

    After the carpenter enters the site, it is mainly for the construction of ceilings, ceilings and gypsum corners. This includes the installation of windows and doors and the framing of the framing, which are indispensable processes and are key to the carpentry phase. After the carpentry work, the walls are treated and painted.

    The decoration process of the rough house mainly includes the above three stages. After all the stages are completed, on-site disposal is required, and after the waste is disposed of, the owner can purchase the lamps, switches, sockets, etc. At the same time, it is not possible to ignore the acceptance after the completion of the whole project, and then pay the balance after passing the acceptance, so as to avoid unnecessary disputes caused by the payment of decoration money without acceptance.

  13. Anonymous users2024-01-26

    1. Before the decoration, you need to go through a series of procedures first, go to the property center to handle the construction permit and other certificates, fill in the relevant content according to **, and need to pay a certain deposit, you can decorate. However, it is also necessary to confirm the design drawings and detailed plans with the decoration company to ensure the idealization of the decoration effect.

    2. The wall demolition and modification is to roughly transform the construction area and erect the main frame, which involves the rectification of the original house wall, but the wall with a thickness greater than 240 mm should not be demolished and modified, and this kind of wall is often the bearing house stress structure. It is easy to destroy the stability of the house by dismantling and altering at will, and it is also necessary to rectify the heating and replace the plastic steel windows.

    3. When the wall is dismantled and modified, it is the laying of water and electricity, because it is buried in the wall and ground or ceiling, so special attention needs to be paid to the construction, and high-quality hydropower materials should be selected, so that the use time is long, and daily maintenance work can also be avoided. When laying out, it is necessary to determine the direction and position, because after the construction is completed, it is easy to rework unnecessary trouble and loss.

    4. There is no big definition of who comes first and who comes after in the mud stage, but it is generally muddy first, because this stage is dirty, and the construction first can effectively avoid soiling the later construction project. Muddy water attention involves tile paving, less than a week of construction, more than a month, need to see the size of the house area. The carpentry stage is mainly the production of suspended ceilings and wood products, and the time required depends on the area of the house, and large core boards and gypsum boards are mostly used for decoration.

    5. There are many aspects involved in the painting stage, and it is necessary to first carry out the base treatment of the wall, that is, to shovel the wall skin, and then to carry out the putty painting work, and finally to carry out the painting construction on both sides. After it is completely dry, it is necessary to polish the sandpaper, which takes a long time.

    6. Finally, the installation project is carried out, and at this step it is basically the installation of building materials, such as flooring, wooden doors, customized cabinets, etc. At this stage, it should be noted that some installation projects are responsible for the business, and it is necessary to make an appointment in advance to avoid the collision of the installation time of various building materials.

  14. Anonymous users2024-01-25

    1. Refer to design texts on the Internet or read architecture-related books to choose your favorite decoration style. It is recommended not to be affected by the structure of the house, the size of the room and the affordability, and to determine the style you like first, which is the most important thing.

    2. Point-to-surface expansion. After determining the complete decoration style you like, you can derive this concept to furniture accessories, the harmony of lighting colors, etc., from point to surface to expand little by little, from part to whole, unified style, and the whole home has become your favorite type.

    3. Choose the right decoration materials. Before the complete decoration, it is necessary to understand more about the building materials market, compare the best and the quality. Choose materials that are within your financial capacity and that fit your home squares. Reflect the style of your home.

    4. The owner mainly completes the complete decoration that meets his own wishes, and it is recommended to find a professional designer. Tell the designer his own decoration needs, and he will design accordingly according to the user's own work occupation, hobbies, personality life, etc. Through the communication with the designer, the inner aesthetic is shown in the complete decoration of the house.

    In the process of decoration, the designer will measure the decoration style according to the expression of the householder and the size of the unit area.

    5. Design the decoration style according to the layout and structure of the room. It is best to reduce the use of building materials in the decoration during the complete decoration to reduce the harmful chemical gases such as formaldehyde, and advocate functional design, so that users can fully enjoy the warmth and simplicity of the family. Design the corresponding decoration style according to the size of your house space, so as to appear generous and simple.

    Not limited to space.

  15. Anonymous users2024-01-24

    Let's put it this way, choose a decoration company, a look, two touch, three visits, four more communication, the important thing is the designer's cultivation and attitude to choose the designer at the same time to see the company's pre-sales and after-sales attitude change, of course, ** will not be an exception.

    I am the owner of Jing'an. After more than a month of comparing decoration companies, I finally chose Jialin Decoration, and I am very satisfied at present. Here, I would like to thank the staff of your company, they are very conscientious and responsible, and their attitude is also good, and they are very attentive to the decoration of my home as if it were my own home.

    At the same time, I would also like to thank the company's customer service Xiao Li. Here, I sincerely hope that your company will continue to work hard and do better!

Related questions
22 answers2024-04-04

The size is simply measured, and then the height of the cabinet is calculated according to the figure of the family, the height of the general cabinet is 800 high, and the cabinets are 350 400 wide, and then the water is changed (to prevent the first change of electricity will occur), change the gas pipeline of coal, and then change the power supply of the wall (the general location of the building is not very suitable, according to their own use in the change), then the wall tiles, floor tiles, and then the wall tiles are blocked, and then the carpenter began to enter the site to work, first hit the floor cabinet and then hit the wall cabinet, and then on the sink, on the gas stove, microwave oven, refrigerator or something, it is good to say that the big one comes first and then the small, the overall kitchen ** is relatively high, it is not recommended that you choose, but you can design and improve yourself according to their style, and the effect is really not necessarily worse than theirs.

9 answers2024-04-04

Pot wrapped meat is a big dish of the New Year that the north attaches great importance to, the raw materials are simple, and it is not very difficult to make, but there are more steps, of course, if you want to eat a "big meal", you should not be afraid of hard work. Wash the pork tenderloin and cut it into thin slices lengthwise, peel the carrots and shred them for later use. Mix the starch with the water, being careful not to pour it in at once, and slowly mix it into juice. >>>More

11 answers2024-04-04

I guess you're talking about the root of the folded ear, which is the root of the plant Houttuynia cordata thunb. >>>More

13 answers2024-04-04

I know this door master, who has his ** and address?