Stick the floor tiles or wall tiles first, who knows better?

Updated on home 2024-04-23
23 answers
  1. Anonymous users2024-02-08

    The general practice of the decoration company or the construction party is to lay the wall tiles first, then pave the floor tiles, and pave the floor tiles after the wall tiles are paved, which will not affect the wall tiles and do not delay the construction period, so the general construction party will adopt this approach. If the floor tiles are paved first, and then the wall tiles are paved, you must wait for the tiles to dry and solidify and then pave the wall tiles, if the floor tiles are not completely dry, you will directly pave the wall tiles, step on the floor tiles, which will artificially cause the hollowing, loosening and height inequality of the tiles!

  2. Anonymous users2024-02-07

    When decorating, it should be the first to paste the first tile can be such a problem, maybe for many people, they do not consider it in their daily life. However, if it comes to the situation that your home needs to be renovated, you may not know for a while whether you should choose the bricks on the wall or the bricks on the ground. But in daily life, in fact, there is no certain rule for such a mutual order, in fact, it is okay.

    Start from the bottom and stick it upAnd many people will choose to paste wall tiles first, because when they choose to paste wall tiles, they can start from the bottom layer first. And if you stick the bricks on the floor after pasting, the difficulty of the whole construction is relatively small. And for the quality of this tile, its hollow drum rate will be smaller, so in this case, everyone will also choose the brick on the wall first.

    In addition, some tiles that stick to the floor may also have some disadvantages, that is, its waterproof effect is likely to be a little worse.

    The waterproof effect is at its best, if there are more gaps left or there are some inappropriate situations in the process of filling, it may be easy for the tiles on the floor to form some leaks with some temperature changes. It may also lead to some defects in the whole decoration process, in addition, many people have better space to play when they paste floor tiles, and this method also has many advantages, which can make the waterproof effect reach the best state.

  3. Anonymous users2024-02-06

    Nowadays, many people decorate with wall tiles first, and doing so will shorten their time, and then it is more convenient to take care of.

  4. Anonymous users2024-02-05

    Of course, these floor tiles, because if you put wall tiles first, the gaps left may not be enough to stick to the floor tiles, and there is a high probability that there will be large gaps, which will cause additional problems in the future.

  5. Anonymous users2024-02-04

    When decorating, it must be better to stick the floor tiles first, because it may be more convenient to lay the wall tiles after laying the floor tiles, and if the wall tiles are laid first, it may cause the ground to be uneven.

  6. Anonymous users2024-02-03

    It is better to paste the wall tiles first, because it is very convenient to paste the wall tiles and then paste the floor tiles, if you paste the floor tiles and then paste the wall tiles, it is very difficult to take care of, and there is a lot of garbage, which will damage the floor tiles.

  7. Anonymous users2024-02-02

    Paste the wall tiles first, because if you stick the floor tiles first, and then paste the wall tiles, the cement used to stick the floor tiles may not be completely solidified, which will break the floor tiles and stain the floor tiles.

  8. Anonymous users2024-02-01

    I think it's better to stick the wall tiles first. Because if the floor tiles are pasted first and then the wall tiles, it will cause some damage to the floor tiles, and it will also make the floor tiles very dirty.

  9. Anonymous users2024-01-31

    In fact, there is not much difference between the two, but generally everyone paves the floor tiles first, which is easier to operate and more convenient.

  10. Anonymous users2024-01-30

    Wall tiles should be applied first. Because we put the floor tiles first, it will be easy for us to stain and damage the floor when laying wall tiles.

  11. Anonymous users2024-01-29

    Stick the wall tiles first. Because it is more convenient in this way, and it is likely that some materials or concrete will fall when tiling, it is also easier to deal with.

  12. Anonymous users2024-01-28

    Stick the floor tiles first, so that you can have a good judgment on the distance of the ground, if you stick the wall tiles first, the scale may not be very accurate when you stick the floor tiles on the ground.

  13. Anonymous users2024-01-27

    The wall tiles should be pasted first, and after the wall tiles are pasted, some sundries on the floor can be cleaned up, and then the floor tiles should be pasted, which is more convenient.

  14. Anonymous users2024-01-26

    In the past few years, the general worker master is the first to lay the floor tiles, but first paved the floor tiles, at least after the floor tiles are paved, at least for a period of time you are idle, the bricks can not be stepped on, you can not ask the workers to pave the wall tiles, if it is not dry and solid, the floor tiles are uneven. And if you stick the floor tiles first, there will be cement and sand falling on the floor tiles when the wall tiles are pasted, and the hardness of the sand is large, and the surface of the floor tiles will be scratched during construction; In addition, it is not easy to do hygiene; After the floor tiles are applied, the floor drain is opened. The cement slurry flow is easy to enter the floor drain.

    Cement is soaked in water can also solidify, plugging the pipeline is troublesome, now it is generally the first to pave the wall bricks (kitchen and bathroom), from the middle of the paving, the lower part of the reserve of a brick height, but when paving, the brick should be placed on top of the top, to prevent the brick above from sliding down, and wait until the brick is completely sticky, you can remove it.

    Some people are afraid that the wall tiles will be paved first, and the gap between the wall and the floor tiles will be errored, which will not be right, which will affect the appearance. The gap between the wall and floor tiles is on the top, this problem is not big, the workers will do pre-paving before paving, if you can also find it after paving, leave a few on the edge, which does not affect the appearance. The general ones are in the corner, and they are not obvious.

    1. Measure a horizontal line at any elevation around the wall before you can start to paste the wall tiles, but you have to control the order of the bricks to avoid the number of times you cut the bricks. It can improve the efficacy without hindering the aesthetics.

    2. After pasting the wall tiles, Jinsheng floor tiles are paved, the drainage slope is controlled, the sanitary napkin is not backflowed (flowing in the direction of the door) and the waterproof protection is paid attention to, and the water is turned off after the paste is carried out to ensure that there is no leakage.

    3. Cleaning, steel wool balls can be used for wall cleaning.

  15. Anonymous users2024-01-25

    All belong to the masonry process, depending on the master and the process. Personally, it is recommended to paste the wall tiles first, otherwise paste the floor tiles first, and get a protective film, for fear that the wall tiles will leak to the floor tiles when they are pasted. It's troublesome.

  16. Anonymous users2024-01-24

    Generally, the wall tiles are pasted first, but if the wall tiles and floor tiles are to be jointed, the floor tiles must be pasted first before the joints can be matched.

  17. Anonymous users2024-01-23

    When using ceramic tiles for decoration, it is also necessary to consider the order of Linglazhi, so the floor tiles are pasted first or the wall tiles are pasted first? It is also necessary to keep abreast of it.

    In fact, the key to sticking on the wall tiles or floor tiles is to pay attention to two issues, which help create the protection of all construction projects, install reasonably, and help you with the progress of construction; If the problem is positive, neither building wall tiles nor building floor tiles are a problem!

    Instead of solid placement of workers dry brick on the first floor of the tile, when you are idle, at least the bureau is rented, then you can not step in the brick floor tiles, there is no flat floor. When pasted on the wall for the first time published tiles, and then poured on the cement and sand floor tiles, the floor tiles are pasted first or the wall tiles are pasted first with large sand hardness will scratch the surface of the red brick building, and the other is not easy to be healthy; Tiled, slurry flow can easily leak into the ground. When immersed in water, the cement becomes solid.

    Stopping the pipeline is a hassle.

    Now it is common to use wall tiles, now starting from the middle part of the height of the bricks. When stacking packing materials, place bricks on top to prevent them from falling. You can remove the bricks completely.

    is a special case: the gap between wall tiles and floor tiles that affects the aesthetics of one. Then, you can eliminate it to find it after paving without affecting the floor tiles on the walls, and if you have several edges, do the physical store in advance of the appearance of cracks is not a problem before the workers of the stone.

    Usually they are all in the corner.

    Tile. When the physical properties of the tile are relatively stable materials, when the temperature and humidity are not enough tension for the size of a brick, it is necessary to soak the highly absorbent glazed tile in water first.

    If wet or packed tiles, so that you can put viscosity tiles. Before the hollowing phenomenon will fall, there is not enough water and unsaturated bricks and humidity wet, often in the cement mortar, the lead bricks crack too much moisture to absorb the packaging may have.

    In half cases, the tile must be immersed in water for at least 2 hours before being placed to completely absorb the tile.

    The base processing should be standardized. The basic treatment of the wall is very important. Failure to comply may affect the bonding effect.

    Make sure to remove all types of debris before packaging. Otherwise, the moisture in the slurry will turn into dust. The sediment will be absorbed and will not adhere well.

    The day before crushing, the base layer is preferably immersed in water, and 700% fully moistened wall humidity, so that the mortar is not condensate, and the knot plate can be read, in addition, the formation of a new wall in the base layer I am worried that there is a hollow drum on the floor.

    The question of whether the floor tiles are pasted first or the wall tiles are pasted first need to be understood, so that the construction can be smoother.

    You can get it for free

  18. Anonymous users2024-01-22

    If the floor tiles are laid first, you must not paste the wall tiles until the floor tiles are completely dry, which will delay the construction period and endanger the construction progress. If the floor tiles are not completely dry, stepping on them to pave the wall tiles will easily lead to hollowing, loosening, and unevenness of the floor tiles. If the floor tiles are pasted first, even if they have been completely dried, it is inevitable that there will be a lot of dirt falling into the new tiles of the wall tiles, which is very easy to scratch the paved floor tiles, and if there are hanging objects falling down, there will be smashing the floor tiles.

    In the bathroom, whether the paving process of floor tiles is wall pressing the floor, or the floor pressing the wall, the walls around the wall must be paved first. If the owner of the community stipulates that the wall is pressed to the ground, then the bottom piece of the bathroom wall will be buried in the bottom of the wall and not pasted, and the wall tiles will be pasted after the tiles are pasted in the middle and later stages. The general practice is to summarize the effective behavior of the construction, when there is no special requirement, the proposal is to first wall and then the ground, here it should be noted that the bottom layer of the wall is a row of bricks is pasted later, from the perspective of effectiveness, of course, the wall tiles are more suitable to press the floor tiles, and the bottom row of bricks is actually a bricklayer master convenient engineering construction and eat deviation from the perspective of considering the more effective construction method. The order of the wall and the ground is actually necessary to analyze the construction requirements and finally determine the construction sequence, which is not certain, naturally from the perspective of the indoor floor joint, or the proposed wall pressing, this point is the edge of the details, and the process flow is not very harmful. In that way, it is a construction method to determine the waterproofing characteristics of the restroom.

    The advantage of this is that when the wall is showered and sprinkled, or when the canopy layer pipe bursts or there is a lot of leakage, the water level takes the opportunity to drain the floor drain.

    The water on the ground will not leak back to the floor tile joint layer and the floor slab layer, resulting in flooding, and the residents of the lower floor of the building will immediately ensure the waterproof service life of the floor tile layer and the ground. Find the one-meter line first, and use the level to pop up the straight line. Most of the operation process is to gradually cut the bricks to the two sides at the opposite corner of the channel.

    To put the most complete process now the most eye-catching part, leave the non-standard bottom half brick in the corner of the door. Also, the bottom circle of bricks of the wall tiles is not paved temporarily. Lay the floor tiles underneath, lay the floor tiles, clean and tidy, and remove the cement mortar.

    Finally, the wall tiles pulled down in a circle are laid, grouted with grout, and scrubbed with a damp towel to clean up.

  19. Anonymous users2024-01-21

    It should be attached to the wall first, and then to the ground. It is easier to level the floor and walls, scrub them with water, and then apply tiles.

  20. Anonymous users2024-01-20

    Under normal circumstances, when tiling, you will choose to lay floor tiles first, and then pave wall tiles, which will produce a better effect, and the color matching is also very important.

  21. Anonymous users2024-01-19

    In the process of renovation, I think it should be applied to the wall first, and then to the floor. This way, there will be no gaps, and it will look more beautiful.

  22. Anonymous users2024-01-18

    To determine according to the actual decoration situation, different design tiles and the laying of the ground is not the same, you need to pay attention to the style, choose the right tile adhesive for pasting.

  23. Anonymous users2024-01-17

    First, the wall tiles should be attached to the floor or the wall first

    1. It is okay to do any work first, which must be determined by the residents according to the specific situation of the nuclear decoration of Kai, tiles or floors are laid in the home, mainly to place floor tiles or wall tiles to facilitate the reasonable protection of previous construction projects, so as to avoid damage to the previously installed construction projects, such as circuits, waterways, etc. It is also necessary to consider whether it is conducive to the rational allocation of the previous phase of the construction project.

    2. When placing tiles on the wall, you must pay attention to the level and right angle between each tile. Movies and movies should be razed to the ground. After being confused, the treatment of the edge strip requires confirmation of the level of the tile and the edge of the edge.

    After paving, filling and filling, making decoration, training, attention, place tiles, floor tiles in place, and supervising the details of the work, confirm the effect of paving the entire wall, if the color and pattern have the wrong plan, and clean the surface of the tiles is correct. The process after filling the tiles.

    Second, the wall tiles are first attached to the floor or the wall first, how to veneer the bricks1. Leveling.

    When paving the floor tile wall, the surface of the paved wall must be treated after the leveling layer is to remove the surface dirt and dust with water, then mixed and leveled with cement mortar, and then the layer is completely dried.

    2. Pull the line. According to the design requirements of the paving pattern, determine the brick placement scheme and pull the marking line on the drying hearth bed. The purpose of the drawing is to keep the joints of the tiles laid straight and keep the tiles in a vertical plane.

    4. Mixing. The laying of glazed wall tiles is made of 425 cement (that is, cement, medium sand is evenly sanded, and the ratio of water dry and rising mud and sand mixed with water is 1:3 to form a paste.

    The marking of cement should not be too high, otherwise the tension of cement mortar will cause the brick surface of the brick to crack, which will lead to engineering quality accidents.

    5. Paving the road. Spray enough water on the walls and apply cement mortar evenly on the back of the enamel tile to be used (mix cement mortar in step 4). The thickness of the mortar is from 5 mm to 6 mm, and large wall tiles are placed.

    The above isWhether the wall tiles are attached to the floor or the wall firstFor the introduction, you can refer to the above.

    You can get it for free

Related questions
8 answers2024-04-23

First, look at the appearance.

The color of the tile should be uniform, the surface finish and flatness should be good, the surrounding rules should be regular, the pattern is complete, and four or five pieces should be extracted from a box to see if there are defects such as color difference, deformation, lack of edges and corners. >>>More

10 answers2024-04-23

Floor tile works are more profitable.

Of course, if you have the conditions, look for Party A to see if you have this way, but the project will generally have a pressure situation. >>>More

13 answers2024-04-23

Floor tiles and wall tiles, although they are both bricks, there are still some differences. However, in recent years, floor tiles on the wall have become a more popular decoration method. Why do you lay floor tiles on the walls? >>>More

13 answers2024-04-23

1. The surface of the all-porcelain floor tiles is polished, although it is said to be relatively bright, but the pattern is single, compared with the all-glazed tiles, etc., it is far behind. Because the full glazed tile is not limited by the technical aspects in terms of brick design, and the texture is not the same, it is relatively rich. However, in comparison, all-over bricks. >>>More

19 answers2024-04-23

When it comes to interior decoration, we generally do the laying of floor tiles before installing sliding doors. There are several reasons for this order. >>>More