What are the steps after the on site review of the pressure pipeline installation qualification?

Updated on society 2024-04-14
5 answers
  1. Anonymous users2024-02-07

    Information that the installation unit should prepare before the review:

    a) Basic profile of the applicant;

    b) Documents (original) and organization certificate (original) registered or registered in the local ** in accordance with the law;

    c) the special equipment license (original) held by the applicant for renewal and the list of projects for the installation of pressure pipelines during the license period;

    d) Special equipment quality assurance manual and its related program documents, operation (process) documents;

    e) quality assurance engineer, quality control system responsible personnel list and letter of appointment, employment contract, salary schedule, relevant insurance certificates, ID cards, professional title certificates, academic certificates;

    f) Engineering and technical personnel, special equipment operators (welding, non-destructive testing) schedules and their employment contracts, salary schedules, relevant insurance certificates, ID cards, professional title certificates, academic certificates and special equipment operator certificates (original);

    g) equipment, tooling, instruments, appliances, inspection and test devices and other accounts;

    h) inspection test device verification and calibration schedule, ledger and verification records;

    i) the list of qualified sub-suppliers (contractors) of the applicant and the evaluation report of the sub-suppliers (contractors);

    j) List of relevant laws, regulations, safety technical specifications and their corresponding standards;

    k) Other materials required in the appraisal process.

    l) the acceptance of the license project trial installation project contract, commencement notice, design documents (including design drawings, design calculations, installation instructions, etc.), operation (process) documents (including work instructions, process evaluation reports, process regulations, process cards, inspection process regulations, etc.), quality plans (construction organization design or construction plan), inspection and testing, acceptance records and reports (sub-project acceptance report, acceptance report, completion report), supervision and inspection report, quality certification materials, etc.

  2. Anonymous users2024-02-06

    The enterprise safety production license is definitely a must, followed by the pressure pipeline installation qualification qualification on the construction qualification certificate, and the pressure pipeline installation license for the type of licensed installation pipeline.

  3. Anonymous users2024-02-05

    Legal Analysis: Pressure Pipeline Installation Qualification Level Regulations:

    1. The installation unit with GA1 installation qualification, that is, the installation qualification of the corresponding variety of pressure pipes in GA2 grade;

    2. The installation unit with GC1 installation qualification, that is, the installation qualification of the corresponding variety of pressure pipelines in GC2 and GC3 grades;

    3. The installation unit with GC2 installation qualification has the installation qualification of the corresponding variety of pressure pipelines in GC3 level.

    The installation unit must have the following basic conditions:

    1.Have legal personality and industrial and commercial business license;

    2.Quality system required for pressure piping installation;

    3.Have the installation performance and installation ability of the pressure pipe within the scope of the application;

    4.Through the engineering project, the installation quality is qualified and the safety performance is reliable.

    Legal basis: Measures for the Administration of Construction Permits for Construction Projects

    Article 5 The application for a construction permit shall be carried out in accordance with the following procedures:

    1) The construction unit shall obtain the application form for construction permit from the issuing authority.

    B) the construction unit with the unit and the legal representative of the seal of the "construction permit application form", and attached to the fourth article of the supporting documents, to the issuing authority to apply.

    C) the issuing authority in the receipt of the construction unit submitted by the construction unit of the "construction permit application form" and the attached supporting documents, for the eligibility, shall be issued within 15 days from the date of receipt of the application; If the supporting documents are incomplete or invalid, the construction unit shall be informed of all the contents that need to be supplemented and corrected on the spot or once within five days, and the examination and approval time may be extended accordingly after the certification documents are completed and corrected; For those who do not meet the requirements, the construction unit shall be notified in writing within 15 days from the date of receipt of the application, and the reasons shall be explained.

    In the course of the construction of a construction project, if the construction unit or the construction unit changes, it shall re-apply for a construction permit.

    Article 6 The name, location and scale of the project for which the construction unit applies for a construction permit shall be in accordance with the construction contract signed in accordance with the law.

    The construction permit shall be placed at the construction site for future reference, and shall be disclosed at the construction site in accordance with regulations.

  4. Anonymous users2024-02-04

    The pipeline installation qualification process includes: application, review, review, approval and certification. Pipeline installation qualifications generally involve pressure pipeline licenses, municipal public works construction general contracting fiber-seepage qualification, building mechanical and electrical installation engineering professional contracting qualifications, and mechanical and electrical engineering construction general contracting qualifications.

    1. The process of pressure pipeline installation qualification includes five procedures: application, acceptance, appraisal and review, review and certification.

    2. Units applying for pressure pipeline installation qualifications shall apply to the national or local administrative examination and approval service bureau.

    3. The license examination and approval authority shall review the application materials submitted by the installation unit and decide whether to accept it within five working days after receiving the application materials.

    Fourth, after the acceptance of the cluster buried installation unit, the installation project can be carried out.

    5. If the installation unit believes that it has met the conditions for on-site appraisal and review in accordance with the licensing rules, it can make an appointment for review.

    The above is the process of handling the qualification of pressure pipeline installation.

  5. Anonymous users2024-02-03

    The requirements for obtaining the pressure pipeline installation qualification license are: the enterprise has a qualification of more than 2 million yuan, and the number of full-time employees of the enterprise is more than 60 people. To apply for the qualification license for pressure pipeline installation, the application for installation license shall be submitted to the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China or the provincial quality and technical supervision department, and the application for special equipment installation, transformation and maintenance license, enterprise profile, industrial and commercial business license (copy), organization ** certificate (copy), certification that has been obtained or its poor grade is other qualification certificate (copy), and quality assurance manual.

    Article 3 of the Regulations on Safety Management and Supervision of Pressure Pipelines.

    This regulation applies to pipelines and their ancillary facilities that meet one of the following conditions:

    1) Transporting GB5044 "Classification of Occupational Exposure to Toxic Hazards" as the degree of toxicity specified in the extremely hazardous medium;

    2) Pipelines transporting Class A and B media with fire hazards specified in GB50160 "Code for Fire Protection Design of Petrochemical Enterprises" and GBj16 "Code for Fire Protection Design of Buildings";

    3) The maximum working pressure is greater than or equal to the gauge pressure, the same below), and the pipeline where the conveying medium is gas (steam) and liquefied gas;

    4) Pipelines with a maximum working pressure greater than or equal to a liquid in which the medium being conveyed is flammable, explosive, toxic, corrosive or the maximum working temperature is higher than or equal to the boiling point;

    5) Ancillary facilities and safety protection devices of pipelines specified in the preceding four items.

Related questions
10 answers2024-04-14

AQSIQ.

Conditions for Pressure Pipeline Installation Qualification License: >>>More

10 answers2024-04-14

Looking forward to it, I haven't done this, can't they provide something like this, you implement it one by one according to the above!

5 answers2024-04-14

Pipeline installation is generally installed by a special master, you will not be a master, I learned a little from Master Wan in the installation rules: >>>More

9 answers2024-04-14

It has little to do with stress!

Take a look at the articles of our company's technicians, and you will understand. >>>More

4 answers2024-04-14

The fire pipe installation specification includes seven major aspects, namely the scope of the specification, pre-construction preparation, operation technology, quality standards, finished product protection, quality problems that should be paid attention to, quality records, etc. These aspects involve all aspects of fire pipe installation, and must be implemented in accordance with these specific fire pipe installation specifications when installing.