-
The construction field of the equipment floor refers to the floor dedicated to the layout of mechanical and electrical equipment, etc. At the same time, the device layer also includes the following points, which are as follows:
Fire escape (especially high-rise buildings) floor.
Fire-fighting equipment and facilities layer (fire-fighting standby water tank, fire-fighting stabilizer water pump).
Water supply, return pipes, etc.
Elevator equipment machine room.
Domestic water supply pipeline layer (high-rise buildings use sectional water supply).
Heating is provided.
broadband cable equipment, etc.
The equipment floor is generally set up in the basement, which can also be on the roof, or in the elevator machine room, and on the first floor.
The term equipment floor is mostly used in the field of construction and automation, and is used to refer to floors and levels. In the field of construction, it is used to refer to specialized floors, while in the field of automation it is used to distinguish it from other systems.
Devicelayer automation: The traditional industrial automation control system mainly includes three levels, namely the device layer, the control layer, and the information layer. The function of the equipment layer is to connect the field device to the fieldbus network in the form of a network node, and in accordance with the protocol standard of the fieldbus, the device adopts the structure of a functional module, and completes various functions such as data acquisition, AD conversion, digital filtering, temperature and pressure compensation, and PID control through configuration design.
-
The equipment floor refers to the floor dedicated to the layout of mechanical and electrical equipment, etc.
At the same time, the equipment layer also includes: 1. Fire escape (especially high-rise buildings) floor. 2. Fire-fighting equipment and facilities layer (fire-fighting standby water tank, fire-fighting stabilizer water pump).
3. Water supply, return pipeline, etc. 4. Elevator equipment room. 5. Domestic water supply pipeline layer (high-rise buildings adopt segmented water supply) 6. Provide heating and heating.
7. Broadband cable equipment, etc.
The equipment floor is generally set up in the basement, which can also be on the roof, or in the elevator machine room, and on the first floor.
The Residential Design Code (GB50096-2011) stipulates that the equipment floor refers to the space layer in the building that is designed to set up the equipment and plumbing construction personnel for heating, ventilation, air conditioning, water supply and drainage, and electrical.
-
1. What is the equipment layer?
Equipment floor: refers to the floor dedicated to the layout of mechanical and electrical equipment, etc., and the equipment floor is generally meters high. All or most of its effective area is used as the layout of equipment such as air conditioning, water supply and drainage, electrical, elevator machine room, etc., and the space layer for high-rise residential buildings to set up HVAC, air conditioning, water supply and drainage and electrical equipment and pipeline construction personnel enter the operation.
Heating pressurization equipment, water supply pressurization equipment, fire pools, etc. are generally placed on the basement floor, and the elevator machine room is on the top floor.
At the same time, the device layer also includes:
1. Fire escape (especially high-rise buildings) floor.
2. Fire-fighting equipment and facilities layer (fire-fighting standby water tank, fire-fighting stabilizer water pump).
3. Water supply, return pipeline, etc.
4. Elevator equipment room.
5. Domestic water supply pipeline layer (high-rise buildings adopt segmented water supply mode).
6. Provide heating and heating.
7. Broadband cable equipment, etc.
Second, the equipment floor is generally on several floors.
In general, for buildings less than 30 meters, the equipment floor is located on the roof, top floor or basement. High-rise residential buildings usually have 10 or 20 floors with an equipment floor, and the specific number of floors should depend on the building design.
Method of identifying the equipment layer: Generally, walk the stairs and walk to the floor with a particularly low floor height, which is generally the equipment layer.
-
In a high-rise residential building, what is an equipment floor? How many layers are the device layers? You'll know after reading it.
-
Summary. Hello Here for you to find out the difference between the equipment layer and the technical layer of the house: 1. What does the equipment layer mean The equipment layer is a unique design of high-rise buildings, it refers to a certain floor, this floor is not good, and it is used to arrange various equipment, including the air conditioning equipment, water supply and drainage equipment, electrical equipment, and the layout of the elevator machine room equipment and so on.
Because there are a lot of motors installed on the equipment floor, it is easy to have problems such as noise and radiation, so we will try to avoid buying housing on the upper and lower floors.
Hello here Feng Lao for you to find out the difference between the equipment layer and the technical layer of the house: 1. What does the equipment layer mean The equipment layer is a unique design of high-rise buildings, it refers to a certain floor, and the floor is not good, which is used to arrange various equipment, including the air conditioning equipment of the entire building, water supply and drainage equipment, electrical equipment, and the layout of elevator room equipment and so on. Because there are a lot of motors installed on the equipment floor, it is easy to have problems such as loud noises and radiation, so we will try to avoid buying houses on the upper and lower floors.
Technical level refers to the local level used for the installation of water, electricity, heating, sanitation and other equipment in the natural layer of building beams and land. The technical layer can be seen from the appearance, the normal windows between the layers are evenly distributed, if there is a distance between the two layers, the Ming and Qing dynasties are thicker than the other layers, it is said that there is a technical layer in the slag slippery.
-
Summary. Pro, the building equipment room, such as the host that is the program-controlled user switch, the data processing machine that is the computer host, can be put together with the integrated wiring distribution frame, can also be set up separately. In the larger integrated wiring, the computer host, the program-controlled user switch, and the building automation control equipment are generally set up in the computer room, and the hardware or equipment closely related to the integrated wiring is placed in the integrated wiring equipment room.
Pro, building equipment room, such as the host that is the program-controlled user switch, the data processing machine that is the computer answering the host, can be put together with the integrated wiring distribution frame, can also be set up separately. In the larger integrated wiring, the computer host, the program-controlled user switch, and the building automation control equipment are generally set up in the computer room, and the hardware or equipment closely related to the integrated wiring is sold in the integrated wiring equipment room.
Pro, the floor equipment room can be divided into several sections, such as heating pressurization equipment, water supply pressurization equipment, fire pool, etc., which are generally placed on the basement floor, and the elevator machine room is on the top floor. The equipment layer refers to a certain floor of a high-rise building, and all or most of its effective area is used as the layout of equipment such as air conditioning, water supply and drainage, electric land gas, electric elevator machine room, etc.
Dear, the building equipment room is what I found on the Internet, not very clear, forgive me.
I hope the above is helpful to you If you are satisfied with me, please give me a like
The floor equipment room does not seem to be the answer you want, but what do the two types of equipment have in common?
Pro, the common points are simply put, such as the fire central control system, ventilation system, and wiring system where you live.
Dear, just like a car such as an engine, the water tank can't be exposed, so you need to install them.
yes, maybe I didn't say it carefully, but what I want to know is the network system integration and the equipment room of the integrated cabling.
Dear, generally this kind of equipment room is in the basement, just where I live, the monitoring room, the electric cabinet room, and some rooms that I didn't pay attention to are in the basement.
Okay, thank you.
Ask about custom messages].
-
The equipment floor refers to the floor where all or most of a certain floor of the building is used as the floor for the installation of equipment such as air conditioning, water supply and drainage, elevator machine room, etc. It is indispensable to ensure the normal operation of building equipment in high-rise buildings. For the equipment floor of a 26-storey house, it will generally be located in three places:
1. Basement. At present, the equipment floor of high-rise residential buildings will choose basement or underground parking lot. However, it should be noted that these underground spaces are not lit and ventilated, which means that they cannot be inhabited, so many developers have selected the equipment floor in the basement.
2. The middle floor of the building. The equipment placed underground is generally high-power machines, such as refrigerators, water reservoirs, etc. However, some basic living services, such as water tanks, air conditioner wiring, etc., are generally located on the middle floor, which can ensure that all residents of this building can enjoy the required public services relatively evenly.
3. Top floor. For those equipment with a large amount of heat dissipation, such as boilers, blowers, etc., they should be placed on the roof of the building, which is also for safety reasons.
-
The equipment floor refers to the space layer in the building that is specially designed to set up water supply and drainage, electrical, heating, ventilation, air conditioning equipment and pipes, and can be used by personnel to enter and operate. Since construction equipment generates sound and vibration during operation, rooms near the equipment floor are susceptible to noise and vibration if sound insulation and vibration reduction measures are not good.
Generally speaking, 18-storey residential buildings, 1-10 floors, water supply in the low area, 11-18 floors in the high area water supply, two pressurized pumps or negative pressure water supply equipment, should be 10 floors between the tube wells, specific recommendations to consult the property floor, high-rise buildings, elevator-like machine room, elevator-like roof, set up elevator machine room, easy to control maintenance. >>>More
Degradaion (of equipment performance).
Equipment performance deterioration refers to the phenomenon that the original performance of the equipment is gradually reduced due to the wear and tear of parts, fatigue or deformation, corrosion, aging and other reasons caused by the environment during the use of the equipment. Usually this is a critical process from normal wear to sharp wear. >>>More
What is a duplex room?
1. A duplex house is a house that occupies two floors and has internal stairs up and down; Generally, the living, kitchen, dining room, and bathroom are arranged on the first floor, and the bedroom, study, and bathroom are arranged on the second floor. >>>More
Concrete pump trucks, small pump trucks, mixer pump trucks, mixer truck pumps, etc., Sanmin Heavy Industry has good durability and long life, you can go to find out.
The layer that is not frozen, also called the refrigerator, is designed to be in the range of 5-15 degrees, and the other is the freezer, the temperature range is -4 -24 degrees (four-star), and the refrigerator will reach a sub-zero temperature as soon as it works, with frost. >>>More