How much does it cost to do a smart construction site?

Updated on Car 2024-05-04
18 answers
  1. Anonymous users2024-02-09

    It costs about 500 yuan to build a smart construction site.

  2. Anonymous users2024-02-08

    A set of software and hardware systems for smart construction sites generally ranges from hundreds of thousands to millions.

  3. Anonymous users2024-02-07

    Smart construction sites. The system is generally determined according to the enterprise, generally the basic function + customized function, according to different scenarios, functional requirements, **is also different.

  4. Anonymous users2024-02-06

    The smart construction site is composed of the software and hardware of the smart construction site management system, and the full set of smart construction sites, all configured, is estimated to be millions. However, general enterprises are customized according to their needs, and the basic functions + functional modules are selected according to the needs. The basic functions are generally labor real-name system, monitoring function, visualization, BIM, etc., and there are many other demand modules.

  5. Anonymous users2024-02-05

    2022 DigitalizationSmart construction sites. How much does a set of management systems cost?

    In order to improve the level of industrialized smart construction site, digital smart construction site, intelligent smart construction site, and green smart construction site, different engineering projects face different functional requirements for construction scenarios, so the software system module of the smart site management platform and the corresponding hardware equipment will be different. Therefore, if you want to obtain an accurate smart site management platform system, you need to find the corresponding smart site service provider, so that the service provider can configure the targeted system software and hardware according to your needs, so that the software and hardware equipment of the smart site management system can be efficiently combined with the project, and play a role in reducing costs, improving construction efficiency, and preventing the occurrence of dangers.

    Crane. Anguis Technology focuses on the research and development of smart construction sites, has its own unique insights into the management of personnel, equipment, environment, materials and other aspects of the construction site, and has developed a series of management systems suitable for the construction site, which comprehensively solves the problems of high rubber on the construction site, helps managers save management costs, improve management efficiency, reduce safety accidents, and help the project be completed more successfully.

  6. Anonymous users2024-02-04

    The smart construction site is generally based on the demand for the construction of the single envy to be determined, each functional module is different, and the relative ** is not the same, for example, the preliminary brother chain god of "Jianyitong" is between 250,000-350,000, and if it involves custom development, it is even more different.

  7. Anonymous users2024-02-03

    The cost of building a smart construction site consists of two aspects:

    The first is the purchase and installation cost of intelligent Internet of Things hardware equipment.

    To build a smart construction site, it is necessary to select and install IoT hardware equipment according to various application scenarios of the construction site, for example, for the dynamic safety management of personnel, you can choose smart safety helmets and face recognition systems that include wearing hats and risky business; For the dynamic safety management of machinery, supporting monitoring equipment can be selected, such as Eagle Eye intelligent airborne monitor, tower crane safety monitoring system, unloading platform early warning system, etc.; For the investigation of engineering hidden dangers, intelligent drone inspection equipment can be selected. The cost of such hardware equipment is calculated according to the level of configuration and the number of purchases, and the market is usually highly transparent.

    The second is the cost of building a digital supervision platform.

    The smart construction site can realize the digital management of all elements and the whole process of the construction site, so platform management is inevitable. After the construction of the digital supervision platform, the key links such as the construction process, the full management of the safety and the cavity of the construction site, personnel management, and green construction of the auction can be collected in real time through intelligent hardware, so as to realize the comprehensive digital management of the construction site business.

    You can choose a professional smart construction site digital service provider according to your own construction needs, with fair fees and no unjust money.

  8. Anonymous users2024-02-02

    The price of the smart construction site system is generally determined according to the enterprise, and it is generally the basic function + customized upgrading function, which is also different according to different field judgments and functional requirements.

  9. Anonymous users2024-02-01

    A smart construction site includes multiple intelligent devices and systems, so the specific cost needs to be estimated according to the size of the site and the equipment and systems required. Here are some common smart site equipment and systems, as well as the approximate range:

    Unmanned aerial vehicle (UAV) inspection system: about 50,000 yuan to 100,000 yuan.

    Face recognition system: It takes about 10,000 yuan to 50,000 yuan.

    Environmental monitoring system: monitoring factors such as air quality, noise, etc., need to be considered, and it will take about 50,000 yuan to 200,000 yuan.

    Smart helmet: It takes about 10,000 yuan to 30,000 yuan.

    Wireless communication equipment: It is necessary to consider the site area and building structure, which will cost about 20,000 yuan to 100,000 yuan.

    All things considered, the cost of a relatively complete smart site system may be around 300,000 yuan to 500,000 yuan. Of course, this will also vary depending on the specific needs.

  10. Anonymous users2024-01-31

    Smart construction site is the embodiment of the concept of smart earth in the engineering field, and it is a new concept of project life cycle management.

    Smart construction site refers to the use of information technology, through the three-dimensional design platform for accurate design and construction simulation of engineering projects, around the construction process management, the establishment of interconnected collaboration, intelligent production, scientific management of the construction project information ecosystem, and this data in the virtual reality environment and the Internet of Things collected engineering information data mining analysis, to provide process trends and expert plans, to achieve engineering construction visualization intelligent management, in order to improve the level of engineering management informatization. So as to gradually realize green construction and ecological construction.

    Smart construction sites implant more high-tech technologies such as artificial intelligence, sensing technology, and virtual reality into various objects such as buildings, machinery, personnel wearing facilities, and site access gates, and are generally interconnected to form the "Internet of Things", and then integrate with the "Internet" to realize the integration of project management stakeholders and the construction site. The core of a smart construction site is to improve the way the various stakeholders and personnel interact with each other in a "smarter" way, so as to improve the clarity, efficiency, flexibility and responsiveness of the interaction.

  11. Anonymous users2024-01-30

    The popularity of smart construction sites in the past two years is a change in the thinking of information construction in the engineering and construction industry, and it is a more pragmatic return, from focusing on the needs of the upper level to paying more and more attention to the needs of the grassroots level, and paying more attention to the experience and application of the front line. If the smart construction site is one of the cornerstone applications of the smart city, then the front line of the project department is the cornerstone of the intelligence of the entire engineering and construction enterprise, and whether the front line can be truly applied determines the vitality of the entire enterprise smart system, and provides support for the future big data decision-making and analysis at the enterprise level and the industry level.

    Smart construction site is to provide a method for the quality and safety management of construction through scientific and technological means, through the installation of various monitoring devices on the construction site, the construction of intelligent monitoring and prevention system, can effectively make up for the defects of traditional methods and technologies in supervision, to achieve all-round real-time monitoring of personnel, machinery, materials and environment, and change passive "supervision" to active "monitoring"; Truly achieve early warning in advance, normal detection during the event, and standardized management after the event. Achieve information management of construction site safety production. Through the implementation of system construction, strengthen the management of construction site personnel, accurately grasp the attendance situation, the employment situation of various types of work, the implementation of special safety education, and the illegal operation, realize the real-time dynamic management and safety supervision of labor personnel on the construction site, improve the level of enterprise information management, and effectively implement corporate social responsibility.

  12. Anonymous users2024-01-29

    Global Gongde will answer for you:

    Smart construction site refers to the use of information technology, through the three-dimensional design platform for accurate design and construction simulation of engineering projects, around the construction process management, the establishment of interconnected collaboration, intelligent production, scientific management of the construction project information ecosystem, and this data in the virtual reality environment and the Internet of Things collected engineering information data mining analysis, to provide process trends and expert plans, to achieve engineering construction visualization intelligent management, in order to improve the level of engineering management informatization. So as to gradually realize green construction and ecological construction.

    The real "smart construction site" construction can achieve real-time control in the management of materials, machinery and equipment. In the traditional site management model, the management of materials and machinery and equipment is not controllable. For example, traditional material management:

    After the material plan is proposed by the technical department, the construction of the smart construction site at the Wuhan prefecture and municipal level, and the development of the smart construction site is related to the procurement by the material department, and then the material department will sign for the receipt after the material arrives at the site. In this process, there are often situations where the materials cannot arrive on time, and the materials on site are insufficient or unqualified. The "smart construction site" is based on the Internet of Things, big data and BIM technology to track and manage incoming materials.

    Real-time monitoring of the entry of materials, management personnel can understand the entry of main materials at any time. For example, the material is currently located in the first place, whether the manufacturer's stock is sufficient, the processing of the components, and the transportation time required for the material to enter the site. After understanding this information, managers can effectively control the entry of materials according to the actual progress of the project.

    In terms of machinery and equipment management, the entry and exit time of machinery and equipment can be reasonably arranged according to the simulation of the construction schedule. When the machinery and equipment enter the site, the management personnel can understand the location and use of the incoming machinery and equipment in the building through the additional information. When the machinery and equipment are withdrawn, the management personnel will find the machinery and equipment in time through the additional information to prevent loss and damage.

  13. Anonymous users2024-01-28

    Smart construction site is to integrate the innovative achievements of Internet + into the construction industry, which promotes the leap of the traditional construction industry and promotes the development of smart cities.

  14. Anonymous users2024-01-27

    Focus on smart construction and build a digital intelligence era! Set BIM technology, cloud computing, big data, Internet of Things technology, mobile technology, intelligent equipment, 3S technology (remote sensing technology RS, geographic information technology GIS, global positioning system GPS), VR AR MR technology (virtual reality, augmented reality, mixed reality technology) and other technical means, with the Internet of Things, big data as the core, to create a new project management model as the goal, based on one-stop, full-role, intelligent, and actively explore the future development trend of smart construction sites, improve the level of informatization of project management, and gradually realize green construction and ecological construction; At the same time, through big data fusion analysis, it provides reliable data for the group's decision-making and leadership. Integrated management of software and hardware:

    Unified deployment, unified maintenance, unified operation monitoring, unified integrated display, software and hardware interconnection integration, collaborative interaction, can carry out deeper mining and interaction of construction site data. Interconnection: Reject information silos, realize device linkage, collaborative work, and multi-party sharing.

    Customized service: The function menu is modular, and it supports arbitrary expansion and customization.

  15. Anonymous users2024-01-26

    Dust suppression and dust removal equipment for construction sites, fog cannon machines, wheel washers, enclosure sprays, dust detectors, etc., can effectively reduce construction pollution.

  16. Anonymous users2024-01-25

    First of all, it is necessary to understand what is intelligent engineering, intelligent engineering is based on the data collection of Internet of things terminal equipment, and the platform adopts the method of "terminal + cloud + big data" to integrate the application and hardware equipment of the construction site to form a data collection and generate a data center. Moreover, when the whole project is designed, the construction site management is based on big data, with solutions as the core, cloud computing and deep learning as the means, and real-time supervision of equipment and management data is carried out, so as to realize intelligent management, intelligent monitoring and intelligent services in the construction process. The value on the platform can be said to be very high.

    Xiaoshui Intelligence believes that the application of fragmentation and the unified supervision of one-stop management foundation are the main ideas of intelligent construction sites.

  17. Anonymous users2024-01-24

    Smart construction site is the concrete embodiment of the "Internet +" concept in the field of construction engineering, and is the cornerstone of realizing "smart city".

    It should be a new model based on the integrated management of the engineering site, making full use of the new generation of information such as mobile Internet, Internet of Things, cloud computing, and big data.

    Information technology, real-time monitoring of the construction site production progress, key equipment, personnel management, green and civilized construction (four sections and one guarantee) and other dynamic information, and gradually change the traditional construction site involved in the construction of all parties involved in the on-site management of the interaction, work mode and management mode, and on the basis of this informatization.

    Big data processing technology assists construction management to achieve safer, more efficient and lean construction site management.

  18. Anonymous users2024-01-23

    Smart construction site is a construction site management model that applies intelligent information technology, aiming to improve the efficiency, safety and resource utilization of construction site management. The management of smart construction site includes many aspects such as rough bridge safety, on-site supervision, personnel management, cost control, equipment management, etc., mainly through the application of Internet of Things, cloud computing, big data, artificial intelligence and other technologies to collect, analyze, manage and apply information in the construction site. Smart construction sites generally include the following aspects:

    1.Automated equipment management: including the management of construction machinery and equipment, safety equipment, labor equipment, etc., and the use supervision and data monitoring of each equipment are incorporated into the smart site management system to achieve unified equipment management and operation monitoring.

    2.Intelligent safety monitoring: Through face recognition, intelligent monitoring and location tracking and other technologies, real-time monitoring of the safety situation of the construction site, warning and preventing the occurrence of various safety accidents.

    3.Material management: Through RFID technology, barcode recognition and other Internet of Things technologies, real-time supervision of materials, materials, engineering quantities, etc., greatly improves the efficiency and accuracy of construction period control and material transportation, and shortens the warehouse material management cycle.

    4.Data analysis and decision support: Through the analysis of various data through big data technology, the operation of the construction site, the risk situation and other aspects of the guidance are realized, and the project decision-making support and reference are provided for the controller.

    In short, the smart construction site is an intelligent construction site management system, which realizes the unified management of construction site resources, data sharing and analysis, process optimization and intelligent decision support through technical means, and improves the efficiency of construction site management and the comprehensive competitiveness of the project.

Related questions
4 answers2024-05-04

Motherboard: ASUS P5P43 550

cpu:e6700 500 >>>More

30 answers2024-05-04

1.Some students want to become a professional pastry chef in the future, so it is generally better to get a professional training school to study for 1-2 years. There are also some people who want to learn some varieties and quickly open a bakery, which generally ranges from 2 months --- 2 years, according to their actual situation. >>>More

25 answers2024-05-04

Cochlear implant is an electronic device, which is relatively expensive, and there are three main manufacturers abroad, which have high-end, mid-range and low-end products. At the same time, it is also necessary to choose suitable products according to the child's cochlear condition. The general price of foreign cochlear products is more than 100,000 yuan, and the highest can reach 300,000 yuan. >>>More

7 answers2024-05-04

Hello! How much does it cost to remove a birthmark with a laser, and the important thing is related to the type of birthmark removal. There are many types of birthmarks, and there are different types of birthmarks. >>>More

14 answers2024-05-04

<> different stages of CFA exam registration, the cost is different, the first stage of registration** is 1100$-1200$, the second stage of registration** is 1400$-1500$, the first stage of registration** is 1830$-1930$, the CFA exam fee includes the cost of CFA electronic version of the official textbook, if you buy paper version of the textbook, or other materials, you need more fees. >>>More