-
I can provide it, leave an email and I can send it to you.
-
Date of Signing: YYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYY
Hereinafter referred to as Party B) Lessor: (hereinafter referred to as Party A) In accordance with the relevant provisions of the Contract Law of the People's Republic of China, in accordance with the principle of equality and mutual benefit, after negotiation between the two parties, Party B hereby signs this contract for Party B to lease equipment to Party A.
1. Party A provides Party B with an excavator.
2. This equipment is limited to construction purposes.
3. Party A has the ownership of the leased equipment, and Party B only has the right to use the leased equipment within the scope specified in this contract during the lease period.
4. Party A is equipped with an operator for the equipment, and Party B is responsible for food and accommodation.
5. The leasing fee of the equipment is calculated according to the tonnage (per ton), and the monthly work statistics table of the operator must be signed (sealed) by Party B to take effect. Unified settlement at the end of the month.
6. The entry and exit fees of the equipment shall be borne by the party.
7. Party A shall collect Party B's deposit as a guarantee for the performance of this contract.
Lessee (Party B):
Lessor (Party A): Legal representative:
Legal representative: Principal: Principal:
Client: Address:
Address: Telephone:
Telephone: Account opening:
Account opening bank: Account number:
Account number: Tax number:
Tax ID:
-
Used excavator sales contract.
The parties to the conclusion of the contract:
Buyer: Seller:
Article 1 The product name Komatsu hydraulic excavator specifications and quality PC350-7 unit price yuan 2nd payment and settlement method for payment and expenses: one-time payment in cash on site.
Article 3 Delivery Provisions.
1.Delivery Method: Self Pickup.
2.Place of delivery: Shenzhen Huanggang second-hand construction machinery market.
3.Delivery date: May 17, 2011.
Article 4 Economic Responsibility.
1.Party A's economic responsibility.
1) When the delivery time of the product does not meet the requirements, Party A shall reimburse Party B for a penalty of 1% of the total value of the deferred part of the payment for each day of delay.
2) If Party A fails to deliver the relevant documents and materials other than the documents of the subject matter to Party B as agreed, Party A shall bear the relevant liability for compensation.
Article 5 If there is any dispute or controversy in the execution of this contract, both parties A and B shall negotiate to settle it, and if it cannot be resolved, both parties may deal with it in the following ways:
1. Filed a lawsuit with the People's Court of Huanggang District, Shenzhen in accordance with the law.
Article 6 This contract shall come into force on the date of signature of both parties.
Article 7 This contract shall be executed in duplicate, one copy by each party.
Contractor:
Party A: (stamped) Party B: Stamped).
-
Excavator lease contract.
Party A (lessor):
Party B (Lessee):
Party B needs to rent Party A's excavator due to the construction of the project, in order to ensure friendly cooperation between the two parties, in accordance with the "Contract Law of the People's Republic of China" and other relevant provisions, after equal negotiation between the two parties, enter into this contract, and jointly perform.
Second, the model and quantity of leased machinery:
Fourth, the lease slip lease method and **: monthly lease, monthly rent of 34,566 yuan (capitalization: 30,000 Wu Bai Lu Shi Lu Yuancheng).
5. Settlement method: After the machinery enters the site, the lease fee is paid in one lump sum, and Party B bears the machinery entry and exit fee of 600 yuan.
6. Party A's Duties and Rights:
1. Party A's driver shall ensure that the equipment is in good working condition, and be responsible for the maintenance and maintenance of the excavator in a timely manner according to the maintenance procedures of the equipment;
2. Party A is responsible for maintaining the normal use of hydraulic oil and accessories during the rental and use of machinery;
3. Party A is responsible for equipping a total of 1 skilled and healthy operators (to ensure the use of Party B), and bears the operator's salary, social, work-related injury insurance and various old benefits;
4. Party A's operators must accept the command of the person in charge of Party B's construction site, must abide by Party B's rules and regulations, and take the initiative to cooperate with the construction site;
5. Party A must strictly implement the relevant operating procedures and relevant regulations, and shall not operate in violation of regulations, otherwise Party A shall bear all the consequences caused thereby;
6. Party A's operators must abide by the safety operation procedures, ensure the safety of the staff, find unsafe hidden dangers have the right to stop the operation, and have the responsibility to notify Party B in a timely manner to take joint measures, when the excavator fails, Party A must quickly organize personnel to carry out on-site repairs, timely elimination, in order to ensure the production and use of Party B;
7. If Party B proposes incompetent Party A operators, Party A shall replace them in time to meet Party B's use requirements;
7. Party B's Duties and Rights.
1. Party B is responsible for the care and daily management of the machinery after entering the site and the safety and integrity of the machinery;
2. Party B is responsible for the fuel and daily lubricating oil in the process of mechanical use;
3. Party B must strictly implement the requirements of excavator operation, and shall not command the operation in violation of regulations after Party A raises objections, otherwise Party B shall be responsible for the losses caused thereby;
4. Party B is responsible for the command of Party A's operators and the adjustment of work shifts, and has the right to propose to replace unqualified operators.
5. Party B is responsible for providing free accommodation for Party A's operators.
8. Party B shall pay Party A after receiving the official invoice issued by Party A.
9. For matters not covered in this contract, the two parties may enter into a supplementary agreement through negotiation, and if a dispute arises during the performance, it may be resolved through negotiation or adjudicated by the people's court at the place where the head office of the non-breaching party is located.
10. The term of this contract is tentative, and the specific date shall be executed according to the actual use settlement.
11. This contract shall be executed in triplicate, with Party B holding two copies and Party A holding one copy.
Party A's unit (official seal) Party B's unit (official seal).
Principal Investigator Project Leader.
or entrust the person in charge or entrust the ** person.
Date of signing 20 years, month and day.
-
Party A: Party B:
Party A and Party B have negotiated amicably, and Party B is entrusted by Party A to provide various services as follows:
1. Leased equipment: If there is more equipment required, the list of equipment listed by Party B is a valid annex to the contract). Please prepare the electric slip grip source, venue, etc.
2. Service date: from YYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYYY If the activity lasts for one day, Party A needs to provide Party B with lunch and drinks.
3. Service location:
Fourth, the nature of service:
5. Rent payment: the total amount of the full payment is RMB. This is the price excluding tax (4 tax if invoiced).
If Party A is responsible for transportation, it will pick up personnel and equipment at Party B's company at the time agreed by both parties, and be responsible for transporting them back after the event. On the day of the event, after all the service personnel and equipment are transported and installed and commissioned, Party A of Xinsenqing needs to pay Party B in full as labor remuneration. If it is a multi-day event, it will be negotiable.
6. Breach of Contract Clause.
1. After the contract is signed, if one party cancels the contract without reason, it shall compensate for the actual loss.
2 In case of weather and man-made reasons that make the event unable to be held or interrupted in the middle of the event, Party A shall be responsible for the responsibility.
3. If it is a multi-day event, the equipment shall be placed at the event location, and Party A shall be responsible for the custody of the equipment.
7. This contract is drafted in accordance with the relevant laws of the People's Republic of China, and if there are any unfinished matters, both parties shall draw up a written agreement or handle it in accordance with relevant laws and regulations. In the event of a dispute, the two parties shall not resolve it satisfactorily, but will resolve it through the relevant institutions in accordance with the relevant laws of the People's Republic of China.
8. This contract shall be executed in duplicate, one copy of which shall be signed and sealed by both parties, and shall take effect immediately.
9. What is the evaluation of the voice actors of this event: excellent () good () medium () poor () reasons
10. What is the evaluation of the audio equipment of this event: excellent () good () medium () poor () reasons
Ten. 1. Supplementary provisions: cash settlement.
Party A: (stamped) Party B: Stamped).
Representative (Signature): Representative of Harukami (Signature):
Fax: Fax:
YYYYYYYYYYYYYYYYYYYYYYYYYYYYY
-
Equipment transferee: (Party A) ID number:
Device recipient: (Party B) ID number:
The following agreements are hereby reached by mutual agreement between Party A and Party B:
1) Due to the redundancy of Party A's equipment, the transfer desk is now transferred to Party B, working hours, the factory number is, after the person in charge of Party B and technical personnel on-site to see the machine test, Party A and Party B reached a negotiated price of RMB, capitalization () Party B in line with mutual trust in the case of cash advance payment of RMB. Pick up the goods on the day, month, and day. If Party A does not sell the goods to Party B within the time limit of deposit prepayment, Party A will bear 3 times of the deposit as liquidated damages and compensate Party B for losses.
2) Party A** The equipment provides the machine; Valid documents such as factory certificate, purchase invoice, import declaration form for imported equipment, etc.
Remarks: 3) If the machine is stolen by Party A or the source is unknown, Party A will bear all legal responsibilities.
4) If the certificate of conformity, purchase invoice or import declaration form is lost, it is necessary to issue a certificate at the local public security organ or police station to prove that the equipment belongs to Party A.
4) If Party A has had economic disputes with others or partners in the past, the property rights issue will have nothing to do with Party B.
5) If Party A does not pay the mortgage in the bank when purchasing the machine, after giving Party B privately, the bank will recover any responsibility and the balance payment shall be paid off by Party A, such as after Party B, it is the reason of Party A, for example, Party A shall be responsible for compensation for any loss caused by the GPS satellite positioning system locked.
6) Party A is responsible for safely loading the equipment on Party B's transport vehicle on its own site. To ensure the smooth departure of Party B, Party B will pay the balance in a lump sum, and the property right of the aircraft belongs to Party B.
7) This agreement is hereby concluded for the mutual compliance of both parties. Party A shall provide a copy of the ID card attached to the contract.
8) This agreement shall be made in duplicate, one copy of each of Party A and Party B, and it shall take effect immediately after signing and pressing the fingerprint.
9) If the equipment belongs to a two-person partnership or a multi-person partnership, it needs to be signed by the owner and take effect according to the fingerprint.
10) Party A's bank collection account number:
Party B's bank transfer account number:
Party A's Name: Party B's Name:
Unit: Date of signing: YYYYYYYYYYYYYYYYYYYYYYYYYYY
To see what kind of project you bought it for If it is a general excavation work If you want to reduce costs, I recommend that you buy Daewoo Fuel saving is not said And the accessories are not very expensive Daily maintenance is also very convenient If you buy it with a large project For example, standing with many excavators and loading the truck, then the speed of Daewoo can be seen It is much worse than Komatsu And the quality of Komatsu is really good If you buy it and use wet mining and excavation For example, sea cucumber rings in the sea, etc., it is recommended to buy Volvo It is really strong The chain is very wide It's not easy to spin into the mud In short, it depends on your personal expectations for the machine Of course, the above mentioned ** is not small. >>>More
Well, a brief description of my personal opinion :
1. Internal and external sales: small excavators are mainly used for small projects and municipal construction, and the internal and external advantages lie in the quality and market, rather than one-sided words to decide, the most important thing is the market. >>>More
Sumitomo excavator is selling technology, its speed is faster than Komatsu, Carter, etc., but the fuel consumption is very small, and the strength is quite large! I feel that Sumitomo is very easy to use, and the original is ** expensive! One point is that the EFI engine has high requirements for diesel, and it must use Sinopec or PetroChina.
In terms of safety, there are three main aspects: 1In the air, do not touch wires, buildings, construction site personnel, etc., but also prevent falling objects from falling into the air from hitting the top of the machine; 2. >>>More
According to the working scenario, the excavator loading operation can be divided into three categories: flat loading, high platform loading and low loading. The three scenarios are different, and the technical difficulty is also different, among which the loading of the high platform is simpler, while the loading of the low position is more difficult. >>>More