I think it's better to install the foundation stone after the bricks are pasted! The reason is very simple, the cornerstone is buried in the ground, then there will be a gap between the cornerstone and the floor tile, once it is not treated well, the water will directly penetrate into the waterproof layer, then the waterproof completely depends on the waterproof layer, and it is difficult to protect the water leakage after a long time. If the tiles are pasted, the water will flow to the tiles and enter the floor drain along the slope.
-
The following points should be paid attention to when installing a shower room:
1. The embedded hole of the shower room size should be designed before the bathroom is decorated.
2. It is best to customize the shower room with the water supply system and tiles installed.
3. Wiring leakage protection switch devices should be considered before installation in the shower room to avoid rework.
4. The style of the bathing room depends on the layout of the bathroom, and the common ones are corner type and straight type.
5. When installing the bathing room, it should be installed in strict accordance with the assembly process.
6. The shower room must be firmly connected with the building structure and cannot be shaken.
7. The open shower room must be fixed with expansion bolts, fixed with a non-hollow wall, and drained, and the amount of water in the bottom basin is not more than 500 grams.
8. The appearance of the shower room after installation should be clean and bright, the sliding door and the sliding door should be parallel or perpendicular to each other, the left and right symmetry, the sliding door should be opened and closed smoothly, without gaps and no water seepage, and the shower room and the bottom basin should be sealed with silicone.
Acceptance criteria for the installation of the shower room:
Check the size: check whether there is an error between the measured size and the actual product size.
Check the level: the error should be controlled within 2mm 1000mm.
Check the vertical: the horizontal error of the upper and lower vertices on both sides of the shower room should be controlled within 10mm.
Check silicone: Silicone should be thin, uniform and beautiful.
Check the suction: the gap of the magnetic door suction strip should be even, the opening and closing should be flexible, and the opening and closing force should be between 15-40 Newtons.
Check the hinge: The hinge should be smooth and free of noise when opening and closing.
-
Our requirements for the decoration of the bathroom are also very high, and the ensuing problems are also very many, the water pipe is not installed, and the design is unreasonable, these are all problems. Nowadays, almost every family bathroom will be equipped with a shower room, but many people do not know how to install it. So let's find out togetherHow to install the dough skin in the shower roomAnd the installation steps of the shower room.
1. How to install the shower room and the installation steps of the shower room.
1. Preparation before installation: see if the packaging of the shower room is complete, and check whether its configuration is complete after opening. Prepare the necessary tools for the installation of the shower room and put them together for easy access.
2. Install the basin: combine the basin parts, adjust the level of the basin, and then ensure that there is no water in the basin and at the bottom of the basin. The hose expands and expands with distance, connecting the basin floor to the floor drain securely.
3. Test and protection (important link): After the bottom basin of the shower room is installed, it is also necessary to test the water to ensure that the water is unimpeded. Before the installation of the shower room, the installed basin should also be protected in time.
4. Installation of the shower room: whether the shower room is safe or not has an important relationship with whether the installation of the shower room is regular, whether the hole is accurate, whether the accessories are properly installed, and whether the waterproof seal is done well will affect the normal use of the product. The strength and angle of installation are also difficult for ordinary people to grasp.
5. Find a position and punch holes: clarify the layout of toilet water pipes, and try to prevent hidden pipelines from bursting when punching. Use a pencil and a level to determine the drilling position of the aluminum against the wall, and use a percussion drill to punch the hole.
6. Install aluminum (important link): Knock in the rubber particles at the drilling hole, and you can use screws to lock the aluminum strip on the wall. Note that it needs to be constantly adjusted as it is installed to maintain the verticality of the aluminum.
7. Fixed glass (important link): lock the glass clamp of the shower room at the hole of the bottom basin, and the bottom of the flat glass or curved glass falls into the glass clamp groove, and slowly pushes into the aluminum material attached to the wall. Then fix it with screws.
8. Install pipe jacking: find the corresponding position above the fixed glass and drill holes, install (straight and bevel) fixing seats and connect the pipe jacking. It is then fixed to the top of the glass with a bent sleeve.
9. Install the object frame: Align the position of the device frame, tighten the nut of the shelf, and then fix the shelf glass to keep it vertical and horizontal. Pay attention to waterproofing under the aluminum material that holds the glass in place.
10. Do a good job of waterproofing (important link): install suction strips or water-retaining adhesive strips on the side or below the glass as required. Then use silicone to close the joints between the aluminum and the wall, glass and the basin.
11. Install the movable door (important link): install the hardware of the movable door, and then install the hinge at the reserved hole of the fixed door. After installation, adjust the position of the shaft core of the lotus leaf until the door feels the best.
12. Debugging and fastening (important link): check whether each part is comfortable and smooth, and adjust it in time if problems are found. After adjusting it, tighten the corresponding screws, which will make the whole shower room more secure.
-
The installation method of the shower room is as follows (take the TOTO double wooden shower room as an example):
Tools Raw materials: toto double wooden shower room, stainless steel screws, grinding machine.
Method Steps:
1. If the cornerstone of the shower room is not level, the grinding machine should be used to grind off the higher part, and it is best not to use tiles or other things to cushion it, because the gap between the pads is too large, which not only hinders the appearance, but also makes it easy to leak when the glass glue is aging and loose over time.
2. Workers polish the cornerstone.
3. Find a good level.
4. Assemble the frame of the shower room, preferably with stainless steel screws.
5. The installation of the shower room is completed.
-
Before the installation of the shower room, the first thing to do is to prepare the materials and tools:
1) Material preparation: The materials used in the installation of the shower room include frames, tempered glass, handles, pulleys and other accessories.
2) Tool preparation: A lot of tools are still needed in the installation process of the shower room, and it is best to prepare all these tools before installation. The tools used in this installation include a tape measure, a pencil, a percussion drill, a hand hammer, an electric screwdriver, a glue gun, a manual screwdriver, a wire cutter, etc.
Before the installation of the shower room, the first thing to do is to prepare the materials and tools:
1) Material preparation: The materials used in the installation of the shower room include frames, tempered glass, handles, pulleys and other accessories.
2) Tool preparation: A lot of tools are still needed in the installation process of the shower room, and it is best to prepare all these tools before installation. The tools used in this installation include a tape measure, a pencil, a percussion drill, a hand hammer, an electric screwdriver, a glue gun, a manual screwdriver, a wire cutter, etc.
-
In the process of shower room installation, there is a process that is often overlooked, that is, the installation of the shower room stone foundation. Stone foundation is an important part of the whole shower installation process, but because the bathroom structure is different for each empty home, not everyone will install it. In order to make everyone realize the importance of the installation of the stone foundation of the shower room, the following will talk about the benefits and construction methods of dressing up blindly.
1. Advantages of stone foundation installation in the shower room:
Everyone knows that there is a lot of water in the shower room. Although there is generally a floor drain, if there is nothing to block it, the water will easily flow outside, and the shower room will lose its most basic role and cannot be used for dry and wet separation. The function of the cornerstone is to prevent water from flowing from the shower to the outside, just as the sill stone in the bathroom is one to two centimeters above the ground.
Second, the shower room stone foundation installation construction method:
There are two main construction methods for the stone foundation of the shower room. One is the same as the floor tiles, where the cement ash adheres directly to the bottom layer, i.e. the floor tiles and stone foundation are built at the same time. The difficulty of this construction method is that if the stone foundation is isolated, the joint between the floor tile and the stone foundation must also be separate, which requires relatively high construction technology for the construction master.
Therefore, some masters will use the second method to construct and reduce the trouble. That is, the floor tiles are laid first, and then the stone foundation is placed directly on the floor tiles. The advantage is that the structure is particularly simple and there is no technical content.
However, the water retention performance is not as good as the first time. If not handled properly, the water may leak.
-
Regular manufacturers will send professional masters to install the shower room, if you need to install it yourself, you need to follow the following 14-step process.
1. Confirm the environment and confirm whether the overall environment meets the installation conditions of the shower room;
2. Preparation: check whether the product packaging is in good condition, whether the accessories are complete, and prepare the tools that need to be used;
3. Basin installation: assemble the basin parts, adjust the level, and ensure that there is no water accumulation inside and at the bottom of the basin;
4. Testing: After the bottom basin is installed, it is necessary to test the water to ensure that the water is smooth;
5. Body installation: It is necessary to pay attention to the proper installation of accessories, otherwise it will affect the later use;
6. Position finding and punching: confirm the location of the punching hole and the arrangement of the upper and lower water pipes in the toilet to prevent the upper and lower water pipes from leaking when punching;
7. Install aluminum bishard: plug the expansion bolt into the hole, fix the aluminum strip on the wall with screws, and pay attention to the verticality of the aluminum;
8. Fixing glass: lock the glass of the shower room at the hole drilled in the bottom of the basin, and then slowly push it into the aluminum material against the wall, and fix it with screws;
9. Install pipe jacking: drill holes in the corresponding position above the fixed glass, install the fixing seat, connect the top repentant liquid pipe, and fix it with a bent sleeve;
10. Installing the device shelf: measuring the position and installing the device shelf, so that it is kept vertical and horizontal;
11. Install the movable door: after installing the movable door hardware, install the hinge at the reserved hole of the fixed door, and then adjust the axis position of the hinge;
12. Do waterproofing: install water retaining strips on the side and below the glass as required, and use silicone to make tight seams between the aluminum and the wall, glass and the bottom basin;
13. Debugging: check whether the use of each part is in surplus, and adjust it in time if problems are found;
14. Finishing: Wipe the entire shower room clean with a rag.
The following three points should be paid attention to: 1. In order to ensure the smoothness of the overall shower pulley, lubricant or peanut oil can be added appropriately. 2. When the pulley of the track-type shower room is loose or falling off, it is necessary to find maintenance personnel in time to adjust it to ensure that the pulley is effectively bearing the movable door, and then use a paper towel dipped in peanut oil to clean the foreign matter in the track to ensure smooth sliding; Avoid hitting the movable door too hard to avoid causing the movable door to fall off. >>>More
For people, the emergence of shower rooms has become a new trend in bathrooms. And the traditional shower method, the emergence of the shower room, has brought a new wave to people. How big is the shower in the room now? What are the relevant regulations of the relevant production unit on the specifications of the shower room? >>>More
We know that in modern times.
of the renovation. It is also very important for the decoration and design of the shower room, because it does not only affect the bathroom. >>>More
Installation method: Embed the water retaining strip in the floor tile when laying the floor tiles. >>>More
Because the glass material looks bright, it can make the overall bathroom look more spacious. And the glass is dirty and easy to clean, just rinse with water and wipe it with a cloth.