How much does it cost to install a turbo on a Seahorse Rider, please everyone, thank you

Updated on society 2024-05-28
10 answers
  1. Anonymous users2024-02-11

    Seahorse Knight belongs to the domestic car, the appearance is very beautiful, very muscular, I have recently paid a deposit to pick up the car next week, the performance has yet to be tested, after all, it is a car that has just come out. It's better not to use them for GPS, everyone can't react, so let's pretend to be yourself. If you buy a car with a loan, you will buy a full insurance, and the down payment will be more than 5w after three years, and the loan repayment will be almost 2000 per month after 36*36 If you pay in full, it will be very good, the naked car price + purchase tax is about 9500, and the insurance that suits you is about 3000 (not full insurance, all insurance should be about 5400,) + car inspection (about 500) + vehicle and vessel use tax 480, almost all work.

    Do the math for yourself.

  2. Anonymous users2024-02-10

    You can refer to the foreign supercharged version of Mazda for specific models.

  3. Anonymous users2024-02-09

    Does it make sense... I can't pass the annual inspection.

  4. Anonymous users2024-02-08

    Naturally aspirated engine modifications are not recommended for turbocharging.

    1. From the perspective of policies and regulations: if it is not approved by the traffic management department in advance, the car with the modified engine cannot pass the annual inspection normally. According to the relevant provisions of the current "Motor Vehicle Registration Regulations", the owner must apply to the vehicle authority for a change of registration to change the body color, model, performance, use and structure of a licensed motor vehicle, or to replace the frame, body or engine.

    In principle, the act of modifying the engine is not allowed.

    2. Technical point of view: for the supercharged modification of the engine, it is by no means finished with a turbine, and many supporting parts must be replaced together, and now they are basically EFI engines, so it is necessary to adjust the complex electronic control system, so it is not recommended that private cars modify turbocharging devices, and the cost of installation is much higher than directly buying turbocharged engines. Not all cars are suitable for turbocharging, such as cars with too high compression ratios or cars with poor original manufacturing processes, which are not suitable for turbocharging.

    In addition, some automatic transmission cars have been fully matched to the performance of the whole vehicle before leaving the factory, and it is best not to change these cars, because the automatic transmission is likely to be scrapped because it cannot withstand the high torque from the engine. Therefore, modifying the turbocharger without consideration, even if it can increase some power in a short period of time, is only squeezing the future life of the engine, which is very undesirable.

  5. Anonymous users2024-02-07

    Turbo: The turbocharger was first invented by Saab, a Swedish car company, inspired by the turbine engines of airplanes. It uses the exhaust gas discharged from the engine as power to increase the intake pressure of the engine (that is, to increase the density of O2 in the intake air), so as to help combustion and increase the output power of the engine.

  6. Anonymous users2024-02-06

    My home is in the northeast, and there are many small shops that make down jackets! They all buy fabrics, and they can buy their own velvet! The handling fee is 200-300 now**! The landlord said that the size of the filial piety teasing, it is estimated that Sui Shenran will also have about 100-150! Oh.

  7. Anonymous users2024-02-05

    Home improvement takes about a month and a half in total. The home renovation process can be divided into three stages: pre-stage, mid-stage, and post-stage.

    1. The early stage of decoration is mainly decoration design.

    It takes 10-15 days from the selection of the decoration company to the determination of the design plan. During this time, customers also have to choose the main materials to be used for the renovation, especially the tiles and cabinets, because the cabinets are generally custom-made and take 20-35 days to complete.

    2. The middle stage of renovation is mainly the construction period.

    Plumbers and carpenters advanced to the site construction. It takes 4 days to a week to renovate the water circuit, and it takes about 15 days for carpenters to make suspended ceilings, background walls, and cabinets made on site. After about 7 days, the renovation of the water circuit was completed, and the bricklayers began to enter the site to lay tiles, and the whole process lasted until about the 30th day.

    Around the 15th day, the carpenter finishes the work, and the oilman begins to enter the site to carry out the work of wall scraping putty leveling, carpentry and wall painting, etc., which will last until two or three days before the completion of the decoration.

    3. Later works of decoration.

    The carpenter came back to install curtain rods, hardware pendants, etc. The floors, doors, sanitary ware, cabinets, etc. ordered by the manufacturer have also begun to be installed one after another, and the ceilings of the kitchen and bathroom are also carried out, which is relatively simple and fast, and it only takes about 1 day for each type to be completed, and it takes about 3 days to complete all of them.

  8. Anonymous users2024-02-04

    1. Bathroom and kitchen chisel wall veneer brick floor tile ceiling 3 days 2, living room marble day (with baseboard) 3, bedroom 3 days (with baseboard) 3, garbage cleaning days a total of 9 days (if the materials are complete).

  9. Anonymous users2024-02-03

    My friend is in Dalian FAW-Volkswagen Engine Company. He was sure that the turbocharger would not break as long as it was clicked on. View the original post

  10. Anonymous users2024-02-02

    Internet café certificate: according to the county, 3-10w, 40 machines, within 15w! Tables and chairs are less than 250 per set! Switch 3 x 700 each!

    Router 2000 server 4000 pull fiber construction fee 1500 pay a year's fiber usage fee, which is different in various places Toll collectors are ignored. A casual house rent for home use, decoration is calculated by yourself The cost of changing the procedures of the Internet café is less than 5000 1 box of network cable is not enough 2 boxes can not be used up It is recommended to use two boxes of six types of wires about 1500 All kinds of wires, sockets, air switches, etc. need more than 1000 Air conditioners 70 need two, about 10000! More than 1,000 beautiful bars!

    5,000 yuan point card. About 1000 food and beverages Freezer 1000 There are more than 2000 display cabinets on the condition When the small Internet café is not too hot, turn on the electric fan, and install 8-10 ceiling fans according to 100 square meters If the house is not three-phase electricity, but also install three-phase electricity This 3000 Okay! After you're done with these, you'll be able to open a public security culture dot!

    The main person in charge of dotting is about 2000! Before opening, please ask about 2000 for culture and public security! That's all I have to think of!

    I should have opened 3 Internet cafes. The process is very familiar.

Related questions
13 answers2024-05-28

In 2012, General Tie launched a new tire pressure monitor, called Zhigan 700, the sensor is directly installed on the valve, no need to remove the tire, ordinary people can install it. It's very convenient. **Also affordable,**588** is only equivalent to similar products. >>>More

30 answers2024-05-28

In this case, if the chin is augmented by implanting a prosthesis. There is a possibility of rejection and deformation in the future. You are advised to consider it carefully. >>>More

8 answers2024-05-28

No way, people are professional, after all, this kind of thing is a willingness to fight and a willingness to suffer, we consumers, in this kind of monopoly industry, are indeed very disadvantaged. It's useful, and some people spend more than 1,000 to kill termites. Generally, it is calculated by the square, some are 20 yuan a square, some are more than a dozen, and different places are different, and you can also negotiate with them appropriately. >>>More

28 answers2024-05-28

The tuition fees for Guangzhou Lingkai Automobile School are: >>>More

5 answers2024-05-28

Case acceptance fees shall be paid in accordance with the following standards: (1) In property cases, according to the amount or value of the litigation claim, the following proportions shall be paid cumulatively: 1 >>>More