The water conservation programme is valid for 10 years. The service period of the water protection plan is calculated from the construction preparation period, and in principle, it shall not exceed 10 years, and the service period of the construction project plan shall end at the end of the scheme design level; The service period of the construction and production project plan should be determined in combination with the service life of the first mining area and the initial ash field.
In mountainous areas, hilly areas, wind-blown sand areas and other areas prone to soil erosion as determined by the soil and water conservation planning to carry out production and construction projects that may cause soil erosion, production and construction units shall prepare soil and water conservation programs, submitted to the people's water administrative departments at or above the county level for approval, and in accordance with the approved soil and water conservation programs, take measures to prevent and control soil erosion. If there is no ability to prepare a soil and water conservation plan, it shall be entrusted to an institution with the corresponding technical conditions.
Soil and water conservation programmes should include the scope, objectives, measures and investments for soil erosion prevention and control. After the approval of the soil and water conservation plan, if there is a major change in the location and scale of the production and construction project, the soil and water conservation plan shall be supplemented or revised and submitted to the original examination and approval authority for approval. In the course of the implementation of the soil and water conservation plan, if major changes need to be made to the soil and water conservation measures, it shall be approved by the original examination and approval authority.
Article 16 of the Soil and Water Conservation Law of the People's Republic of China Local people at all levels shall, in accordance with the soil and water conservation plan, take measures such as enclosure and protection, natural restoration, organize units and individuals to plant trees and grasses, expand the area covered by forests and grasses, conserve water sources, and prevent and mitigate soil erosion.
13th soil and water conservation planning content should include soil erosion status, soil erosion type zoning, soil erosion prevention and control objectives, tasks and measures. Soil and water conservation planning includes the overall deployment of the prevention and control of soil erosion, the protection and rational use of soil and water resources in the basin or region, and the special deployment of the special work of soil and water conservation or the prevention and control of soil erosion in specific areas according to the overall deployment. Soil and water conservation planning shall be coordinated with overall land use planning, water resources planning, urban and rural planning, and environmental protection planning.
The preparation of soil and water conservation plans shall solicit the opinions of experts and the public.
26th shall be prepared in accordance with the law of soil and water conservation program of production and construction projects, production and construction units have not prepared soil and water conservation programs or soil and water conservation programs without the approval of the competent administrative departments of water, production and construction projects shall not start construction.
-
Legal Analysis: The Water Protection Plan is effective within 10. The service period of the water protection plan shall be calculated from the beginning of the construction preparation period, and shall not exceed 10 years in principle, and the service period of the operation plan of the construction project shall end at the end of the scheme design level; The service period of the construction and production project plan should be determined in combination with the service life of the first mining area and the initial ash field.
In accordance with the relevant laws and regulations, the work of soil and water conservation implements the policy of prevention first, protection first, comprehensive planning, comprehensive management, adapting measures to local conditions, highlighting key points, scientific management, and paying attention to efficiency.
Legal basis: Article 3 of the Soil and Water Conservation Law of the People's Republic of China implements the policy of prevention first, protection first, comprehensive planning, comprehensive management, adapting measures to local conditions, highlighting key points, scientific management and paying attention to efficiency.
-
Legal Analysis: Water Protection Plan 10 is effective. The service period of the water protection plan is calculated from the construction preparation period, and in principle, it shall not exceed 10 years, and the service period of the construction project plan shall end at the end of the year of the scheme design and demolition level; The service period of the construction and production project plan should be determined in combination with the service life of the first mining area and the initial ash field.
According to the relevant laws and regulations, the soil and water conservation work implements the policy of prevention first, protection first, comprehensive planning, comprehensive nuclear and cooperative management, adapting measures to local conditions, sudden reform and hitting the key points, scientific management, and focusing on efficiency.
Legal basis: Soil and Water Conservation Law of the People's Republic of China
Article 3 Soil and water conservation work shall be carried out in accordance with the principles of prevention first, protection first, comprehensive planning, comprehensive management, adaptation to local conditions, highlighting key points, scientific management, and focusing on efficiency.
-
Legal analysis: The water protection plan is generally made before the start of the project. The water protection plan is only done once, but if the feasibility study or initial design changes greatly, and if the project scale or site selection changes, it is necessary to re-submit the water protection plan for approval.
Legal basis: Provisions on the Administration of the Preparation and Approval of the Preparation and Submission of the Soil and Water Conservation Program for the Development and Construction of the Soil and Water Conservation Project》 Article 5 The preparation and reporting of the soil and water conservation program shall be responsible for the development and construction units or individuals. The specific preparation of soil and water conservation programs of units and personnel, should have the corresponding technical ability and professional level, and by the relevant industry organization to implement management, specific management measures by the industry and the organization to formulate.
-
The water conservation plan is generally done before the start of the project. Generally, the water protection plan is only done once, but if the feasibility study or initial design changes greatly, and if the project scale or site selection changes, the water protection plan needs to be re-approved.
1. Change of EIA agency.
The procedures for changing the EIA are as follows: 1. Make an application report to the competent environmental protection bureau, and the local ** seal is required; 2. A copy of the name approval notice of the industrial and commercial bureau; 3. Copy of real estate certificate and land certificate; 4. A copy of the lease agreement; 5. Find an EIA unit to do an EIA. If the construction unit fails to submit the environmental impact report or report form of the construction project for approval in accordance with the law, or fails to re-submit for approval or re-review the environmental impact report or report form in accordance with relevant laws and regulations, and starts construction without authorization, the competent department of ecology and environment at or above the county level shall order the construction to be stopped.
2. What policies does Chengjiang County adopt in Yuxi to protect and govern Fuxian Lake?
The people of Yuxi City have set up a management agency for Fuxian Lake to implement unified protection and management of Fuxian Lake, and perform the following main responsibilities:
1) Publicize and implement relevant laws and regulations;
2) Organize the preparation of the overall plan for the protection and development and utilization of Fuxian Lake, and formulate the annual dispatch plan for the water volume of Fuxian Lake, which shall be reviewed by the people of Yuxi City and implemented after approval by the provincial people;
3) Formulate measures for the protection and management of Fuxian Lake, and implement them after being approved by the people of Yuxi City;
4) Implement the annual water intake control plan, manage the Haikou control gate and the river control gate, implement the water intake permit system in the Fuxian Lake first-class protection area, issue water intake permits, and collect water resource fees;
5) Formulate the fishery development plan and fishing control plan of Fuxian Lake, stipulate the fishing methods and net specifications, register and inspect fishing vessels, issue fishing licenses and fishing licenses, and levy fishery resource multiplication and protection fees;
6) Issuing permits for non-motorized boats to enter the lake, and being responsible for water safety management;
7) Organize scientific research on the protection, management, development and utilization of Fuxian Lake;
8) Cooperate with the competent department of environmental protection to establish a water quality monitoring and early warning system for Fuxian Lake;
9) Set up boundary tunghong piles and signs in the first-class protection area of Fuxian Lake;
10) In the Fuxian Lake first-class protection area, the exercise of some administrative punishment rights of the departments of water and lead shed, environmental protection, fishery administration, water transport and maritime affairs, etc., the implementation plan shall be drawn up by the people of Yuxi City and submitted to the provincial people for approval.
The Fuxian Lake Management Agency, which was established by the people of Yuxi City in Yanhu County, undertakes the specific work of the protection and management of Fuxian Lake in accordance with their respective responsibilities.
The validity period of the power supply plan for medium and high voltage customers is 1 year from the date of signing between the supply and consumption parties, and it will be invalid after the expiration date. Low-voltage customers do not need to develop a power supply plan.
How long is the validity period of a patent right?
Article 45 of the Patent Law stipulates that the term of a patent for invention is 20 years, and the term of a utility model patent and a design patent is 10 years, both of which are calculated from the date of application. >>>More
The validity period of the bid is calculated from the deadline for submission of bid documents. The validity period of the bid refers to the period of time for the bidder to ensure that the tenderer has enough time to complete the bid evaluation, bid awarding, contract signing and other work after the bid is opened. The termination time of the validity period of the bid is usually specified in advance in the bidding documents, and the bidder promises a time in the tender in accordance with the provisions of the bidding documents. >>>More
Performance bonds will have different validity periods depending on the contract. >>>More
The expiration date of the card refers to the expiration date by which the data card can be charged to the mobile phone. The card validity period is only applicable to the card security product. Users must recharge within the validity period, and they will not be able to recharge traffic after the expiration date. >>>More