Prior control and active control are the prerequisites for ensuring the quality of the project.
The Code for Construction Project Supervision stipulates that the formulation of supervision procedures should reflect the requirements of prior control and active control. Therefore, before construction, careful analysis and effective control of various preparatory work and various factors affecting the quality are the prerequisites for ensuring the construction quality of the project.
Prepare supervision implementation rules to guide the implementation of professional supervision.
The supervision implementation rules are under the guidance of the supervision outline and supervision planning, and the specific implementation of a professional supervision work is pertinent and highly operable technical documents. In the preparation of supervision rules, according to the supervision outline, supervision planning and professional related design documents and technical data, construction organization design, focus on the following aspects: detailed analysis of the characteristics of each different profession, the development of the corresponding supervision workflow, and for the key processes of each specialty, key parts, the development of supervision measures.
In the process of project implementation, through the further understanding of the construction site and construction drawings, and according to the engineering design changes, the supervision rules are adjusted and supplemented in a timely manner, as the basis for the implementation of supervision.
Review and confirm the qualifications of the subcontractor.
The installation project is usually contracted to a professional company in the form of subcontracting, so the supervision engineer should assist the owner to review its qualifications, and we pay attention to reviewing the terms of the construction contract related to subcontracting and the relevant provisions of national laws and regulations on project subcontracting, and confirm whether the project to be subcontracted is allowed to be subcontracted; whether the scope and location of the subcontract are correct; Whether the subcontractor has the qualifications and ability to complete the subcontracted project tasks as stipulated in the project contract.
Verify the quality management system of construction contracting enterprises.
The contractor's sound quality management system plays an important role in achieving good construction results.
-
Hello friends, the way of working of installation supervision is mainly to carry out side station supervision, thank you.
-
The main control mode of your installation supervision, that is, the installation supervision, we have to pass the equipment manual and the main control methods and methods, and we can find out his real operation through it.
-
Their control method is mainly controlled by monitoring.
-
The main control method of the dealer manager is to control it through its basic probability, and then in the process of control, its basic functional methods can be adapted to its own conditions and then slowly.
-
You said that the main control method of this installation supervision is mainly through the camera.
Natural lighting is the collection of natural light through the lighting cover, refracted and transmitted through the pipe, and the natural light is directed into the room, and the whole system can be called the light guide pipe system. >>>More
Look at the backfill thickness. The compaction check meets the design requirements.
1. Classification according to processing technology.
1. CNC machine tools for metal cutting, 2 CNC machine tools for special processing, 3 CNC machine tools for plate processing. >>>More
Hello landlord, car air conditioner will be divided into cooling or heating according to function, we generally call the heating function heater, and the refrigeration is called air conditioning. The heating warm air is made by using the principle of cooling circulation of the water tank of the vehicle itself. The refrigeration air conditioner is a vehicle-mounted refrigeration system, including compressor, evaporation tank, drying bottle, etc., and the control switch is AC switch. >>>More
The distributed computer automation management and control system (BAS) of subway environmental control (hereinafter referred to as: environmental control system) is an automatic control system based on the theory of modern computer and network technology combined with mechanical and electrical equipment automation control principle, and the control object of the system is mainly subway ventilation and air conditioning equipment, water supply and drainage equipment, normal lighting equipment and escalator equipment. Its main features: for such a large-scale and very important underground facilities of the subway, its environmental conditions and the air above ground are relatively closed, and the passenger flow is very concentrated, if there is no complete and reliable automatic control system to monitor and control the environmental quality in the subway on such an important occasion, so that it can meet the requirements of passenger comfort under normal circumstances, and provide correct and reliable information to ensure the safety of passengers in an emergency, the consequences will be very serious. >>>More