What are the precautions in the process of product quality appraisal of environmental protection equ

Updated on Financial 2024-06-16
24 answers
  1. Anonymous users2024-02-12

    1: Equipment acceptance steps and precautions 1. Appearance inspection 1Take photos and records of the equipment and the outer packaging, check whether the outer packaging of the equipment is in good condition, whether there is damage, wetting, moisture, deformation, etc., and check the surface and packaging status of the outer packaging box; 2.

    Check whether the surface of the equipment and accessories is damaged, rusted, bruised, etc., focusing on the main engine, main accessories and main working surface; 3.If it is found that the packaging is damaged, the equipment and accessories are damaged, rusted, signs of use, etc., a detailed record should be made, and the focus should be on taking photos and leaving receipts, and the return and compensation procedures should be handled with the first merchant in a timely manner. Second, the quantitative perturbation test 1

    The quantity check should be based on the supply contract and packing list.

    Based on this, check the specifications, models, configurations and quantities of equipment such as hosts and accessories, and check and check them one by one; 2.Carefully check whether the random information is complete, such as manuals, product inspection certificates, warranties, etc., and the relevant technical information of the computer should include drivers.

    and other software; 3.Pay attention to check the serial number and factory number of the equipment, and check online if necessary; 4.Carefully make a record of unpacking and inventory, indicating the location, time, participants, box number, product name, should arrive and actual quantity, such as shortages, wrong delivery and other problems, to make a record in time and keep relevant materials.

    Third, quality inspection 1Before the equipment is powered on for testing, the connected power supply should be checked to ensure that it is consistent with the power supply requirements of the equipment; 2.The equipment should be able to start normally, there should be no fault error information during operation, and the equipment should be tested for at least 48 hours of uninterrupted power-up; 3.

    It is necessary to install and debug in strict accordance with the terms of the contract, the instruction manual, and the provisions and procedures of the user digging manual; 4.Check whether the technical indicators and hardware configuration of the equipment meet the requirements according to the product manual; 5.The equipment should be carefully recorded during the trial operation and acceptance.

    If there is a quality problem with the equipment, the supplier and the responsible procurement unit shall be notified in writing of the details. Fourth, fill in the acceptance record form If the appearance acceptance, quantity acceptance, and quality acceptance are completed, if any one of them does not meet the requirements of the contract documents, it must be recognized (signed, sealed) by the representative of the supplierIf the instrument and equipment have been tested and its configuration and performance meet the requirements of the indicators specified in the contract, the equipment unpacking inventory record form and the equipment power-up test record form should be filled in as part of the equipment acceptance documents.

  2. Anonymous users2024-02-11

    1.The equipment acceptance work shall be carried out by the licensee of the completion of the work ticket, and the relevant technical personnel shall provide technical guidance for the acceptance of the operation class.

    2.The acceptance of equipment shall be carried out in accordance with the relevant regulations, technical standards and on-site procedures issued by the ministry. The following work should be carried out when accepting the equipment:

    Carefully read the maintenance records, preventive test records or secondary circuit work records, find out the content recorded, and ask the person in charge to fill in clearly if there is any ambiguity; If there is no brief or minor repair report for the time being, the person in charge should be required to write down the main contents and conclusions of the report in the record, and indicate the time limit for submitting the supplementary report; On-site inspection and verification of the repair project has been completed, and the repaired defects have been eliminated; Supervise the person in charge of the work to eliminate defects.

    3.Installation or maintenance of equipment. In the construction process, when intermediate acceptance is required, it shall be carried out by the on-duty operation team leader designated by the on-time duty personnel.

    The intermediate acceptance should also fill in the relevant repair, test, school collapse records, the person in charge of the work, the operation squad leader on the relevant records. After the equipment is repaired, pre-tested, relay protection, automatic devices, and instrument inspections, the relevant repair and test personnel will record the repair, test, and calibration situation in the relevant record book, and indicate whether it can be put into operation, and the completion procedures can only be handled after no doubt.

    4.When the individual items of the accepted equipment do not meet the acceptance standards, and the system needs to be put into operation urgently, it needs to be approved by the superior chief engineer.

  3. Anonymous users2024-02-10

    Matters needing attention for equipment acceptance:

    Whether the material used is sensitive and meets the requirements, whether the material is the agreed material, whether the thickness is enough, and whether the size and volume are enough. The electrical is not the specified model, the power is right, and it is not explosion-proof. The weld is not flat and meets the requirements.

    Is there a pressure vessel certificate? Mainly these bridges refer to the aspect.

  4. Anonymous users2024-02-09

    Appearance inspection: The bridge belt takes pictures and records of the equipment and the outer packaging, checks whether the outer packaging of the rental and brightening equipment is in good condition, whether the defects are damaged, wet, damp, deformed, etc., and the surface and packaging status of the outer packaging box are checked.

  5. Anonymous users2024-02-08

    Equipment acceptance precautions include:

    1. First of all, it is necessary to check whether the quality of the equipment is qualified.

    2. Check whether the cloth wheel of the equipment is reasonable, whether it is designed and installed in accordance with the contract.

    3. Whether the whole set of assembly line lacks zero pure parts.

    4. Open the equipment to check whether the production efficiency of the equipment is up to standard.

  6. Anonymous users2024-02-07

    1 Ultrasonic level gauge.

    Instruments and equipment do not need to be calibrated. If there is an abnormality, you can check the flatness of the camera installation, the spacing of the spacing side wall, the abnormal support point, the slow secondary connection, the output signal of the remote control signal is appropriate, and the main parameters are appropriate.

    7 kinds of environmental protection equipment maintenance skills that the master doesn't know.

    The maintenance scheme is as follows:

    The inspection of the composite glass measuring electrode is generally once every 3 months with self-flushing, and once a month without self-flushing, mainly to check whether the composite glass measuring electrode is damaged and whether the measurement is invalid. In your application, to prevent common failures of the electrode, immerse the top of the head of the electrode in liquid from start to finish.

    Wash the nozzle to ensure that the pH meter remains clean at all times during normal measurements. Inspection, flush testing can be carried out during commissioning.

    Check the credibility of the intermediate connection between the camera mounting support frame and the immersion maintenance pipe, and check whether there is any water leakage, so that it is not possible to detect the liquid entering the maintenance pipe according to the level or electrode support frame, and then endanger all normal applications of the instrument and equipment.

    Calibration: The pH meter must be calibrated at two points to determine the measurement slope before it is officially put into operation. This shows that these two standard low-speed battery charging solutions must be available before calibration, and ensures the accuracy of the calibration.

    7 kinds of environmental protection equipment maintenance skills that the master doesn't know.

    3 Turbidity meter.

    It is generally used for water seepage and wastewater clarity detection in sewage treatment stations, the principle of accurate measurement of invisible light for water seepage turbidity meter, and the principle of light transmission for water turbidity meter. The actual maintenance plan includes:

    The sensor should be inspected once a month, and care should be taken to prevent damage to the mirror glass on the sensor surface during the whole inspection process.

    Check the connection between the controller camera and the bubble maintenance tube.

    Check the adhesion between the clamp and the support frame used to install the blister maintenance pipe.

    Check the wiring of the probe and the signal of the secondary meter.

    Inspection of the meter and external wiring.

    Check the type and voltage level of the power supply of the instrument.

    Whether the probe needs to be cleaned.

    Parameter setting. The gauge unit is set to NTU, and the range range for inlet water is 0 3000 and the range for outlet water is 0 100. The meter output signal is 4 20mA.

    7 kinds of environmental protection equipment maintenance skills that the master doesn't know.

    **Dissolved oxygen meter is used in the sewage plant, and is generally used in the biochemical tank, which is distributed in the aerobic section or anoxic section respectively to monitor the changes of dissolved oxygen in different regions. The specific maintenance plan is as follows:

    The sensor should verify the measured value once a month.

    Check the mounting bracket and float connecting rod to check whether the installation connection is firm.

    The probe electrodes have good contact with the two poles of the transmitter, and at the same time, the measured solution should not enter the two electrodes, so as to avoid signal short circuits. In addition, the probe clamping screw head should be rotated in place to avoid being vibrated by flowing water during use.

    Whether the signal core connection between the transmitter and the secondary display instrument is correct, according to the technical information provided by the manufacturer, carefully check one by one.

    Secondary Display.

  7. Anonymous users2024-02-06

    What are the precautions for the installation and maintenance of environmental protection equipment?

    Exhaust gas treatment source and environmental protection.

    When arranging the workshop, the possibility of installation, overhaul and dismantling of the equipment must be taken into account. The ways and means of installation, maintenance and dismantling of equipment must be considered.

    Consideration must be given to how the equipment will be transported in or out of the workshop. When the equipment is transported in or out a large number of times, it is advisable to set up a gate. Generally, the width of the door of the plant is about larger than the width of the equipment that needs to pass through.

    However, when the equipment is transported into the plant and rarely needs to be moved out as a whole, the installation hole can be set up, that is, the hole is reserved in the outer wall, and the equipment is transported in, and then sealed.

    When the equipment passes through the floor or is installed on the second floor or higher, mounting holes can be provided in the floor slab. The mounting hole can be set up with or without a cover, if there is no cover, a detachable railing should be set around the hole. Generally, the equipment that is relatively fixed can also be equipped with an installation hole on the outer wall of the floor, and the equipment can be transported through the installation hole on the outdoor hanging.

    There should be a certain area and space in the plant for equipment maintenance and disassembly, the centralized arrangement of similar equipment can be uniformly set aside for maintenance sites, the manholes of tower and vertical equipment should be empty or maintenance channels, and try to be arranged in the same direction, and the tubular heat exchanger should be set aside at the detachable end in order to extract the pipe for maintenance, especially should prevent the manhole, instrument nozzle and other nozzles from touching the beam.

    When the number of equipment in the workshop is large and the weight is large, it is necessary to consider setting up the lifting and transportation height of the lifting and transportation equipment for disassembly and maintenance, which should be greater than the highest equipment height on the transportation line.

    Fourth, meet the requirements of the building.

    All very bulky equipment, or equipment that can produce great vibration during operation, such as compressors, centrifuges, large general machines, crushers, etc., should be arranged at the bottom of the plant as much as possible, and the weight of the equipment foundation should not be less than 3 times the weight of the equipment to reduce the load and vibration of the plant. The party must be laid out in.

    In the second and third floors, it should be placed on the upper side of the beam.

    For machinery with severe vibration, the operating table and foundation should not be connected with the columns and walls of the building, so as not to affect the safety of the building.

    When arranging the equipment, the position of the columns, main beams and secondary beams of the building should be taken into account, and the columns and main beams must be avoided, and the main beams must be avoided if there is no perforation.

    All the operating platforms in the plant must be considered in a unified way to avoid the scattered repetition of the platform pillars, save the area occupied by the structure in the plant, and achieve a more reasonable organization of operations and traffic routes.

    The entrances and exits of the plant, traffic roads, and stairs should be carefully arranged. Generally, the width of the door of the plant is larger than the width of the fully loaded equipment.

  8. Anonymous users2024-02-05

    The maintenance of environmental protection equipment, now buy equipment have after-sales individuals, you can find the manufacturer's after-sales personnel, they can help you repair for free, but the premise is that this equipment has an after-sales period, beyond the deadline, then you have to spend money, as if if you do not exceed the deadline, as long as it is within this period, the bad participation can be repaired for free.

  9. Anonymous users2024-02-04

    As for the environmental protection equipment, it is a maintenance problem, this meeting manual, the manual has, such as the maintenance and refueling, or lubrication and the like need to be paid attention to.

  10. Anonymous users2024-02-03

    Maintenance of environmental protection equipment, he will definitely have a warranty period, if your equipment has a problem at the right time, you can repair it to find the above ** contact professional people to come.

  11. Anonymous users2024-02-02

    Report the maintenance of equipment, like other equipment, are to be regularly maintained, regular maintenance, environmental protection equipment is no exception, every year to carry out regular repair and, maintenance.

  12. Anonymous users2024-02-01

    environmental protection equipment. Maintenance issues. Environmental protection equipment. To be carefully maintained, it has it all inside. Safety Operating Procedures. The essentials must be implemented conscientiously. There is no problem.

  13. Anonymous users2024-01-31

    There have always been problems in the maintenance of sanitation equipment in the environmental sanitation industry, which to a certain extent also restricts the further improvement of the urban environment.

  14. Anonymous users2024-01-30

    If this equipment is repaired, because the quality of this protection has a certain period, it is said that you can carry out the repair of an environmental protection equipment during this warranty period.

  15. Anonymous users2024-01-29

    If there is a quality problem with the environmental protection equipment, you still have to find the manufacturer to repair it, and the general personnel still can't do it if they say that they have done this maintenance.

  16. Anonymous users2024-01-28

    Maintenance and protection of environmental protection equipmentYou can analyze the quality of environmental protection equipment and improve its quality level at the same time.

  17. Anonymous users2024-01-27

    This kind of equipment is definitely more troublesome in the process of maintenance without maintenance, and this kind of equipment generally needs to be maintained frequently.

  18. Anonymous users2024-01-26

    Equipment generally has a maintenance period, be sure to agree with the manufacturer on the maintenance time, if there is a problem, communicate in time.

  19. Anonymous users2024-01-25

    The maintenance of environmental protection equipment must be carried out in a timely manner, such as machinery, engine oil, etc.

  20. Anonymous users2024-01-24

    Maintenance of environmental protection equipment. The maintenance of environmental protection equipment is a big problem, which requires annual maintenance and maintenance.

  21. Anonymous users2024-01-23

    Now the maintenance status of environmental protection equipment is relatively perfect, and its after-sales service is relatively good.

  22. Anonymous users2024-01-22

    If you have a problem with the maintenance of environmental protection equipment, you can negotiate with the manufacturer, and if there is a problem, you can find the manufacturer.

  23. Anonymous users2024-01-21

    The repair and maintenance of environmental protection equipment is provided by the installation company or equipment manufacturer.

  24. Anonymous users2024-01-20

    The maintenance problem of environmental protection design, if the environmental protection equipment fails, is it necessary to protect and maintain? Ensure the normal operation of environmental protection machinery.

Related questions
3 answers2024-06-16

Quality experience.

People-oriented, quality as the foundation, the enterprise building is flat! Quality is as important to an enterprise as health is to human life, it is the soul of enterprise development and the core of competition, which is related to the profitability and development of an enterprise, and even its survival; As the so-called quality reflects quality, quality determines quality, quality determines survival! >>>More

13 answers2024-06-16

Quality certification, also known as conformity assessment, is an effective method for managing the quality and quantity of products in the world. Quality certification is divided into two categories: product quality certification and quality system certification according to the certification object; According to the role of certification, it can be divided into safety certification and conformity certification. >>>More

8 answers2024-06-16

It is recommended to use professional trademark management software to manage all trademarks under the name of the enterprise in a unified manner, so as to check the information and latest status of the trademark at any time and track the progress of trademark examination; Set up similar trademark announcement monitoring and infringement monitoring, and promptly raise objections to the trademarks plagiarized or free-ridden by others, invalidation, and revocation; Classified and stored all kinds of trademark-related documents (e.g., registration certificates, litigation judgments, license contracts, evidence of use, infringement clues); Remind the relevant limits to avoid delays in official limits and invalidation of trademarks; Enterprises can manage the brand trademarks under their names at different levels, such as general trademarks, product trademarks, and defensive trademarks, allocate resources according to different levels, determine the scope of layout, and maintain the period; Use visual charts in the software to show the layout of the logo, etc.

12 answers2024-06-16

1. Is the color difference a quality problem?

This question has to be divided into two parts. The color difference of one side sports wood floor is a natural phenomenon. Why do you say that, because the main raw material for the production of sports wood flooring is solid wood raw materials. >>>More

9 answers2024-06-16

Legal analysis: The standard provides for the determination of nickel content in ferronickel by EDTA titration. This standard applies to the determination of nickel content in ferronickel. Measurement range (mass fraction): . >>>More