Why should the hydropower wiring be slotted, and whether the hydropower decoration should be slotted

Updated on home 2024-06-19
10 answers
  1. Anonymous users2024-02-12

    The wall must be slotted, and the main concern is on the ground, and many of us don't know whether the ground should be slotted or not.

    In fact, if the ground is slotted, the line pipe is laid in the groove, so that the workers will not step on the line pipe when they are working in the room, walking around, and can better protect the line pipe. If it is not slotted, the worker may step on the conduit, and if the conduit is flattened, the conduit will have to be replaced. And some workers are lazy and haven't changed yet, which brings certain safety hazards to their future lives.

    In addition, slotting is also more conducive to pipe routing, because the pipe is in the groove, will not move at will, and the wiring is more convenient.

    Second, the conditions that should be met for slotting.

    Some people may say that the slotting will destroy the building structure of the ground, or the roof of the downstairs will be broken, in fact, the slotting needs to have certain conditions, that is, the ground has a protective layer, if the ground does not have a protective layer, it can not be slotted.

    <>3. What should be paid attention to if the ground cannot be grooved?

    If the ground can not be slotted, it is necessary to pay attention to avoid the construction workers stepping on the line pipe, then usually in some families, the master will seal the line pipe with cement in some key places, so that on the one hand, the line pipe is fixed, and the line pipe will not move; In addition, it can also prevent construction workers from accidentally stepping on the line pipe during construction.

    Fourth, the difference between ground slotting and non-slotting.

    In addition to the difference in the protection of the line pipe, there is also the difference in the height of the ground floor.

    If it is not slotted, the conduit needs to be laid on the ground, and it needs to be sealed with cement in the later stage, so relatively speaking, the height of the ground will be slightly raised.

    5. Precautions for slotting.

    The depth of the groove should be appropriate, and it needs to be able to bury the conduit just right; In addition, the width should be appropriate;

    In addition, it is best to be as neat as the above, and not to make potholes in the slots;

    It is best not to open too long transverse grooves on the wall, many people think that it is okay to open transverse grooves, but this is bound to have a certain negative impact on the building structure, if necessary, try not to open too long.

  2. Anonymous users2024-02-11

    Take a look at the precautions for slotting in the renovation of water and electricity.

  3. Anonymous users2024-02-10

    There are various sayings about whether to slotted water and electricity decoration, which is nothing more than slotting beautifully, not losing the floor height and stuffiness, increasing the service life of the pipeline, etc., but the slotting may damage the stressed structure of the floor slab, or the tile will be hollowed after paving.

    1. Will the slotting of water and electricity decoration affect the load-bearing structure of the house?

    Many people are entangled in the water and electricity decoration whether to groove in the end, and the problems of ground slotting are as follows:

    1) Worry about affecting the load-bearing structure of the house;

    2) Slotting will increase the construction cost.

    Generally speaking, there is a screed layer on top of the floor slab or reinforced concrete structure, and the slots are opened in this layer, so there is basically no impact on the load-bearing structure of the house.

    2. Why should the water and electricity decoration be slotted?

    1) Slotting can protect the water pipe from being damaged during the construction process after installation;

    2) The slotting is convenient for future construction, and the probability of hollowing is reduced when the tile is paved, and the smoothness of the ground is ensured; Ants slap hoops.

    3) Construction specifications, where strong and weak electricity intersect, there is no need to worry about signal interference;

    4) Save the floor height, reduce the waste of the floor height, and ensure the aesthetics of the interior;

    5) The slotting is convenient for the fixing of the pipeline, and even if the floor tiles are damaged in the future, it will not affect the pipeline.

    When decorating water and electricity, the standards of different decoration companies are different, and in the case of sufficient budget, do not save money for slotting.

  4. Anonymous users2024-02-09

    1.The ground is covered with composite flooring (the floor mat treasure is not paved below or the floor mat treasure below 2 cm) The ground is slotted, and the groove after the pipe is lined up should be flattened with cement powder, which is convenient for the later floor laying.

    2.The floor is covered with laminate flooring (paved with 3 cm or more than the state mat), and the floor can be slotted without slotting.

    3.The floor is covered with solid wood floors or multi-layer boards (the ground is equipped with wooden keels), and the floor can be ungrooved.

    4.The floor is paved with tiles, and the floor can not be slotted.

    5.The wall covering, latex paint, and the wall must be slotted.

    6.The wall is tiled, and the wall must be slotted.

    7.There is a ceiling line pipe on the top surface, and there is no need to slot it in the roof directly.

    8.There is no ceiling on the top surface, and the top surface can not be slotted, and the top surface cannot be PVC pipe. You can wrap the wire with adhesive tape or go directly to the top with a sheath wire.

  5. Anonymous users2024-02-08

    1. It depends on whether you use solid wood flooring or laminate flooring.

    2. If the solid wood floor is used, the wooden keel is to be installed, then there is no need to groove in the ground, just walk in the wooden keel under the floor.

    3. If the composite floor is used, then the slotting depth of the ground should be 30mm, (note: it must be a cast-in-place concrete floor, and it must be a leveled ground with cement sand, if it is a flat ground that has not been found with cement mortar, it must not be slotted, because that will destroy the safety of the ground structure). The use of 20mm PVC pipe is better, the flame retardant is a little worse, but not rusty, if the galvanized pipe is used, it will rust and corrode for a long time, and the iron oxide produced will react with the plastic of the wire and heat up and age, which will affect the long-term electricity safety.

    4. After slotting, the dust in the tank must be cleaned before burying the pipe. Then, the embedded pipe is sealed with a grade of cement mortar that is one grade higher than the original ground.

  6. Anonymous users2024-02-07

    If you use composite flooring, the slotting is about 2cm---3cm, and the cement and sand are repaired on it, and the slotting will not affect the ground structure. If you use floor tiles or solid wood, you don't need to.

  7. Anonymous users2024-02-06

    Just lay it on the ground, because the floor has to be caged, so there is no need to worry.

  8. Anonymous users2024-02-05

    Now it's all ground slotted and dark lines.

  9. Anonymous users2024-02-04

    Generally, the new house is made of hidden pipes, all of which need to be slotted, otherwise you have to do open pipes, which is not beautiful, but you must do a good job of dark pipes, and the hidden projects of water and electricity are major events, so you must find reliable people, if you need to, feel free to find me (Beijing and Tianjin area).

  10. Anonymous users2024-02-03

    Decoration is a huge and trivial project, whether it is as large as the floor, the customization of furniture or the purchase of a few screws, go through the construction procedures; From organizing the coordination of multiple types of work such as water and electricity, carpentry, etc., the owners themselves need to use their wisdom to integrate.

Related questions
6 answers2024-06-19

List of home improvement hydropower materials 2, auxiliary materials: wire pipe, tee, cassette, elbow spring, box joint lock, box joint lock, straight head, waterproof insulating tape, waterproof tape, broadband TV point. >>>More

10 answers2024-06-19

There are thousands, tens of thousands of yuan, and tens or hundreds of thousands of yuan, depending on the area and material.

4 answers2024-06-19

Hydropower is a relatively large part of the profit of the double repair company, and it is common to exceed the budget. >>>More

9 answers2024-06-19

Finding the right plumber, carpenter, and renovation company is an important step in the process of home renovation. First of all, you can find these workers through the recommendations of friends and family, whose experience may provide you with a good reference. Secondly, you can also find local renovation companies and workers through online platforms, such as home improvement**, community forums, etc., which usually have user reviews and feedback on these platforms, which can help you understand their work quality and service attitude. >>>More

13 answers2024-06-19

When we decorate the house, we need to pay attention to the following points1. The waterway of the kitchen mainly includes water heaters, etc., which is generally a water heater shared at home, so it is necessary to think well when the waterway is renovated, where to put the water heater, so as to ensure that the hot and cold water pipes can go to the bathroom. In order to install the hot water pipe, the floor drain and sewer should also be handled very well, otherwise there will be a phenomenon of backwater, the distance of the water meter should be installed appropriately and conveniently, and the water inlet of the maintenance toilet should not block the view, so that its location can be determined according to its model. <> >>>More