What should I pay attention to in house decoration and water and electricity renovation?

Updated on home 2024-06-05
13 answers
  1. Anonymous users2024-02-11

    When we decorate the house, we need to pay attention to the following points1. The waterway of the kitchen mainly includes water heaters, etc., which is generally a water heater shared at home, so it is necessary to think well when the waterway is renovated, where to put the water heater, so as to ensure that the hot and cold water pipes can go to the bathroom. In order to install the hot water pipe, the floor drain and sewer should also be handled very well, otherwise there will be a phenomenon of backwater, the distance of the water meter should be installed appropriately and conveniently, and the water inlet of the maintenance toilet should not block the view, so that its location can be determined according to its model. <>

    2. The circuit transformation of the living room, when the living room is installed with electricity, including a lot of wires, such as computer cables, ** lines, TV lines, etc., the location of many wires must be considered, and the preparation for reservation is made, generally the wires will be extended to the sofa, leaving a water dispenser humidifier at the door, etc., these must be prepared for the power port, generally put five power outlets in the living room, the plug of the air conditioner can be seen everywhere, it is best in the standby state, if there is a switch of the plug board, In this way, there is no need to turn off the switch back and forth, preventing wasting electricity. <>

    3. Bedroom circuit transformation, bedroom circuit transformation also includes many wires such as power cords, air conditioning wires, etc., a wire should be left on the bedside table, and it is better to use a five-hole plug-in board switch, which can reduce the trouble of turning off the lights, and will not get out of bed when the lights are turned off, so that it is very convenient, and a plug-in port should also be left on the dresser, so that it is convenient to use a hair dryer. There should also be a reflector on the dresser, so that there is enough light to take care of when applying makeup, and a switch should be added next to the wire box, and it is best to use a double control switch in the bedroom, one in the bedroom and one on the head of the bed, so that it is very easy to operate, and there is no need to get up to turn off the light. <>

    4. Kitchen and bathroom circuit transformation, more electrical appliances used in the kitchen When the circuit is transformed, we must determine which electrical appliances are needed in the kitchen, put the location in the first place, reserve the interface of the wire, will not cause inconvenience in the future, the bathroom only needs to have lighting fixtures, we must consider these projects when looking at the workers to install during the construction, there will be no problems with water and electricity, after the installation of the waterway, we must carry out the water test, so as not to leak.

  2. Anonymous users2024-02-10

    The matters to be paid attention to in the renovation of houses and water and electricity are: the water pipes should be used as far as possible along the wall, and the material of the PPR pipe should be used. The red line is the hot water pipe, and the blue line is the cold water pipe. The height of the switch socket in the same room should be consistent.

    Strong and weak electricity needs to be slotted separately, and the top can not go before considering the wall, and the wall can not go before considering the ground.

  3. Anonymous users2024-02-09

    Attention should be paid to hydropower retrofitting. Whether the line is smooth or not. Whether there is any crossing, etc. Can security be achieved?

  4. Anonymous users2024-02-08

    Pay attention to the horizontal and vertical, it is not easy to break the pipeline when installing in the future, and the pressure test must be done after the installation is completed. The wire must be threaded through the pipeline, and there must be no joints in the pipe.

  5. Anonymous users2024-02-07

    Based on personal experience, let's talk about the problems that need to be paid attention to in hydropower renovation for reference.

    Water and gas: 1. The pipe wiring must be reasonable and try to avoid twists and turns.

    2. The safety valve and the gauge dial are installed in a spacious, ventilated and easy-to-operate place.

    3. Do not go to dark, humid and other places that are prone to corrosive substances to avoid air leakage after the tube is corroded; Try to go to a ventilated place to avoid serious consequences after air leakage.

    4. The length of the pipe between the water point and the water heater should be as short as possible, so that when hot water is needed, the hot water can be put into it faster, and the waste can also be reduced.

    5. In addition to the water in the kitchen, bathroom, and laundry room, if necessary, try to consider whether you will raise flowers and fish in the future, and reserve the water position in advance to avoid the trouble of transformation in the future.

    6. The air conditioning outlet can be arranged with pipes in the wall and directly connected to the drainage pipe, which can avoid affecting the appearance.

    7. The water pipe (especially the thinner water pipe outside the house) should be fixed well, so as to avoid shaking when the water pressure is unstable, sometimes it will make a bad sound, and sometimes the fixture will even fall off.

    8. Pay attention not to install the direction of hot and cold water, generally left hot and right cold. Although it is also used in the same way, if it is inconsistent between home and outside, it may cause you to be unaccustomed to it, either burning your hands at home or burning your hands outside.

    Circuit: 1. The wiring should be reasonable, avoid twists and turns, and try to avoid the location of objects that may be installed. Note that the water pipes go underground, and the wires go head.

    2. For the power cord that will use high-power equipment, it is best to use a special line, such as water heaters, high-power air conditioners, etc., it is best to use a special line.

    3. The power supply position of the kitchen, bathroom and other functional rooms should be arranged as much as possible, especially in the kitchen, as much as possible, so as not to be insufficient in the future. If you pull the power strip in the future, it will not only affect the appearance, but also be unsafe.

    4. It is advisable to choose 2+3 sockets for power sockets, and pay attention to the sufficient position between the two sockets, so that 2 electrical appliances can be plugged in at the same time. Nowadays, many sockets are plugged into one plug and there is no place to plug in the other.

    5. Keep the kitchen power supply away from water and steam as much as possible.

    6. As long as the lighting is sufficient, the switch position should not be installed more, and many of the houses are not used if they are not mansions.

    Finally, you must remember to let the decoration company draw the actual wiring diagram and keep a copy for yourself, so as not to do anything in the future and not know how the wiring in your home is arranged.

  6. Anonymous users2024-02-06

    It should be noted that the renovation worker should first contact the property of the house and pay attention to the water pipes.

  7. Anonymous users2024-02-05

    Be sure to communicate well with the renovation plumber workers of your home, and it is best to tell you the route of the line and the approximate cost after construction in advance, so as not to be fooled... In order to avoid winding, it is best to take a look at the concealed project by yourself to avoid future troubles.

  8. Anonymous users2024-02-04

    It would be best if you could find a more professional hydropower renovation team. The key is that hydropower renovation must have a budget, and it can't be said after it's done! The budget and final accounts cannot exceed 10 per cent.

    If you control it like this, there will be basically no trouble in settlement. There are a lot of things to talk about in terms of materials and construction, and it is very important for the layman to find a good team.

  9. Anonymous users2024-02-03

    Hydropower renovation is a hidden project in decoration, which is directly related to the comfort and safety performance of future living. If there is a problem after the house is decorated, it will take great pains to repair, and it will cause a lot of inconvenience to home life, so the decoration owners must pay special attention to the water and electricity transformation when carrying out the home appliance project, and supervise the workers to build carefully. There are the following aspects that need to be paid attention to in the transformation of waterways:

    One. The waterway renovation of the kitchen mainly includes the faucet and the water heater, and the general family is that the kitchen and the bathroom share a water heater, so when carrying out the waterway transformation, we must think about the location of the water heater installation, so as to determine the location of the installation of the hot and cold water pipes and carry out the waterway transformation. Two.

    There are many contents of bathroom waterway transformation, the installation location of washbasins, toilets, bathtubs and washing machines, whether hot water pipes are needed, and the sewer treatment of floor drains must be in place, otherwise it will cause backwater in the future. 3. Circuit transformation of the living room The wires and lines that need to be installed in the living room include power lines, lighting lines, air conditioning lines, TV lines, ** lines, computer cables, doorbell lines, etc. The location of the wire needs to be considered in advance, do a good job of reservation, generally speaking, on the edge of the sofa to leave the first line mouth, in the door to leave the doorbell line mouth, water dispenser, humidifier and other equipment reserved power port, in general, the living room should leave at least 5 power cord ports.

    Fourth, bedroom circuit renovation Bedroom circuit transformation generally includes power cords, lighting wires, air conditioning wires, ** lines and computer lines. Reserve the power cord port above the bedside table, and use a 5-hole plug-in board with a switch, which can reduce the trouble of the bedside lamp not switching. The power supply terminal (hair dryer) should be reserved above the dresser; In addition, consider that there should be a reflector above the vanity mirror, and install a switch next to the wire box; It is best to use double control switches for bedroom lamps, one is installed on the outside of the bedroom door, and the other switch is installed on the upper side of the bedside table or the easier to operate part of the bedside, so that you don't have to get up to close the bedroom door when you sleep at night.

    As long as these projects are considered in advance, and the workers are strictly supervised to operate in accordance with the standard steps during construction, there will generally be no problems in hydropower transformation. Hydropower renovation is one of the important links in home decoration, once there is a large hidden danger loss is relatively large, and the maintenance is often more destructive. So we must pay attention to it to avoid causing damage in the future!

  10. Anonymous users2024-02-02

    Large items are determined in advance.

    It is necessary to determine the brand and specific model in advance, including shower room, bathtub, water heater, small kitchen, toilet, ceiling hood, air conditioner, etc. Among them, shower rooms with steam function and instantaneous water heaters, and air conditioners above 26 generally need 16A sockets, and instantaneous water heaters must be wired separately from the distribution box, and wires with a cross-section of more than 4 square millimeters are used to avoid frequent tripping or overheating accidents.

    Go to the top and not the ground.

    If the waterway goes to the ground, it is not easy to find the problem, because the water is flowing to a low place, and the leaking place does not necessarily flow out of the water first, only when the water leaks downstairs or overflows the gold mountain, the leakage will be found, and because it is a hidden pipe, it is impossible to find the leakage place immediately, and the ground can only be planed open, so the loss will be considerable. Circuit routing is exempt from this restriction because the wires are pipe-threaded, and even if there is a problem, the wire can be pulled out for maintenance.

    Hydropower renovation is the top priority in home renovation, because most of the pipelines are buried in the dark, and it will be very troublesome to have problems or want to change them after the renovation is completed. Therefore, hydropower transformation should not only ensure quality, but also fully consider the needs of use.

  11. Anonymous users2024-02-01

    I suggest that you better find someone to renovate, if you change it yourself, it will be more troublesome and it will not be good The water is better If the electricity is not good, it is not safe After all, there are no professional tools.

  12. Anonymous users2024-01-31

    Hydropower renovation is a hidden project in the decoration, and it is also the most important part of the decoration! If the quality of hydropower renovation is not up to standard, it will cause great trouble to our lives! If there is a problem after the house is renovated, it will take a lot of effort to repair, and it will cause a lot of inconvenience to home life, so we must pay special attention to the renovation of water and electricity when carrying out household appliance projects, and supervise the workers to construct carefully.

    Precautions for hydropower renovation of new house decoration: 1. Shielded cables should be used for weak current, and the secondary decoration line layout needs to be re-slotted wiring, most of the strong and weak currents can only be piped from the ground, and it is very common for strong and weak current pipes to cross and be parallel in close proximity. If the weak current uses unshielded cables, it may cause signal interference.

    2. The design principle of circuit wiring grasps the principle of "the shortest distance between the two ends", does not deliberately wind, and maintains a relative degree of "live wire" 3. In principle, if the strong electric pipe provided by the developer is a PVC pipe, it is advisable to use a PVC pipe during the secondary hydropower transformation, and it is not appropriate to use a JDG pipe (socket a tight galvanized steel conduit), otherwise it is difficult to realize the overall grounding connection, which will leave future troubles. If the strong electric tube provided by the original developer is a JDG tube itself, both pipes can be used. 4. Hydropower design needs to grasp whether the water circuit transformation design scheme required by itself matches the actual hydropower system (especially for second-hand houses, which will be explained below), such as if the new residential building uses instantaneous electric water heaters, air conditioners and other electrical appliances with particularly high power, it is necessary to consider a new route from the distribution box for use.

    5. Kitchen water and electricity design needs cabinet design drawings to cooperate with safety assessment 6. When designing water and electricity, we must master the size and characteristics of furniture, electrical equipment in the kitchen, bathroom and other functional rooms, so as to make accurate positioning of the hydropower transformation plan. 7. The functional reference configuration of ordinary residential water and electricity design equipment, taking the ordinary configuration of three bedrooms, one living room, one bathroom and one kitchen as an example, and so on for large apartments. The above is the sharing of 7 precautions for hydropower transformation, I hope it will have a certain reference role for you!

    In addition, when decorating, it is recommended to visit the building materials market more and understand the decoration materials, which is very important for the owners who use half or clear package repairs! I wish you a smooth renovation and a speedy move into your new home! If you are satisfied, please give it a thumbs up!

  13. Anonymous users2024-01-30

    Because the developers are not so thoughtful for you to think about, every place is the same as you imagined. Therefore, the owners need to change the water and electricity themselves.

    As for how to change the hydropower transformation, it depends on your own needs.

    Let's start with the living room, which wall you choose for your TV wall, and the socket and closed circuit will have to be changed. There is also the air conditioning line, ** line. Then there's the switch.

    In the bedroom, it is usually necessary to leave network cables, air conditioning sockets, and bedside lamp sockets.

    Toilet outlets need to be set aside for hair dryers.

Related questions
7 answers2024-06-05

1. In order to ensure the unification of the position of the switch and socket in the future, the hydropower master will play the line on the wall before slotting, and also use the cup to connect it uniformly, so that there will be no different levels of the socket in the future. Another point must be paid attention to in the process of hydropower transformation, the wire must be covered with insulating pipes. >>>More

6 answers2024-06-05

List of home improvement hydropower materials 2, auxiliary materials: wire pipe, tee, cassette, elbow spring, box joint lock, box joint lock, straight head, waterproof insulating tape, waterproof tape, broadband TV point. >>>More

10 answers2024-06-05

Home water and electricity renovation.

It is not an easy task, and the following three aspects should be paid attention to when carrying out home hydropower transformation: 1. Design the renovation plan in advance 2. Do a good job of supervision during construction 3. Pay attention to the quality of hydropower materials. >>>More

11 answers2024-06-05

Renovation does not necessarily require water and electricity renovation, but if it is a rough house, it is recommended to hire a plumber to carry out water and electricity renovation, because some of the sockets, switches and water outlets set up by the developer are often incomplete or do not meet the owner's preferences. >>>More

7 answers2024-06-05

Precautions should be paid when designing and constructing houses for water and electricity: >>>More