Excuse me, I received an earthwork and stonework, and how much can one party do if it is about to tr

Updated on society 2024-06-07
33 answers
  1. Anonymous users2024-02-11

    The region is different, generally five or six dollars can be done, not counting the loading, the knowledge learned is limited, the language skills are average, but I have tried my best to go, I hope to help you!

  2. Anonymous users2024-02-10

    If you intercept a piece of earth and stone to transport 1 to 3 kilometers, it will cost about 10 to 50 yuan per cubic meter, because the distance is not very far.

  3. Anonymous users2024-02-09

    You have a 1 to 3 kilometers of earth and stone transportation, about how much the freight can be done, it depends on what amount you have, but one side can do it for 15 yuan.

  4. Anonymous users2024-02-08

    You took a special earthwork transportation 1 3 kilometers, about how much the transportation cost can one side do, you can try how many times a day can run, and roughly how much oil to use, you know.

  5. Anonymous users2024-02-07

    I don't think it's very expensive on one side, it's estimated to be about ten dollars.

  6. Anonymous users2024-02-06

    Here is an approximate bungalow that can be transported by means of a budget, multiplied by the number of tons.

  7. Anonymous users2024-02-05

    There are real and imaginary squares in the middle, and it depends on the geology! Then there is how many cars are transported by your local 3 kilometers. This kind of is generally turned into an infield.

  8. Anonymous users2024-02-04

    Otherwise, you must understand it very well, if you can do this, if you can do it, whether you can do it depends on the relevant things you.

  9. Anonymous users2024-02-03

    The standards are different in different places, and the road conditions are different.

    It is better to ask a local construction driver for Lakala.

  10. Anonymous users2024-02-02

    This can be calculated by a certain calculation formula, and many accountants can calculate it.

  11. Anonymous users2024-02-01

    How much does this cost, and if you want to pay for the freight, you can change it to those masters who pull the goods, or ask about others.

  12. Anonymous users2024-01-31

    I received an earthwork resource, and the cost of transporting 1 3 kilometers is regulated.

  13. Anonymous users2024-01-30

    In the case of this freight, you still have to decide to be thin according to your local area, because the freight cost in each place is different, and your side, well, how much is the oil market, these can be pushed This can also be budgeted.

  14. Anonymous users2024-01-29

    Such a problem needs to find a person who is engaged in engineering work, and only those who are engaged in engineering can know how much such freight should be?

  15. Anonymous users2024-01-28

    What kind of professional is this local dialect, the water is three kilometers, how much is the approximate freight? If one party can do this, five dollars should be fine for shipping.

  16. Anonymous users2024-01-27

    I ordered an earthwork of tens of thousands of yuan, but if the freight is about how much it is, you must calculate it first, what his ** looks like, and then do it.

  17. Anonymous users2024-01-26

    It is necessary to determine the specific ** according to your local transportation**, the local interest relationship between you.

  18. Anonymous users2024-01-25

    If you said this earthwork, then the freight under normal circumstances should be about 300, accounting for a ** is basically about the same.

  19. Anonymous users2024-01-24

    One-kilometer vehicle transportation price: speed per ton * total weight of load Actual total weight * material coefficient.

    Half a kilometre for starting: 1 kilometre price*.

    Material coefficient: gravel, other 1.

  20. Anonymous users2024-01-23

    Generally, it will be judged comprehensively according to the stone quality, transportation distance, transportation difficulty, and transportation cost, and the ** of each party is generally between 20-30.

    If it's just freight, you can calculate the cost according to the formula first:

    Per kilometer = tonnage * speed * gross nuclear weight gross weight * material coefficient.

    Half a kilometre = one kilometre*.

    The material coefficient is gravel, other 1.

    Productivity calculation of three main earthwork transportation construction machinery:

    The productivity of a single-bucket crawler excavator per 16 hours Q excavator Q - excavation bucket capacity This project uses a bucket capacity excavator, and the calculation is temporarily calculated according to the bucket capacity. n-ring times, generally 205 225 times, this takes 205 times an hour km - digging bucket full coefficient, take according to ordinary soil, dragline), general km =.

    ks - soil looseness coefficient rock take, general ks = time use coefficient, generally taken, here taken.

    Q - excavator = 16 q n km kb ks = 16 days).

  21. Anonymous users2024-01-22

    What category do you need to add to the stone, if the stone is turquoise, the strength of all kinds of stone below 20MPa can be done, generally using hook machine or D11 bulldozer with excavator and dump truck construction of more than 20t, the cost is about 22 cubic meters.

  22. Anonymous users2024-01-21

    If it's just freight, you can calculate the cost according to the formula first, per kilometer = tonnage * speed * total nuclear weight gross weight * material coefficient. Half a kilometer at the start = one kilometer*, the material coefficient is gravel, other 1.

  23. Anonymous users2024-01-20

    If it's just freight, you can calculate the cost according to the formula first, per kilometer = tonnage * speed * total nuclear weight gross weight * material coefficient. Half a kilometer at the start = one kilometer*, the material coefficient is gravel, other 1.

  24. Anonymous users2024-01-19

    Dear, hello, first of all, it depends on what kind of stone this is, if it is turquoise, the strength is below 20MPa, generally at 22 on each side.

  25. Anonymous users2024-01-18

    Consult how much is the earthwork distance of 30 kilometers**.

  26. Anonymous users2024-01-17

    How much does it cost to ship a cubic meter for a flat rammer with a transportation distance of 25 kilometers including tax.

  27. Anonymous users2024-01-16

    About 60 yuan 105 yuan. Generally, it is 4-7 yuan per ton kilometer, which includes taxes. The freight is to multiply the tonnage of your goods by the number of kilometers per ton-kilometer, and the result is the freight.

    One-kilometer vehicle transportation price: speed per ton * total weight of load Actual total weight * material coefficient.

    Half a kilometre for starting: 1 kilometre price*.

    Material coefficient: gravel, other 1.

    At the same time, in order to reduce the construction cost of earthwork projects, implement the principle of not occupying or occupying less farmland and arable land and conducive to land reclamation, it is necessary to make a reasonable allocation plan for earthwork and make overall arrangements.

    Extended information: The transport industry is one of the independent sectors of material production, but it does not produce tangible products, its production activities only cause the spatial displacement of passengers or goods, and its production process is the same process as the consumption process. This makes the transport ** different from the general industrial and agricultural products **, which is characterized by:

    1. Factors such as distance and weight are included in the ** composition, and the calculation unit is the freight rate per ton kilometer or per person kilometer (ton nautical mile freight rate or human nautical mile freight rate);

    2. There is only one form of sales;

    3. Different freight rates are formulated according to the type of goods transported, the mode of transportation selected and the transportation distance.

    Cargo transportation** is made up of transportation costs, taxes and profits. The transportation cost is an important basis for formulating the transportation of goods, and generally refers to the transportation expenditure that should be shared by the unit of transportation products or passengers. The characteristics of transportation costs are that they do not include raw material costs, and the expenses of fuel, wages, depreciation and repairs account for a large proportion of various transportation costs between various means of transportation or modes of transportation, and there are also various price comparison relationships.

    The level of cargo transportation has a great impact on the development of other sectors of the national economy. In particular, the level of cargo transportation is directly related to the production and operating costs of industrial and agricultural products.

  28. Anonymous users2024-01-15

    If it's just freight, you can calculate the cost according to the formula first, per kilometer = tonnage * speed * total nuclear weight gross weight * material coefficient. Half a kilometer at the start = one kilometer*, the material coefficient is gravel, other 1.

  29. Anonymous users2024-01-14

    Each sand and gravel transportation company is different, it is recommended that you contact the sand and gravel transportation company for consultation.

  30. Anonymous users2024-01-13

    Hello dear; 25 kilometers of earthwork transportation is about 40-80 yuan. Transportation of earthwork 20 kilometers 100-200 yuan a side. It is calculated according to the number of quantities.

    Earthwork contracting is calculated according to the quantity of earthwork contracted. In other words: how much money to negotiate with others.

    The main considerations for earthwork are: 1. The excavation conditions of the earthwork; 2. The distance of earthwork transportation; 3. The conditions of earthwork transportation, including off-site transportation road conditions, etc. Loading fee: Freight.

    Loading fee: excavator loading, according to the efficiency of the excavator (that is, how many standard trucks can be loaded per hour); Freight: Calculated according to the unit price of ton-kilometer, it is now rising, and it is estimated that there will be yuan per ton-kilometer.

    If a car is loaded with 10 square meters, each side of the loose ton, that is, 16 tons per car, if you go 20 kilometers, that is, the large freight = yuan, if the loading fee is 5 yuan car, that is, the unit price of each side = 5 = yuan. Thank you for your consultation, I hope this service can help you, you can click on my avatar to follow me, and if you have any questions in the future, please consult me again, and finally wish you a happy life! <>

  31. Anonymous users2024-01-12

    Summary. This question is up to me, it takes a little time to type, so please be patient.

    Excuse me, I received an earthwork and stonework, and how much can one party do if it is about to transport 1 to 3 kilometers?

    This question is up to me, it takes a little time to type, so please be patient.

    Thirty-two axioms, drag Zheng Yan a car of sand or stones 33 tons, a car of 37 yuan, 8 million square stones, cobbles shouting stuffy stones, cement road, 24-hour transfer cover the world, 11 pieces per ton 3, can you pick up.

    Please reply.

    Pebbles. Hello, I'm glad to rent a rotten answer for you, the unit price of the earthwork of the stone project is 23 yuan, the unit price of the earthwork is 12 yuan, your is a pebble, according to your above historical description, ** is a low point, I hope my answer will help you

  32. Anonymous users2024-01-11

    Pro, 70 yuan one side of the distance 30 cm slippery oak can be done generally according to the stone, transportation distance, transportation difficulty, transportation cost to make a comprehensive judgment, generally each side of the ** between 20-30. If it's just freight, you can calculate the cost according to the formula first, per kilometer = tonnage * speed * total nuclear weight gross weight * material coefficient.

    Half a kilometer = one kilometer*. The material coefficient is gravel, the other 1 starts half a kilometer = one kilometer*, and the material difference coefficient is gravel, the other 1

  33. Anonymous users2024-01-10

    Summary. Hello dear and happy to answer for you. The questions you inquired about are answered here as follows:

    At present, it is 6 yuan to pull the earthwork for one kilometer, and the ** on the market is as follows: 1 kilometer, 6 yuan imaginary square; 1-3 km, 8 yuan imaginary square; 3-5 km, Yuan Xufang; 5-7 km, Yuan Xufang.

    I would like to ask how much the cost of earthwork transportation is per kilometer.

    Kiss your orange acacia and say goodbye, I'm happy to answer for you. The question you consulted, here is the following answer for you: at present, one kilometer of earthwork is 6 yuan for the bright chain, and the ** on the market is as follows:

    1 km, 6 yuan imaginary square; 1-3 km, 8 yuan imaginary square; 3-5 km, Yuan Xufang; 5-7 km, Yuan Xufang.

    Earthwork is the general name of earthwork and stone, that is, soil and stone grinding, and the unit of measurement is generally cubic meters (m) earthwork engineering, including all soil (stone) excavation, high bucket bang, filling, transportation, drainage, precipitation, etc. Earthwork is generally widely found in the excavation of soil and stone.

    How much is the approximate cost of transporting earth and rock reclamation for 150 kilometers.

    You can charge by the ton, or you can charge by the car, 150 kilometers about 900 yuan, each kilometer is 6 yuan of freight.

Related questions
3 answers2024-06-07

Hello landlord, congratulations on completing the [Learn to ask questions] task, you can get the task reward! We always have your back! >>>More

15 answers2024-06-07

How to match the lens depends on your application. If you're a beginner, the D40X's pullover is enough for you. If you're specialized in portraits, consider a fixed-focus large-aperture lens. If you're mostly landscape, then a telephoto is also necessary. >>>More

8 answers2024-06-07

First learn the following common planning software:

word、excel、visio、ps >>>More

31 answers2024-06-07

Give up decisively and avoid getting hurt in the future

22 answers2024-06-07

Landlord, please see**The small question mark in the lower right corner.,That's the small ** that introduces the combat unit.**,There are about hundreds.,There are several gigabytes in total.。 I don't think you have any of that**. There are other cutscenes that you may not have either.