The line of home improvement hydropower, how to install home improvement water and electricity

Updated on home 2024-06-03
9 answers
  1. Anonymous users2024-02-11

    The position of the switch is generally easy to operate, the switch height has industry standards, and the wiring is also specified, you can check it.

  2. Anonymous users2024-02-10

    Most of them came at the request of the owners.

    But you need to know the installation height of conventional sockets, switches, and distribution boxes.

    The lower edge of the main switch box of the power supply is distance from the ground meter; The lower edge of the household switch box is meters away from the ground; The wall switch is meters from the ground; Splash-proof sockets are located in meters from the ground; The air-conditioning sockets in bedrooms and study rooms are meters away from the ground; Generally, ordinary sockets are meters away from the ground; The sconces are meters from the ground.

    The above is common sense. Generally speaking, the owner's requirements are also very important, and sometimes they don't stick to these and completely listen to the owner.

    Like you said, the distance between the bedside lamp and the switch, I didn't find a specific requirement here, you can do it yourself. You can also ask the owner.

    In addition, as for the line, this is to see how to go in the construction process, how to save trouble and how to go, of course, safety is still the first.

  3. Anonymous users2024-02-09

    Do the math how much it will cost you to renovate your home

    1. Layout.

    Hydropower lines should be decorated according to the spatial layout, different regional functions are different, and the laying requirements for the lines are also different, which should be subject to the actual indoor situation, especially the kitchen and bathroom, and the lines should be more reasonable to facilitate future use.

    2. Living habits and preferences.

    The layout of water and electricity should be decided according to the living habits and needs of the owner, such as some users like to install the water heater in the kitchen, and some like to install it in the bathroom. In addition, different types and quantities of electrical appliances should pay attention to practicality when wiring.

    3. Go to the top and walk to the ground.

    When designing the line for hydropower, try to go to the top or the ground, but try not to design too many lines on the ground, because the ground needs to lay tiles or wooden floors in the later stage, once the line has problems, it is troublesome to repair and rectify, and the cost is high.

    4. Horizontal and vertical.

    When laying the circuit waterway, it is necessary to pay attention to horizontal and vertical, choose short-distance wiring, and do not go around the east and west, otherwise the waste of materials is not to mention, the water pipe is bent too much, and it will cause damage and leakage.

    When hydropower transformation, pay attention to the same room, switch and socket should be set on the same horizontal line, the switch is about a meter from the ground, and the socket is about 30 cm from the ground. In addition, the load-bearing wall can not be grooved, and if you really want to route the line, you need to use a yellow wax tube, which is light and thin, and only needs to be buried in the cement layer of the load-bearing wall. Moreover, the wall slotting should be thrown vertically, and try not to throw it horizontally, otherwise it will damage the strength of the wall.

    Enter the area and get the decoration for free**].

  4. Anonymous users2024-02-08

    It is better to decorate the house with water and electricity according to the horizontal and vertical lines.

    1. Horizontal and vertical. For hydropower wiring, basically the horizontal and vertical wiring method will be adopted, which can not only make the line aesthetically pleasing, but also have little impact on other construction work.

    2. Dotted line. For the staff who are more knowledgeable about electricity, this kind of wiring can save some costs, but it is characterized by more messy and has a greater impact on future maintenance.

    3. Hydropower walks the wall. In addition to the ground and two points, there is also a way to walk the wall, this way of wiring is less difficult, although the later maintenance is easier, but the difficulty of the early slotting work is not easy.

    Hydropower wiring is a problem that needs special attention to decoration, once you do not choose a good wiring method, then it will not only consume financial resources, but also be more troublesome to maintain in the future.

    The villa master provides you with local building policies, building drawings, and villa design drawings;

    Villa appearance renderings service, thousands of popular drawings for you to choose.

    Villa Master.

  5. Anonymous users2024-02-07

    The renovation of water and electricity in the new house is not only the first basic renovation project, but also the top priority of the whole project. Hydropower renovation as a hidden project in the renovation.

    Some issues are also often "hidden". First of all, do a good job of hydropower positioning. Secondly, discuss the specific direction of the water circuit and the location of switches, sockets, and interfaces.

    Finally, check the quality. Hydropower renovation is a concealed project, once the hydropower acceptance is over, after the wall is painted and tiled, it is inconvenient to repair the engineering problems. Therefore, in the transformation of hydropower, we should not only pay attention to the quality of construction, but also carefully select materials.

    Waterway Renovation Tips:

  6. Anonymous users2024-02-06

    Home decoration includes water and electricity installation, how to install water and electricity for home improvement? Today, I will answer them one by one for you.

    1. Slotting. The line is played first, and then slotted, and the pipe slotting must be parallel and perpendicular according to the requirements. For the pipe of the flat walking line, the height of 60-90 cm is always controlled, and the pipe with faucet must be vertical.

    2. Installation. The pipeline is divided into cold water pipe and hot water pipe, and the construction personnel can discuss the water area and use function with the owner, and arrange the water and electricity master to discharge all the faucets and water locations that have been installed.

    3. Inspection. Pipeline inspection can be done by pressure test method, pressure test is one of the methods of pipeline leakage inspection, you can plug all the inner wires first. Use a pressure gauge to press (generally 6--8kg for home improvement) to test the water. After compression, inspect all pipes and joints.

    4. Waterproof. After the waterway pipeline is installed, seal the trunking of the bathroom with cement and sand mixture, and wait for the trunking and the ground to dry, and then clean the draft and slip the first wash of the ground and the wall, the wall and ground moisture can be waterproofed, and the waterproof of the wall key is best above 80cm.

    5. Circuit slotting.

    After discussing the electrical functions and requirements with the owner, explain to the electrician master and play the parallel and vertical slotting. Put the switch socket bottom box, the socket is slotted 40 cm from the ground, the hanging air conditioning socket is slotted from the ground, and the switch is slotted from the ground.

    6. Circuit wiring.

    For circuit wiring, the copper core wire above square meters and the wire pipe above 16mm are used. Strong and weak conduits should be separated from concealed combinations. The wiring of strong and weak electricity is separated by 30 cm at the lowest limit, and the wires of more than 6 square meters are grouped for air conditioning sockets, 4 square meters for electrical sockets, and more than square meters for switches.

  7. Anonymous users2024-02-05

    Home Wang Youyou Installation Hydropower refers to the installation of water and electricity in the process of home renovation. Hydropower installation is one of the important links of home improvement, including the installation and wiring of water pipes, wires, sockets, switches and other facilities. The quality of water and electricity installation is directly related to the safety and comfort of the home.

    When carrying out home renovation water and electricity, you need to pay attention to the following points:

    1.Choose a regular plumber team to ensure the quality and safety of construction.

    2.According to the actual situation of the family, the water and electricity wiring design is carried out, and the location of sockets, switches and other facilities is reasonably planned.

    3.Choose high-quality materials such as water pipes and wires to ensure longevity and safety.

    4.During the construction process, pay attention to protect the walls and floors to avoid damage.

    5.After the installation of water and electricity is completed, the necessary testing and acceptance are carried out to ensure safety and reliability.

  8. Anonymous users2024-02-04

    Pre-planning: Careful planning and design is done before you start renovating. Determine the location of appliances, outlets, switches, and lighting in each room so that the wiring paths can be properly arranged.

    Layered wiring: Arrange different kinds of wires in layers, such as separating strong wires (such as air conditioners, water heaters, etc.) and weak wires (such as **, TV, etc.) to reduce interference and potential safety hazards.

    Conceal wiring: Hide wires in walls, floors, or ceilings whenever possible, using built-in trunking, slotting, buried pipes, etc. This keeps the walls tidy and reduces the exposure of wires.

    Gutter routing: Make a slot of the right size on the wall, put the wires into the slot, and then patch the slot with drywall or plaster so that it is flush with the wall surface. This method is more common and is suitable for situations where you need to change the direction of the wires.

    Floor trough routing: If wires need to be routed on the floor, they can be hidden by slotting or using floor troughs. This allows for more concealment of wire routing and does not affect the flatness of the floor.

    Ceiling wiring: For areas that need to be arranged with lighting fixtures or ceiling fans, etc., they can be routed through the ceiling. Install a wire duct or buried pipe in the ceiling, arrange the wires in it, and lead the line out of the chain posture through the opening of the ceiling.

    Whichever routing method you choose, you need to comply with the relevant safety codes and building regulations.

  9. Anonymous users2024-02-03

    It is generally recommended that the strong and weak electricity be separated, and it is best to separate the color of the threading pipe, which has Weixing, Deyi, Taurus, and red and blue. Red wears strong wires, blue wears weak wires.

    It is recommended to walk away with strong electricity, go away with weak electricity, and completely control the drying.

    For the problem of the point layout of strong and weak electricity, it is recommended to arrange more points, try to make it not enough after moving in later, and if you use the drag line board to meet it, it will be more messy.

    The socket is recommended to use a switch to control the five holes, don't ask me why, you will know how good it is after using it.

    It is recommended to have 4-6 five-pin sockets in the center of the TV wall in the living room, and you can also put another backup socket on both sides that can be plugged into water dispensers and other outlets. 1 network (mostly network TV), 1 TV socket (cable TV).

    It is recommended to leave 2 five-hole 1 on the left side of the sofa background**, and 1 five-hole socket on the right.

    The restaurant recommends leaving 1 five-hole is enough, and it is available to eat family hot pot.

    The kitchen socket can be arranged according to the functional needs of your clear posture, pay attention to whether you want to disinfect the cabinet, water purifier, and these special requirements. There is also no living balcony in your house, and the water supply of the water heater is far away from the bathroom, so it is recommended to use a circulating pump (1 socket is required).

    The bedroom function room is recommended to have two five-hole strong current on both sides of the bed, 1 ** socket, 2 five-hole 1 network 1 TV on the TV wall, which is enough.

    If you have a study function, put a few more sockets in the desk position, and consider the desktop computer as the main one, and put it in 3-4 strong currents.

    If there is a bay window, you can consider putting 1-2 sockets, mainly for laptops that can be used temporarily.

    The location of the shoe cabinet can be considered to put 1 five-hole socket for shoe dryers.

    Large landscape balcony with 1 king hole socket for spare.

    The landlord can refer to the tour to test their own needs and make adjustments.

Related questions
2 answers2024-06-03

1. Technical regulations and technical regulations for waterway construction: >>>More

4 answers2024-06-03

1. The material process must meet the requirements of the company's specifications: all wires are made of famous brands such as pigeon brand BV wires, lighting circuit sockets air conditioners 4mm2, kitchens, bathrooms 4mm2, and grounding wires, especially emphasizing that DAEX general light (16) pipes or DAEX (16) B pipes, round tees, direct, locks, and yellow wax pipes should be used in the threading, and bellows, elbows, and equal diameter tees are never allowed. 1 16 pipes can only be used for one circuit, 20 can only be used for 6mm21 circuits and the circuit between the toilet bomb and the switch. >>>More

6 answers2024-06-03

Hydropower installation refers to the decoration process of replacing all or part of the waterways and circuits used by the original developer according to the decoration configuration, family population, living habits, and aesthetic concepts. Hydropower transformation is divided into waterway transformation and circuit transformation. Hydropower projects are hidden projects, so they must not be sloppy! >>>More

7 answers2024-06-03

Hello, it is home decoration, bathroom and stove room, hot and cold water, generally with 20 Weixing ppr pipes, heating with 25 ppr hot water pipes.

6 answers2024-06-03

Electrician, plumber, basic knowledge, 8 years of experience summary of front-line masters, divided into 30 sections, let's take a look, what to learn: >>>More