    There are two ways to caulk cultural wall tiles:

    1) Feed the joints with an ash spoon: put the cement mortar (fine sand: cement = 1:2) on the ash board, smooth it into a slurry board about 5mm thick, and then divide it into 5mm 5mm strips with an ash spoon, send it to the brick joint, wipe the excess mortar on the brick surface, and try to avoid the cement staining the brick surface.

    2) Large-area plastering: first wet the brick surface with water, after drying the surface, wipe the joints with the cement mortar of the above proportion, after the brick mortar is slightly solidified, scrape the brick mortar with a rubber sheet, and then wring it out with sponge wet water, and wipe the surface clean in time until there is no trace of cement. For more cultural wall tile caulking methods, you can pay attention to Foshan luxury element ceramics, and there is a professional construction plan to guide.

  2. Anonymous users2024-02-11

    Summary. Dear, hello, the ** of the cultural brick joint: 20 yuan per square meter.

    About $10 to $15 per square meter. 2.Polymer caulk:

    About $20 to $30 per square meter. 3.Silicate grout:

    About $25 to $35 per square meter. It should be noted that this is only a reference for some common materials, and the specific needs to be based on the actual situation. In addition, it is also necessary to take into account factors such as construction difficulty, engineering quantity, labor costs, etc., which will affect the final cultural brick joint price.

    1.Gray cement joints: about 10 yuan to 15 yuan per square meter.

    2.Polymer grout: about 20 yuan to 30 yuan per square meter.

    3.Silicate grout: about 25 yuan to 35 yuan per square meter.

    It should be noted that this is only a reference for some common materials, and the specific needs to be determined according to the actual situation. In addition, it is also necessary to take into account factors such as construction difficulty, engineering quantity, labor costs, etc., which will affect the final cultural brick joint price.

    How many squares a person can seam in a day.

    Dear, a person can hook the seam for a day: 25 square Oh. Under normal circumstances, an experienced worker can hook about 20-30 square meters per day.

    The following is the calculation method of the cultural brick grout project for reference:1First of all, you need to calculate the area of the cultural brick wall.

    Cultural bricks are usually bricks with a length of 250mm, a width of 60mm, and a thickness of 20mm, and its area is (250*60)mm=15000mm, that is. 2.Calculate the amount of material required per square meter.

    According to the different grouts, 1-2 kg of grouts are generally needed to hook and stare at the cultural brick wall with an area of one square meter. 3.Determine the speed of construction to ensure labor intensity.

    Under normal circumstances, a worker with certain experience and skills can joints an average of 3-4 square meters of cultural brick walls per hour. 4.Based on the above data, the area of the joints that can be completed per day is calculated.

    Assuming that a worker works 8 hours a day, he can complete the square meter of cultural brick wall per hour and 28 square meters of joint work per day. It should be noted that the above is only a rough calculation method, and the actual amount of seam work may be affected by some other factors, such as the working environment, the details of the seam, etc., so please refer to the actual engineering situation.

  3. Anonymous users2024-02-10

    Cleaning:

    Clean the joints, brushes and auxiliary tools to ensure that the joints are securely adhered to the surface of the wall.

    Mixing: a The amount of water is 16-18% of the weight of the sewing material, which can be adjusted appropriately according to the specific conditions of the local climate.

    b. Stirring method: slowly pour the sewing material into the container containing water, stir while pouring, and use up the stirred material within 1 hour, do not add water or dry powder again and stir.

    Extrusion: APut the stirred material into a special construction extrusion bag, cut open the leakage bag mouth and squeeze the material into the crack, and set the filling depth according to the need.

    b.After the material is squeezed, the material should be reloaded, and then the material should be squeezed, and the plastic bag should be cleaned and reused in a timely manner.

    Seams: aAfter extrusion, after a certain period of time (10-30 minutes in summer; 30-60 minutes in winter) for seam crimping, at this time the moisture content of the sewing material is 13%. If you have no experience, you can weigh a little dry material, plus 13% of the weight of the dry material water, and feel its appearance and state after mixing.

    b.The sewing material is too dry, the adhesion is not enough, it is easy to fall off the powder when pressing the joint, the joint is too wet, and it will overflow to the brick surface when pressing the joint. As for how much time to reach the pressable seam state (13% moisture) after extrusion, it depends on the specific situation (the speed and time of moisture loss in the solid seam are related to the dry and humidity of the contact surface).

    c.If the sewing material still does not meet the thickness requirements after seam pressing, repeat the extrusion and seam pressing steps.

    Styling: AAfter the seam is pressed, the sewing material is further cured (40-90 minutes in summer, 1-3 hours in winter). At this time, the moisture content of the sewing material is about 8%. Use steel wool balls or other coarse brush-like tools to gently wipe the surface to show a sandy texture and rough seam surface.

    b.Then use a brush with a soft and hard texture to sweep away the floating material on the surface of the seam.

    Cleaning: After the modeling, you can use a clean, dry brush to sweep away the floating objects on the surface of the brick, if the brick surface is polluted, immediately wipe it with a clean wet towel.

    Curing: Under normal climatic conditions, the seam curing time is 6-24 hours, and sprinkling curing is required at this time, which is conducive to increasing strength. It is recommended to sprinkle water once a day for a week after construction. After the construction of the sewing material is completed, do not let the direct sunlight before sprinkling and curing.

    Precautions: Construction is not suitable in too cold weather (construction is not allowed below 4).

    It is not suitable to construct directly under sun exposure (simple awnings can be built).

    Before construction, please be sure to confirm whether the moisture of the wall is suitable for construction (the wall is too dry, and the water is absorbed directly from the mortar and joint, which will lead to insufficient construction, easy to fall off the product, poor strength of the joint, etc.).

    It is not suitable for construction in rainy days (it will lead to the whitening and dirty surface of the product).

    The paving product should be compacted as hard as possible.

    Quyang Nature Culture Stone will answer for you, I hope it will help you!

  4. Anonymous users2024-02-09

    The cultural stone caulking agent is different, and the natural cultural stone in Quyang has a special cultural stone caulking agent and paste. **Between 1200-1500 yuan tons, the installation process of cultural stone does not need to be hung dry, and it is directly pasted, using its own special paste. It is easy to install, saves time and money, and reduces time and money costs for our customers.

  5. Anonymous users2024-02-08

    Dilute with ink and water, put in cement and soak naturally for about half an hour.

  6. Anonymous users2024-02-07

    1. Press the stirred caulk into the joint along the diagonal direction of the brick face with caulk.

    2. Use a squeegee to scrape the gaps.

    3. Let it air dry for a few hours, and then use a slightly damp sponge or cloth to thoroughly clean the surface of the tile.

    4. When the caulk is dry for more than 24 hours, there are still traces on the surface of the tile, wipe it off with water or tile cleaner.

    When I was decorating my home, when I was laying Maraz antique bricks, this is what the paving guide book said.

  7. Anonymous users2024-02-06

    In fact, the method is relatively simple, first use a brush to dry brush, do not dip in water, if dipped in water, the grout will be easily soaked into the cavity of the cultural brick and can no longer come out; When the brush is almost done, if it is still white, you can dip it in water and brush, at this time, you can wash off the fine grout on the surface; Finally, take a look at the final result and patch up the part.

    Some people don't understand why they should go through the platform to find the construction team instead of looking for it themselves, and I really need to explain:

    Even if the general third-party supervision finds that the team has a problem, there is nothing to be done, why should the team listen to you, so the general third-party supervision can only let the customer put pressure on the team, but it is also very difficult, the team said, you let me do this, the owner also has suffering, there is no way to solve it. But a platform like Xiuchao is different, it has a strong restrictive force on the team, not only has signed a strict guarantee agreement with the team, but also the team has to pay the warranty, so at a critical time, the platform can play an irreplaceable role, saving money is one of the conveniences, and it can also solve a lot of troubles for the owners.

Related questions
13 answers2024-06-15

1. There is no mandatory standard for whether floor tiles and wall tiles must be seams, but because of the special environment of the kitchen and bathroom. >>>More

7 answers2024-06-15

I think tile grout, just listen to the name, everyone should know what this thing is, right? As a material that fills the gap between tiles and tiles, although it is only a few millimeters wide, it plays an important role in landscaping. So, what is the color choice of tile grout? >>>More

18 answers2024-06-15

Real stone paint, compared with the current exterior wall decoration materials is better, first of all, real stone paint is environmentally friendly, highly decorative, safe and cost-effective.

5 answers2024-06-15

The regular size of the yoga block is 23*15*. Yoga Block is for beginner yoga practitioners with flexibility. >>>More

8 answers2024-06-15

First, look at the appearance.

The color of the tile should be uniform, the surface finish and flatness should be good, the surrounding rules should be regular, the pattern is complete, and four or five pieces should be extracted from a box to see if there are defects such as color difference, deformation, lack of edges and corners. >>>More