Hydropower retrofit.
The renovation cost of a 120-square-meter house is about 16,000 to 20,000, 30 square meters of strong electricity, 42 meters of slotted wiring, and 38 meters of non-slotted wiring.
Weak current 35 flat, slotted wiring 32 meters, no slotted wiring 28 meters.
Labor cost for installing electrical box, 200-300 places.
The waterway PPR water pipe is concealed 58 flat.
PPR water pipe surface installation 50 flat.
The sewer installation is 50 flat.
Dark pipe slotting (labor cost) 20 square meters.
4. Waterproof 70-90 square meters (including materials and wages).
Bathroom backfill.
Carbon frying backfill 180-195 m2
Ceramsite backfill 280-200 m2
-
Under normal circumstances, in some small cities, about 100 square meters of houses, the cost of hydropower renovation is basically about 2,000 yuan.
-
60 yuan meter Note: PP-R pipe is Weixing or Jinde pipe, and the sewer is Liansu pipe. 1. Each meter contains one pipe sleeve of equal diameter and different diameter, and one 90-degree elbow.
2. This is a water pipe without valve hardware plus 10 yuan per meter. 4. Less than one meter is calculated as one meter.
5. There is an additional charge for punching, 40 yuan for each load-bearing wall and 20 yuan for each non-load-bearing wall.
No more than 3 wires are threaded in the flame retardant electrical pipe, and if there are more than 3, 5 yuan per meter will be added. The wires in the pipe are required to have no joints, and the distribution box should also be used at the distribution line. switch socket bottom box 86 type 10 yuan each; 118 type 15 yuan each, 4 square wires plus 10 yuan per meter.
Multi-pipe and same slot are billed as multiple dark lines. After the groove is buried, it is filled with gypsum or cement mortar. Dark Tube:
35 yuan meter open pipe: 25 yuan meter material: pvc wire thickened cold bent pipe, wire.
Hydropower in different regions will be different, and the urban areas and counties in the same area will also be very different in terms of quality, not to mention the choice of a professional construction team or the decoration workers introduced by acquaintances, which are one of the factors affecting the first place. Generally, waterway decoration to find decoration workers in 7-10 yuan per square meter, but it only includes light decoration, find a decoration company to contract the decoration of labor and materials, ** about 50-70 yuan per square meter; Circuit decoration to find decoration workers ** in 20-30 yuan per square meter, the same is just light decoration, building materials need to be purchased by themselves, choose the decoration company contractor package decoration, ** about 70-80 yuan per square meter.
-
How much is the renovation of water and electricity per square meter? This also depends on the size of the change, and cannot be simply estimated. Generally, if there are changes in water and electricity, it will cost about 100 yuan.
-
When the plumber decorates, the fee is generally not 30 yuan to 35 yuan per pen.
Therefore, the established charging method can be evaluated and evaluated by yourself.
-
The coordinates of Mianyang, Sichuan, 45 per square meter, are according to the property right area, not the actual indoor area.
-
When the house is decorated, the cost of water and electricity is also expensive, and the cost of water and electricity slotting, pre-embedded wire pipes, water pipes, and wires is relatively high, and the overall cost is about 30,000 yuan.
-
If the cost of water and electricity is calculated according to the subcontracted labor price, it will cost 10 yuan per meter, and less than one meter will be calculated as one meter. The slotting of the wire box is calculated in units, and the slotting cost of each bottom box is 5 10 yuan. The unit price of the waterway layout that needs to be slotted is basically the same as that of the circuit, but the unit that needs to use rhinestone to open the hole is 30 yuan.
-
This depends on the requirements of your material selection, but generally speaking, 5000-8000 will be done.
-
After entering the site, the plumber will mark according to the customer's needs or design, mark the wall where water and electricity must be used, and the status of the construction drawings will be based on the actual operation of the construction drawings. If the cost of slotting of hydropower projects is calculated according to the labor cost of the subcontracted project, it must be 10 yuan per meter, and less than one meter is calculated according to one meter. The slotting of the bottom box is calculated by the company, and the slotting cost of each cassette is 5 10 yuan.
The layout of the waterway must be grooved and the power circuit is basically the same, but the rhinestone hole must be used for the enterprise, 30 pipe hole 30 yuan, 50 pipe hole 50 yuan, 75 pipe hole 50 70 yuan, 110 pipe hole 100 yuan, the actual situation and the total number of holes bargaining.
After this step, the other new decoration design projects in the room are basically carried out, so the plumber is also the last to leave. As mentioned earlier, 50% of the cost is grooving, 35% is for tube installation, and the remaining 15% is for running at the rear. However, according to the requirements of the industry or some secondary construction charging standards, such as the installation of switch and socket panels and basic water installation equipment in the water and electricity decoration work, but excluding the assembly of all lighting fixtures and sanitary ware, if the customer stipulates that the hydropower engineering master can assemble it, it must be added to some additional assembly costs, which is about 20% increase in the total engineer fee!
The first thing to understand is what routes there are for hydropower projects, including the processing technology of water pipeline line topping, threading pipe line topping, and also the processing technology of water pipeline topping and threading pipe.
In addition, there are also hydropower projects that take the processing technology of the road surface. The route is not the same, the general restaurant kitchen, toilet, ** air conditioner, refrigerator are independent all the way to the special line transportation, the house all the way, the living room dining room all the way, or multi-channel. The water pipes are also water pipes with a circulation system.
It is also useful for the level of well-known brands of raw materials for hydropower projects. It will affect the price. I have gone around so much or immediately said to you, according to the basic general home decoration, hydropower projects on the road, raw materials are selected from the common basic models and specifications on the market, and the general manpower is in the middle of 30-40.
Raw materials are also in the middle of 40-60. Actual prices are based on local markets**. Looking forward to helping you.
Recently, I have been interpreting the decoration steps and sharing the decoration experience. It happens to interpret the decoration strategy of hydropower projects.
Raw materials, how much do you want to buy, and what brand you want, in the middle of different brands, the price difference is relatively large. A suite, the same total, different well-known brands, will be thousands of yuan apart. Manpower, first of all, is a slotter, and this plumber can be contracted.
What is the master's technology, whether the hydropower project road regulations are complex or not, the price is different, and there will be a price difference of one or two thousand. Sometimes it's really hard to respond to how much it costs to install a house. But again, this is a very real problem.
Let's just talk about a price in a general specification. Excluding its own manpower, the general labor and material are five to five specifications. It belongs to the general point.
-
The cost of water and electricity decoration depends on the size of the house, as well as the overall pattern and the method of laying water and electricity lines, to be decided according to the size of the customer's needs, generally speaking, one square meter of water and electricity ** is about 80 yuan, if the amount of materials and laying is more, it should be about 120 yuan.
-
The cost of installing water and electricity is about 10,000 yuan to 20,000 yuan, and if the wires selected are better materials or the plug-in boards are better things, then the cost will be more.
-
It costs about 300 yuan, and hydropower work is a very important link, so you must pay attention to it.
-
1. How much is the renovation of water and electricity?
Settlement according to the actual area: the general strong electricity is now calculated according to 25-50 yuan square meters on the market (there is a complex hydropower trend, ** will increase), and the discharge of water is calculated according to 35 yuan square meters;
Daily settlement: according to the offline local hydropower workers' decoration unit price to settle, roughly ** in 150-300 yuan per day, according to the actual installation day * working day unit price = labor costs;
Settlement according to the actual length: 25 yuan meter according to the length of the wire pipe, 30 yuan meter according to the actual length of the upper and lower water pipes;
Lump sum settlement: After a professional plumber conducts the actual survey, a water and electricity decoration ** will be given, if there is no emergency, there will be no additional charges. 2. New water and electricity installation**.
1. Waterway (contracted labor and materials): including thickened cold-bent pipes and wires in PVC lines, 20PP-R water pipes are hidden 60 yuan m; The upper tube is installed at 50 yuan, and the lower pipe is hidden at 60 yuan;
2. Circuit (contractor): The wire package should include PVC hard flame retardant electrical pipe and switch socket bottom box, 86 type 10 yuan piece, 118 type 15 yuan piece, information integration box 160 yuan set, concealed pipe 30 yuan meter, pipe 20 yuan meter;
3. Lamp installation costs: 16 yuan for spotlights or downlights, 30 yuan for ceiling lights, 60 yuan for chandeliers, switches and sockets to be installed separately, 7 yuan for less than 30 yuan, and 5 yuan for more than 30 yuan;
4. Other material costs: the strength of the wire is 25 yuan; 4mm2 is 30 yuan; 40 yuan of 6mm2; The ** of the switch socket is 200 yuan. 3. What aspects need to be paid attention to in hydropower transformation.
1. Confirm the billing method of hydropower transformation.
This is very important because many hydropower renovations are found to be much more than we budgeted for. Therefore, what I personally recommend to you here is to carry out ** according to square meters, and then confirm it according to the plan of hydropower transformation. So as not to increase the cost after the transformation is a lot.
The other is to settle according to the facts, that is, to calculate according to the actual amount of work. For example, how many meters of water pipes are installed, how much is per meter to calculate, for conduits, wires, switches and sockets, etc.
-
About 100,000. Therefore, tiles, sand, labor, etc. require a lot of money, and about 100,000 yuan is already a relatively ordinary decoration.
-
Hello answer, I have seen your question, and I am sorting out the answer, please wait for a while The unscrupulous decoration master of the water will change the decoration materials of your home, and the materials that are different from the brand models that were said before, such as replacing the materials of the A brand with the B materials; Cutting corners, there are places to connect the tee do not give your home the tee, turn the bridge to save your home, and replace the hot water pipe with a cheap cold water pipe. Low price and high report, obviously walk a circle of wires can be done, decoration workers in order to earn rebates for the materials inside will give you a dozen laps of decoration, anyway, hidden projects, you are no longer on the side of the supervisor, invisible, can only listen to people!
Like, thank you.
-
If it is calculated according to a house of more than 100 square meters, it generally only costs about 10,000 yuan to get it.
-
The decoration of the house and the installation of water and electricity need about two or three hundred thousand, which is still the minimum standard, if you want to decorate a little better, at least five or six hundred thousand.
-
It is about 35 per square meter, and in different places, his charging standard is also different, mainly depending on the local consumption level!
-
Generally, the water pipe is 60-70 yuan per meter, and the electricity is 50-60 yuan per meter, and the cost is different depending on the size of the project.
-
Renovation utility bills** vary depending on the region, the size of the house, and the renovation requirements. Generally speaking, decoration water and electricity costs include two parts: water and electricity material costs and labor costs.
The specific decoration of the house can be calculated here, just enter the area + city, calculate the decoration in 3 seconds, know the real ** in advance, and easily grasp the decoration company: [Click here, free decoration**].
First of all, the cost of water and electricity materials refers to the cost of purchasing water and electricity materials. Hydropower materials include wires, switches and sockets, lamps, flushing imitation water pipes, faucets, etc. Depending on the brand and quality, it will vary.
Generally speaking, the cost of water and electricity materials accounts for a relatively small proportion of the total cost of decoration, about 10%.
Secondly, labor costs refer to the wage expenses of water and electricity workers. Plumbing workers are responsible for installing and repairing utilities, and their wages are calculated based on the difficulty of the job and the number of hours worked. Generally speaking, the salary of hydropower workers is between 200-500 yuan per day, and the specific ** is also determined according to the local market ** and the technical level of the workers.
In addition to utilities, materials, and labor, there are a few other costs to consider. For example, if water and electricity retrofitting is required, the cost of demolishing old facilities and installing new ones will also need to be paid; If there is a need for water and electricity acceptance, the acceptance fee will also need to be paid. In addition, there are some possible additional costs to consider, such as temporary electricity bills, warranty fees for water and electricity equipment, etc.
In general, the range of decoration water and electricity bills is relatively large, generally between 5,000-20,000 yuan. The specific ** should also be determined according to the area of the house, the decoration requirements and the local market**. When choosing a plumbing worker, it is important to pay attention to choosing an experienced and reputable professional to ensure the quality and safety of the hydropower project.
At the same time, it is also necessary to fully communicate with the water and electricity workers to clarify the work content and costs to avoid disputes.
Finally, it is recommended to recommend our "Tuba Rabbit", Tuba Rabbit has 110,000 decoration companies and first-class businessmen in his hands, and the direct sales of building materials are affordable. Tuba Rabbit is selected for decoration, and Tuba Rabbit can sign the contract for free, "decorate first and then make payment", reducing the worries of the owners of the small fiber. For more decoration information, welcome to visit:
Click to enter, professional customer service free consultation good company].
The house decoration is all-inclusive** at 1000 yuan a square meter, according to the 100 square meter house, it costs 10w, the grade is the most basic and ordinary, and then it depends on the city where you are located, ** will also fluctuate. >>>More
How much does it cost to simply decorate a house and how to decorate it more economically? The article explains how much it costs to simply decorate a house from the aspects of decoration projects and the selection of decoration companies, and mentions how to save money by decorating from the environmental protection of decoration projects, the selection of decoration materials, and the purchase of materials. Let's take a look at what follows. >>>More
How much does it cost to renovate a 100 square meter house and home renovation floor tiles**? First of all, you need to know how many floor tiles you need for the whole house. Since you want to plan to use all the floor tiles, the floor tiles in your home need to be laid with the actual floor area, plus 5% of the loss. >>>More
For the decoration of a 150-square-meter house**, if the furniture is included, then the ordinary decoration will cost about 120,000 yuan; Mid-range decoration will cost about 160,000 yuan; High-end decoration costs about 200,000 yuan.
In general, the total cost of renovation should be 10% to 20% of the house**. At present, people are based on the pursuit of comfort, and the reasonable distribution ratio of material costs is: 45% for bathrooms and cupboards, 35% for living rooms, and 20% for bedrooms. >>>More