After scraping putty for house decoration, it needs to be left for a few days before polishing

Updated on home 2024-07-13
21 answers
  1. Anonymous users2024-02-12

    As long as the putty is dry, it can be polished, but it also depends on the weather, and it will dry in 2-3 days after the weather is good. In case of bad weather, it is best to wait until 3-5 days have passed, and be sure to dry thoroughly before sanding. It is best to sandpaper for sanding, and there are a few factors to be aware of:

    First of all, the temperature, then the humidity, and the ventilation of the room. It depends on your own situation.

  2. Anonymous users2024-02-11

    Polishing is not a few days, it can only be polished when it is dry. If it doesn't dry the first part well, it's good to polish. Low 2

    It may also be deformed later. Latex paint is also best to dry thoroughly. It should be called a shade dry, and it is not easy to crack the seam of fine lines in the future.

    This worker knows, rest assured, he will help you do it well.

  3. Anonymous users2024-02-10

    Preferably 3-5 days, but be sure to dry thoroughly; To sandpaper it is to be sanded.

    There are a few influencing factors, depending on your situation.

    1. Temperature. 2. Humidity.

    3. The ventilation of the room.

    First, push the anti-alkali and moisture-proof function of the boundary film agent.

    2. Use plaster to make up the yin and yang corners.

    3. The first putty should be thicker, and you can find larger gaps and pits.

    4. The second time it is fine, it is fine, and there is no texture, because this can save you time for polishing.

    360 model sandpaper, sandpaper holder, 200 light bulbs, use the bulb close to the wall, sandpaper fine sanding.

    6. Push the primer first.

    7. After the primer is dry, then push the topcoat, close the window, dry naturally, and open the window to ventilate and remove the odor when it is about the same.

  4. Anonymous users2024-02-09

    It takes 24 hours for each putty to dry, and it usually takes two times to scrape the putty, so, plus the time to polish the putty, it takes three days.

    Putty (mud filling) is a kind of decorative coagulation material that flattens the surface of the wall, is a kind of thick paste coating, and is an indispensable product before paint painting. It is applied to the primer or directly to the object to remove uneven defects on the surface of the object to be coated.

    Scrape the big white putty twice, and then scrape it a second time after the first putty is dry, and it is generally required to survive at least twice. The surface is required not only to be smooth but also to have a uniform texture, otherwise it is easy to have inconsistent color shades and affect the decoration effect.

    The interval between two coats of putty is too short, and the first putty is scraped before it is dry, which is easy to cause dryness and shrinkage, resulting in peeling and peeling.

    Operational Points:

    1. If you originally brushed lime or paint, if you want to brush latex paint, you must first remove the original wall and scrape the putty again.

    2. If you want to paint a colored room, you can directly buy latex paint with color, if you redeem it yourself, you must redeem it at one time, otherwise there is a color difference, of course, the gradual color difference is also a decorative effect.

    3. The quality of the roller brush must be good, the hair quality is moderate, and the density is uniform, which affects the painting effect.

    4. Paint the ceiling first, then the wall.

    5. Be sure to dry it for the first time and brush it again again.

  5. Anonymous users2024-02-08

    Mainly depends on the season and weather, generally in spring and autumn, when the weather is relatively dry, it can be dry in 1-2 days, and it will take at least 3 days in summer, because although the temperature in summer is very high, the surface moisture evaporates quickly, but the humidity is large, so most of the time it is only the surface is dry, and the winter is colder, it takes days to dry, pay attention to if you encounter the rainy season, the time is longer.

    Generally, it is recommended to scrape putty 2-3 times, and you must wait for the previous putty to dry completely before the next step of construction, note that the first putty is dry for a short time, but the second time is relatively long.

  6. Anonymous users2024-02-07

    The whole process of scraping putty takes about a week.

    The process flow of scraping putty for concrete floor slabs and floor joints is as follows: base treatment, base repair, brushing caustic alkali aqueous solution, coating binder (juice slurry, glue spraying) - scraping white putty - repairing and grinding - putty survival. The process flow of plastering cement mortar and paper mortar surface layer scraping putty is:

    Base treatment - coating binder (juice slurry) - scraping large white putty - repair and grinding - putty survival.

  7. Anonymous users2024-02-06

    Scrape the putty at the first time, wait for the putty to dry for the first time, and then brush the putty for the second time, and then wait for the putty to dry and check it, and then refill the putty again. Then scrape the putty again again, this time it is very critical, be sure that the variety is not too thick. Wait until you have the clubhead sanded flat, then apply the paint all over again.

    It is also best to apply the paint three times.

  8. Anonymous users2024-02-05

    It is not to look at the scraping for a few days, but to check how many times it has been scraped and polished a few times, whether it is smooth and smooth. The exact construction time is directly proportional to the size of your house.

  9. Anonymous users2024-02-04

    Hello dear! Glad for your question! How long after indoor putty scraping and sanding is the best time to spray paint:

    1. It is best to paint the putty for 3 to 5 days after polishing, but this is also determined according to the thickness of the putty. If it is at a normal temperature in summer, then it can be dried in one or two days, and it can be painted, and in winter, then it will take at least 4 or 5 days, but this situation is in the case that the putty is not thick, so if you want to dry it in the upper period after the putty is polished, it must be dry thoroughly, and it should be determined according to the humidity, temperature and ventilation of the room. 2. The most important role of putty is leveling, if it is wholesale putty, then this is only half of the recruitment work, and the final decision on the effect is still to be solved by grinding, so polishing is a very important part.

    If it is water-resistant putty, it will become very solid in 5 to 7 days, and if it is sanded at this time, it will become very difficult, so the sanding of water-resistant putty should be carried out when it is semi-dry. 3. If the owner is in a hurry to decorate, then in order to make the putty dry faster, we can ventilate the house, but when the putty is scraped on the first day, the window must be closed, and the window must be opened on the second or third day, but the window must be closed before the night to prevent moisture.

  10. Anonymous users2024-02-03

    Putty three times, then polish and flatten, the specific steps are as follows:

    1 Remove dust.

    2 If there is a place on the original wall that is peeled off with a putty knife, it is difficult to clean 3 The local putty needs to be repaired.

    4 Beat sandpaper.

    Paint the wall again, it is recommended to paint well.

    Technical points:1 If your original lime or paint brush is now a paint brush, you must first remove the original wall surface and scrape the putty again.

    2 If you want to brush the color of the room there are brown paints can be purchased directly, if they are dollars, once must be on the finished product, otherwise the color, of course, is also a progressive color decorative effect,-- if you like.

    3 The quality of the roller brush must be good The hair is medium in length and the density is uniform, which will affect the effect of the paint 4 Brush the ceiling first and brush the wall.

    5 must first pass and draw again (hehe, I've learned, but I'm still brushing wet, the belt hangs down).

    6. Use force evenly.

    7 light brush twice, if you want to have a rich ruby color, brush three times, even before ps: don't forget to cover the floor with newspaper and disposable plastic tablecloths, and look at the eye protection.

  11. Anonymous users2024-02-02

    This depends on whether your wall is waterproof putty or not.

    1.You can test whether the putty powder on the original wall is water-resistant, you can do a simple test, after the water is splashed on the wall, rub it with your hand If you can rub it down, it is a non-water-resistant putty, you must shovel this is a basic work, the foundation is not laid, and when the wall is cracked, it is more troublesome to re-do it. The role of putty is to increase the smoothness of the paint very sticky, definitely to do.

    2.If it can't be rubbed off, it is water-resistant putty, you can consider retaining, and the original wall can be directly draped with putty after polishing. However, the quality of the putty on the original wall is generally poor, and it is easy to crack, peel, and pulverize after directly scraping putty and rolling latex paint, so it is recommended to use gypsum leveling after all are removed, and then scrape putty and then roll latex paint, which is more reliable.

    Suggestion: There is also the original wall putty quality will generally be poor, directly brush latex paint in the later stage is easy to crack, peeling, chalking, etc., therefore, it is recommended to use gypsum leveling, and then scrape the putty and then roll the latex paint, this scheme is more reliable. Regular decoration companies like this basically do this!

    It won't be very troublesome, at least it won't be troublesome to live in the later stage!

  12. Anonymous users2024-02-01

    Mainly depends on the season and weather, generally in spring and autumn, when the weather is relatively dry, it can be dry in 1-2 days, and it will take at least 3 days in summer, because although the temperature in summer is very high, the surface moisture evaporates quickly, but the humidity is large, so most of the time it is only the surface is dry, and the winter is colder, it takes days to dry, pay attention to if you encounter the rainy season, the time is longer.

    Generally scrape putty.

    It is generally recommended to do 2-3 times, and you must wait for the previous putty to dry completely before proceeding to the next step of construction, note that the first putty drying time is relatively short, but the second time is relatively long.

  13. Anonymous users2024-01-31

    Under normal circumstances, no one can be accurate about how long it can be polished.

    It depends on the thickness of the putty, if the wall is uneven and the putty is used too much, the drying time will be increased accordingly; There is also depending on the weather, if the weather is sunny and the temperature is high, the putty will also dry faster, if it is in a rainy day, the air humidity is high and the temperature is low, then the putty is not easy to dry at this time; Under normal circumstances, the thickness of the putty is uniform and the weather is good, and the drying time of the putty is about 2 days before it can be polished.

    Under normal circumstances, the construction of the first layer of putty is 3 days, and the drying period is about a week; The construction of the second layer is about 2 days, and the drying period is 3 days; The third layer is finely processed for about 2 days, and the drying period is also 2 days, and it can be polished.

    The villa master provides you with local building policies, building drawings, and villa design drawings;

    Villa appearance renderings service, thousands of popular drawings for you to choose.

    Villa Master.

  14. Anonymous users2024-01-30

    This should be like this, when you use a putty scraper to scrape the last putty, it is inevitable that there will be some smears and edges, which should be sanded with sandpaper, and these can only be painted after they are flattened.

  15. Anonymous users2024-01-29

    Grinding and smoothing is a necessary process.

  16. Anonymous users2024-01-28

    After scraping the chair, it must be sanded before it can be painted, otherwise it will not be smooth.

  17. Anonymous users2024-01-27

    1-2 days. It also depends.

    Look at the thickness of the user's scraping putty, under normal circumstances, it is estimated to be one to two days dry at the normal temperature in summer, and it is estimated to be 4 to 5 days in winter (the temperature is about 15 degrees), but the grinding does not need to be dry, pay attention to the putty not to be too thick.

    In order to make the wall flatness higher and the surface more delicate and uniform, the putty is polished, and the wall polishing is not only related to the final flatness of the wall, but also an important means to solve some minor defects in the wall decoration. Although the main function of putty is leveling, it is only a batch of putty, only half of the leveling work is done, and the other half is also half of the final effect, which should be solved by grinding.

  18. Anonymous users2024-01-26

    Polishing is not a few days, it can only be polished when it is dry. If it doesn't dry the first part well, it's good to polish. Low 2

    It may also be deformed later. Latex paint is also best to dry thoroughly. It should be called a shade dry, and it is not easy to crack the seam of fine lines in the future.

    This worker knows, rest assured, he will help you do it well.

  19. Anonymous users2024-01-25

    Preferably 3-5 days, but be sure to dry thoroughly; To sandpaper it is to be sanded.

    There are a few influencing factors, depending on your situation.

    1. Temperature. 2. Humidity.

    3. The ventilation of the room.

    If you can't be sure, it's best to find a master to help you look at it before doing it.

  20. Anonymous users2024-01-24

    As long as the putty is dry, it can be polished, depending on the weather, generally if the weather is good, it will be dry on the second or third day.

    Once sanding, you can apply the primer. Apply the primer 2 times so that you can brush the topcoat. If you want to be better, you can brush it to the bottom 3 times, and the surface will be like this 3 times.

  21. Anonymous users2024-01-23

    Generally, the weather will dry in 2 to 3 days, and it must be dry before you can apply latex paint.

Related questions
9 answers2024-07-13

Generally, the wall can be scraped with putty 2 times, the wall with poor flatness needs to be scraped several times, and the more serious ones need to be leveled by gypsum first, and each putty batch scraping needs to be more than 2 hours. >>>More

26 answers2024-07-13

The moisture content of the base layer is too high and the density is too large or too small. Because it contains abundant voids and the putty has a high moisture content, it is not breathable, and the air is enclosed in the void cavity and is not easy to eliminate. >>>More

26 answers2024-07-13

When decorating, it should come firstScrape puttyThen install the bedroom door, because scraping putty is easy to contaminate the bedroom door andDoor casing, and the installation of the door will not cause pollution to the putty on the wall. >>>More

22 answers2024-07-13

When doing interior decoration, in general, we will do the putty work on the wall first and then install the bedroom door. This sequence is mainly based on the logic and efficiency considerations of the renovation project. >>>More

18 answers2024-07-13

Door-to-door installation of furniture cabinets, after the overall interior decoration is completed. When decorating the wall, it is impossible to follow the area of the cabinet, and the wall behind the cabinet will not scrape putty. >>>More