-
The assumption of legal liability for this type of tort is relatively complex, and it is necessary to distinguish between different circumstances and make different determinations of liability. I'll divide the situation, I don't know if I can help.
Clause. 1. The owner or manager or user of the canal shall not be liable if it is in an agricultural production area and is inherent or necessary to be erected and is in a position that is generally considered reasonable.
Clause. 2. If it is in an agricultural production area, a temporarily excavated watering canal shall be set up with obvious signs or warning signs, otherwise it shall be liable for causing others to do so.
Clause. 3. If it is in a non-agricultural production area, whether it is an inherent or newly excavated watering canal, a clear notice or warning sign should be set up, otherwise it will cause others to be held responsible.
As for whether there are other circumstances, I will not repeat them. The responsibility and the magnitude of the responsibility depend on the specific circumstances of the case.
If the above answers are not used, please inform the details of the case before answering. For example, the location and purpose of the canal, the time of excavation, the owner, manager and user of the canal, the management and maintenance of the canal, the occupation and age of the victim and a brief history of the incident.
-
In the event that the beneficiary of the canal is at fault, compensation shall be payable according to the extent of his fault.
-
Those who fail to provide a considerable duty of care shall be liable.
-
If there is no clear reminder sign, there will definitely be civil liability.
-
Believe in facts, don't believe in dreams, hard work is rewarding
-
It's supposed to be going to make a fortune, you can't stop it. If you go out and see, you may get rich.
-
You have to go out into the field every day to water and leave in your mind the impression that you have to water every day. When sleeping, the image is repetitive, and the brain is exaggerated. Maybe you are often afraid that the field will dry up, so go to water, and if there is too much water, you will leave it in someone else's field.
-
It is a neighboring right dispute, whether the drainage of your neighbor's house must pass behind your house, and if so, it should be able to dig a ditch for drainage, but you should be compensated appropriately, if it does not have to pass behind your house, you can ask him to compensate for the losses caused to you by its infringement.
-
If the length of the canal is metre, there is;
Dig x (200*4) meters per person per day.
Every 2 excavators dig x meters per day.
80 people and 2 excavators dig at the same time, and it can be dug every day.
x (200*4)]*80+x m.
Then the number of days t required is.
x }.
t=2 days.
-
Landlord, you didn't finish the question!?
-
If the site conditions allow, ride on the ditch to dig, and see the ditch that has been dug in the distance to make a straight extension and continue to dig back. Don't look close.
-
Ditch dredging and ditch excavation construction sequence: construction preparation, measurement and lofting, ditch drainage, mechanical combined with manual excavation, manual slope trimming, completion acceptance.
Ditch dredging construction method:
Dig a longitudinal drainage ditch on the outer side of the silt of the drainage backbone ditch to make the water return to the trough, and pile the earth on the edge of the trough to form a ridge, so that a small amount of river water can be drained through the trough. When dredging, they are cleaned sequentially from top to bottom or from bottom to top. The drainage backbone ditch excavation lot, day, night vehicles can pass, so according to the amount of silt and the construction period reasonable arrangement of dredging construction, there is no large traffic road along the pond road, and some road sections are in poor condition, not convenient for earth-moving vehicles to pass, dredging efficiency is not high, therefore, need to consider increasing transport vehicles and consider night construction.
When dredging the river, the river silt is first dug and transported ashore by hand, and then excavators, loaders and automobiles are used to clean and transport the dredging earth. When the silt was removed, people were immediately sent to clean up the earthwork scattered on the road, so as to give the surrounding residents a good living environment. The drainage backbone ditch silt of this section can only be manually dug silt, and then manually transferred to the top of the slope of the green belt, and finally transported out by the transport machinery, according to the measurement, this part of the engineering quantity accounts for 40% of the total engineering volume, and we consider using excavation machinery to directly open the ditch for silt dredging, but the whole section of the river is not under the hippohorse road, considering the use of silicon blocks to lay the temporary hippocampus road at the appropriate position of the river, according to the site situation, the lower hippocampus needs to be set up 3 places, after the completion of the riverbed silt removal, The hippopotamus road is removed by manual demolition.
Trench excavation construction method:
The ditch adopts the method of manual excavation and excavator ditch end excavation for construction, and the construction should be strictly in accordance with the elevation, axis control pile inspection, and its elevation, ditch geometric size, slope should meet the design requirements. And when approaching the bottom elevation of the ditch, manual cooperation is used to trim to avoid over-digging. Before the ditch excavation, the control level plate should be used to review the center line, edge line and slope of the pipe trench, and the excavation can only be carried out after confirming that it meets the design requirements.
When excavating, check in strict accordance with the control pile to ensure that the elevation and slope meet the design requirements. When the ditch is excavated to the bottom of the ditch, the temporary pile control elevation is added at the bottom of the ditch to prevent the destruction of the natural soil layer due to more excavation, and the 100mm deep soil layer can be left when digging close to the elevation is not dug temporarily, and the bottom is leveled when the concrete soil is constructed at the bottom of the ditch. When excavating, the distance between the mound and the machinery from the edge of the trench should be kept at 1m to ensure the stability of the slope.
-
The act should be motivated, and if the consequences are unforeseeable, they will not bear legal responsibility, they will be legally responsible if they may cause adverse consequences and let them occur, and they will be legally responsible if they intentionally cause adverse consequences. The first case is comparable. In the second case, if you are not present, you are only responsible for your friends, and if you are present, the same analysis is the same.
Of course, this food cannot exceed the edible range, if the thing is harmful, you need to be legally responsible.
-
It's all accidents and irresponsible, unless the thing you give is actually a secret weapon that chokes people to death, then it's called intentional homicide!
-
Although I don't know any laws, there should be no joint and several liability for this. The reason for "choking to death" is still more personal, just like selling a car to someone, and a person accidentally drives and gets into a car accident, should the responsibility for selling the car be investigated?
-
It depends on the ability of the person who eats it.
-
If the enterprise becomes insolvent as a result, it should be held liable.
-
As long as you do not commit the acts specified in Article 46 of the Marriage Act, you do not have to compensate him for any loss.
It is not that whoever files for divorce has to compensate the other party for losses, this is just a misunderstanding among the people.
Beijing Marriage and Family Lawyer.
-
Hello, you can ask a lawyer.
-
The dissolution of marriage itself is a legal responsibility that you bear.
Generally, it also includes the division of the joint property of the husband and wife, the assumption of joint debts, and the maintenance of legitimate children.
-
Your question is too broad.
Be more specific.
PS: Don't pay compensation Article 46 of the Marriage Law only stipulates that compensation should be made in 4 circumstances - bigamy, concubinage, domestic violence, and joint or abuse of family members, where the circumstances are serious.
Don't pay for anything else, why does your husband want money and don't have feelings. Yikes
-
How can it be. No, it depends on how much money you have after marriage. This court will investigate ...
Before marriage does not count. And that's customary. Men are obliged to take responsibility.
Of course, if he didn't sign it, or didn't find out that he violated the law of conjugality. Your lawsuit is also invalid.
-
The law says that divorce is negotiated between the two parties, not that he can do whatever he wants!
-
1. Both parties agree to divorce, both parties bring their household registration booklets, ID cards, marriage certificates, sign a divorce agreement, and go to the marriage registration authority where one party's household registration is located to register the divorce.
2. If one party does not agree or cannot reach a divorce agreement, he can only sue the court and ask for a divorce.
3. If you need help, you can call or make an appointment to consult me in person.
Lawyer Zhang Xiangfeng.
-
Freedom to marry. Divorce is also your right, and you don't have to bear any legal responsibility for it.
Lawyer Gao Yongfeng.
The excavator has added a method for the treatment of diesel with water: >>>More
There are many skills, the most important point is that the excavator must be flat on the road, and when the excavator is rotating, there must be leeway, pay attention to safety. There are leveling skills, slope brushing skills, road repair skills, ditching skills, and some work experience skills, ways to do things, you are asking for skills, I will give you an outline, you can ask me privately for advice.
Originally manual, the excavator has been more than 130 years since its invention in 2013, during which it has experienced a gradual development process from steam-driven bucket rotary excavators to electric-driven and internal combustion engine-driven rotary excavators, and fully automatic hydraulic excavators applying mechatronic and hydraulic integration technology. The first hydraulic excavator was invented by the Poclain factory in France. Due to the application of hydraulic technology, in the 40s of the 20th century, there was a hydraulic backhoe ground suspended excavator equipped with a tractor. >>>More
Well, a brief description of my personal opinion :
1. Internal and external sales: small excavators are mainly used for small projects and municipal construction, and the internal and external advantages lie in the quality and market, rather than one-sided words to decide, the most important thing is the market. >>>More
Excavator and loader school is to teach you the basic operation essentials, you can't stay in school for a year or two, so you need to improve your technical proficiency outside of school. But these schools can teach you more comprehensive knowledge essentials that you can't learn in person. I want to ask, is it better to learn excavators in school, or to learn from the master? >>>More