-
It should be strict during the inspection, and once there is a problem, it will not pass.
-
If you have a problem with the quality of the house, you can see if it is written in the contract, and generally the contract can protect the rights of Party B, and you can choose to sue the other party.
-
Should the accountability system be chosen, who will do the work? If the problem persists after many years, the person concerned can be held responsible.
-
Now there is no other way, but to lose money, let the developer reinforce the wall for you, remember: when reinforcing the wall, to hang the steel mesh on both sides, when the thickness is more than 40mm, Slag Zhensen should be poured with fine stone concrete not less than C20.
1. What are the skills for house demolition and renovation?
1. The main body of the house is demolished and renovated to ensure safety.
When the main body of the house is demolished, it is necessary to ensure the safety of construction, and the walls where the door openings of many old houses are generally located are load-bearing walls, and these walls are absolutely not allowed to be transformed.
2. Do not change the sewer pipe network indiscriminately.
The demolition and modification of the sewer pipe network is also common in the demolition of houses, and it should be noted that the sewer pipeline of the toilet should not be changed as much as possible, because the sewage pipe will have very higher requirements for the drop and pipe angle.
3. Don't dismantle the counterweight wall.
The counterweight wall refers to the wall of the balcony and the indoor space, generally there is a door and a window, the doors and windows of the wall can be demolished, but the wall below the window can not be removed at will, because the counterweight wall plays an important role in provoking the balcony.
2. Exterior wall insulation construction specifications and acceptance standards.
The acceptance of exterior wall insulation construction can be divided into the main control project and the general project, and the acceptance methods and standards are as follows: 1. The main control project 1, the materials used in the insulation system must meet the design requirements and the relevant provisions of this regulation; 2. The thickness of the insulation board and the structure and details of the insulation system should meet the requirements of building energy-saving design, and the allowable deviation of the thickness of the insulation layer (design thickness is) is +, 3. The insulation layer must be firmly bonded between the wall; 4. The plastering glue and the insulation board must be firmly bonded, and the surface layer must be free of defects such as ash blasting and cracks. 2. General project 1, alkali-resistant mesh should be laid tightly, the lap width should not be less than 100mm, and the alkali-resistant mesh should meet the design requirements of the reinforced part; 2. The surface of the insulation layer and the plastering layer should be smooth and clean, and the line angle should be straight and clear; 3. It is necessary to pay attention to the allowable deviation of the installation of the insulation board, such as the difference per mu and the allowable deviation of the plastering layer.
3. What engineering projects can be undertaken by construction labor subcontracting qualifications.
Construction labor subcontracting qualifications are divided into carpentry, masonry, plastering, stone, steel bar, formwork, concrete, sheet metal, painting, scaffolding, welding and other professional labor subcontracting qualifications.
Each labor subcontracting qualification is divided into labor subcontracting level 1 qualification and level 2 qualification.
Take the steel bar labor subcontracting qualification as an example:
First-class enterprises: can undertake all kinds of engineering steel bar binding, welding operations subcontracting business, but the contract amount of a single business does not exceed 5 times of the registered capital of the enterprise.
Second-level enterprises: can undertake all kinds of engineering steel bar binding, welding operations subcontracting business, but the contract amount of a single business does not exceed 5 times of the registered capital of the enterprise.
-
Lawyer's analysis: The arrest letter for a suspect is generally decided within seven days of the procuratorate receiving the application. The people's procuratorate shall make a decision to approve or not to approve arrest within 7 days of receiving a written request for approval of arrest from the public security organs.
Legal basis]:
Criminal Procedure Law of the People's Republic of China》 Article 91: Where a public security organ finds it necessary to arrest a detained person, it shall request that the people's procuratorate He Song review and approve it within 3 days of the detention. Under special circumstances, the time for submitting a request for review and approval may be extended by one to four days.
For major suspects who have committed crimes on the go, committing crimes multiple times, or committing crimes in groups, the time period for submitting a request for review and approval may be extended to 30 days.
The people's procuratorate shall make a decision to approve or not to approve arrest within 7 days of receiving a written request for approval of arrest from the public security organs. Where the people's procuratorate does not approve the arrest, the public security organs shall release them immediately after receiving the notice, and promptly notify the people's procuratorate of the execution situation. Where it is necessary to continue the investigation and the requirements for release on guarantee pending further investigation or residential surveillance are met, they are to be released on guarantee pending further investigation or placed under residential surveillance in accordance with law.
First of all, the act of contracting the brick-knocking business to the brick-knocking company by yourself is a contractual act between the two parties, and cannot be regarded as a work-related injury, because you have not established an employment contract relationship with him. >>>More
Of course not, you look at the sandpaper flat, in fact, it is still far from the flat (take a flashlight and shine it from top to bottom or from bottom to top). Besides, putty is not just leveling, putty is elastic and can cover small wall cracks, but the paint can't cover it. Moreover, putty is so cheap, why not use it. >>>More
In fact, after remodeling the house. New houses do not renovate water and electricity. In general, we smash the walls in the original decorative order, and change the water and electricity in two orders. >>>More
Depending on personal needs, the putty will fall off the powder, and the putty is dirty and not easy to wipe and brushLatex paintIt can solve the problem very well. >>>More
One of my things is this, as long as the wall is flat, basically you can put wallpaper or paint after polishing, and the average family should reconsider decoration or wallpaper, painting, etc. after about ten years. I did this before moving in, and there was no problem for five years, and I could also brush the water on the wall to see if there was a bubbling after a few days, as the first floor said, and it was okay if there was none.