-
Why do you have to smash walls and change water and electricity when you renovate a newly bought house? What is the reason? Because the original water and electricity location cannot meet the existing decoration requirements. For example, the size and position of furniture beds, or changes in the size and function of rooms, can affect where water and electricity are used.
1.When the developer designed the house type, it must have been designed uniformly. At least every floor of the same unit is the same.
If everyone lives on each floor, everyone's preferences and requirements are different. Of course, the specific design still needs to be verified by the property. Some walls can be broken, while others cannot.
As for water and electricity retrofits, that's almost a must, because it's impossible for a developer to take into account all the electrical circuits and water lines in your home, and it's the same situation in every household.
2.No one is forced to smash the wall to change the water and electricity, and the water and electricity are completely in line with the regulations if the wall is not smashed. On the contrary, many users do not meet the standards after transformation.
The scientific name is "subject transformation". It is to modify the layout of the house and change the number, location, and area of the rooms by smashing the wall and building the wall. Everyone has their own requirements for the type of house.
Maybe I need three bedrooms, but you only need two. Maybe I want two bathrooms, but you only need one. At this time, it is necessary to use the main body transformation to turn the house into our ideal appearance.
The main body transformation is not necessary. If the existing house type can meet you, there is no need to do the main transformation.
3.The original water and electricity location could not meet the existing renovation requirements. For example, the size and position of furniture beds, or changes in the size and function of rooms, can affect where water and electricity are used.
Although the original hydropower location can also be used, it is more convenient to use after modification; In addition, the existing water and electricity can meet the basic needs. The current electrical equipment, network requirements, and personalized use requirements cannot meet the original hydropower location, and hydropower transformation is required.
4.The more common ones are raw water roads, whether they are kitchens or bathrooms. It only has cold water pipes and no hot water pipes.
Some houses even have only one cold water pipe outlet in the bathroom, which definitely does not meet the requirements for use. For example, toilets and water heaters do not have cold water pipes. These are all things that we need to do when we decorate.
From the perspective of waterways, when building houses, developers only ensure that water and electricity can be used, and generally do not care about the quality of water and electricity. In the initial stage, the quality of water and electricity is sometimes not up to the standard and the service life is very short. After a long time, water often leaks, and for our subsequent convenience, we have to change the water and electricity.
-
The main reason is that when the house is just built, all the water and electricity are installed in a unified manner, so sometimes there is no way to meet the living needs of different people, so when we decorate, we must remove unnecessary walls and change water and electricity according to personal needs and lifestyles.
-
Because when building a house, in order to reduce the cost, you will choose a water pipe with a bad product, and secondly, you have to decide that there must be a water pipe at home according to the needs of your family, and you must have a socket at home, and arrange a pattern you like.
-
In this way, we can make the house look like we want, so that the owner is very satisfied, and the ideal effect can be achieved in the future design.
-
It is necessary to decorate in this way to avoid water and electricity problems in the future.
-
Is it because the water circuit made by the developer cannot be used? Of course not! In fact, during the hydropower renovation, most of the users retained the waterways provided by the developer.
On the other hand, the quality of the water pipes and wires provided by the developer is basically up to standard (especially in the market), and even better than some of the products purchased by the users themselves. Hydropower is not "hydropower", it is just the original water circuit - the hydropower points provided by the developer are fixed, and users need to change the number and location of these points according to actual needs to make it more practical. A few simple examples:
There's only one socket somewhere, and we need a couple of appliances here. <>
So here you need to add a couple of sockets, the switch is somewhere inside the door, I want to change it outside the door, there is a single switch somewhere, I want to change it to dual control, the faucet is somewhere in the south, I want to change it to the north - these are all needed for the hydropower retrofit. When the house is first renovated, the house is generally just a frame, and it is most convenient to repair the walls first. If the water and electricity are built first and then the wall, all kinds of complex water and electricity lines will hinder the subsequent construction of the bricklayers.
Next, let's compare the advantages and disadvantages of the phase building method before making a judgment. When the house is just about to be renovated, it is generally just a frame. <>
Therefore, at this time, it is the most convenient time for the bricklayer to build the wall first, and after the construction of the wall is completed, the hydropower project will be carried out. At this time, the positioning of the water and electricity wiring will be more accurate, which is conducive to the setting of various household sockets and power supplies in the later stage. However, there are also some drawbacks to building walls first and then hydropower.
In accordance with the order of construction of home improvement.
The bricklayers were the last to enter. If you want to build the wall first, you need a bricklayer to enter the site a second time, which will increase the construction time and cost. If you choose hydropower wiring first, you can shorten the construction period, save the second entry of bricklayers, and also save a lot of engineering costs.
However, the first hydropower wiring will hinder the follow-up bricklayer to build the wall to a certain extent, and the bottom box of the hydropower line can only be positioned and installed by the follow-up work of the bricklayer, which sometimes affects the later painting construction, which is obviously unreasonable. <>
-
Because smashing the wall can be transformed according to your own decoration style, you can also make the space look bigger, change the water and electricity because the structure of the rough house is not very good, you need to increase or decrease some sockets according to your own living habits and hobbies, and when you decorate the newly bought house, smashing the wall and changing the water and electricity can improve the quality of life in the future and can also provide a lot of convenience.
-
Because the water and electricity structure of the rough house is not good, it is necessary to carry out water circuit transformation during the decoration to make it more comfortable to live in the house after the decoration, and the wall is to expand the space of the house, which is in line with the decoration style of the house.
-
Because this is the most efficient way, and it is not a load-bearing wall, but an ordinary wall.
-
In fact, after remodeling the house. New houses do not renovate water and electricity. In general, we smash the walls in the original decorative order, and change the water and electricity in two orders.
The purpose of smashing the wall here is to set up the original situation and allow yourself to live a comfortable life, and design according to your own life requirements. Why do you want to tear down the walls and renovate the water power when you renovate a newly bought building? But there is a misunderstanding here about the renovation company, does it have to break the wall after the renovation?
Does hydropower need to change.
In fact, this is not the case. If you get a new house, you are more satisfied, and the current situation, the design of the water and electricity equipment is also very satisfied. It does not need to be completely crushed, nor does it require special changes in hydropower.
The key is to listen to whether you can be satisfied with the existing house. If you haven't met your life's requirements, you can not break the walls or change the water and electricity lines. This can still save some money, and the renovation time can also be greatly reduced.
The new house you choose is itself a rough house, and you can do it without breaking the walls. Hydropower can also be reinstalled on its own. But in real life, we're basically going to smash walls.
Because the apartments designed by the developer are all uniform. Each of us has different preferences and requirements for housing. In order to save money, according to the previous situation, living in a situation that tortures and dislikes you, then you will not be happy in the future.
So, even if you want to, it's better to smash the walls, smash the new house, and remodel the water, but what we can be sure of is that after the wall is demolished, it must go through the review of the real estate.
Because some walls can be blocked, and some walls cannot be hit. For example, you can't touch the main beam. Doing something wrong can affect building safety.
Tearing down walls for water and electricity, this is related to demand. After the developer moved into the park, it basically realized a standardized and lower-cost layout, and it is a rough house that takes into account the interests of manufacturers and real estate. However, in the actual decoration use, because the effect of advocating and ensuring varies from person to person, destroying the wall and changing the water and electricity has become an optional project.
Now the water and electricity are dark lines, smashing the wall to change the decoration of the hydropower house, one is for simplicity, does not affect the layout of other decorations, and the other is due to the role of fixed rules, you can see the layout of the drawings to locate the old wires, and there will be no more chaos.
-
First of all, because the original house type is not suitable for the current people, and they are not very suitable in terms of circulation, so the transformation between the layouts can make the future residence more comfortable, more in line with their own minds, and can make full use of every inch of space.
-
Because the routes of water and electricity are all dark lines, they are all inside the wall, so when decorating, the wall must be smashed to change the water and electricity.
-
The main reason is that if we don't smash the wall and modify the water and electricity, it may become an indispensable thing in our lives in the process of living in the future. And it is also very inconvenient to maintain.
-
If the real estate developer pre-embeds that little bit of the house, it will actually increase the overall cost budget, so a little raw material is really not a problem for a house, but the design drawings will be time-consuming. In fact, it is more convenient to hand over the overall construction to everyone in the middle and later stages of the real estate chamber of commerce. After pre-embedding the shoe rack into the wall, the real estate developer must do that part of the whole brick with thousands of half bricks, and the whole brick is built into half a brick, and the master of the wall is not only inconvenient for half, so the inconvenience can only be handed over to the buyer.
This is obviously not as good as the real estate developer should be, and the door leaf can be made lower.
Unnecessary chiseling will not fall into the disadvantage of easy cracking in the future. Since the door has to be closed again and again, the whole process must be forced, so it is not appropriate to crack the time other than "afternoon", and it is not a matter of time. For smashing the door leaf is also a humanized pursuit of perfection, this situation usually appears in the customer has the requirement to change the direction of the door; Recently, "Brother Hua" touched the owner of a community, and the entrance door happened to be facing the door of the master bedroom.
First of all, let's talk about smashing the wall, whether it is the frame structure of the newly bought house, or the double-layer masonry, the wall cannot be smashed at will. The real estate company has designed the separation of room types and the separation of dynamic and static through discussions and improvements, and it is to meet the requirements of most people in the sales market. In all engineering buildings, the wall has both a longitudinal load structure and a separation of different application spaces, which is important for structural safety hazards.
The newly bought house hydropower project is also pre-embedded according to the design standards and application needs.
It can completely meet the normal daily life regulations of most people, and if the house you ordered is actually a rough room, then although you did not smash the wall, the hydropower project also has to be assembled again. But in real life, almost everyone has to smash the wall. Since the real estate developer designs the house type, there is no doubt that all the house types are uniform.
Everyone has different preferences and rules for housing. If you follow the previous layout for better convenience and cost-effectiveness, and live in a layout you don't like very much, then you won't be happy in the future. It must be corrected.
At the same time, in the whole process of decoration and hydropower transformation, if you do not understand the original system software, there are usually various potential safety hazards.
-
Because developers design the house type uniformly, sometimes all the floors of each unit are the same, but everyone's preferences and requirements are different, so after the consent of the property, these owners will renovate the house according to their own ideas.
-
The renovation of the water and electricity is to be safer, the renovation of the water and electricity is also to facilitate our use, and the smashing of the wall is to make the style of this house more in line with our preferences.
-
When the newly bought house is renovated, the route of water and electricity will be buried in the wall, and it is necessary to modify it according to the actual situation, and also change the route according to the decoration style and the use of sockets.
-
No one mandates that walls must be smashed and water and electricity changed, and no walls and water and electricity are completely in line with the regulations - on the contrary, many users do not meet the standards after renovating.
Smashing the wall, the scientific name is "main body transformation". It is to modify the layout of the house and change the number, location and area of the room by smashing the wall and building the wall.
Everyone has their own requirements for the floor plan, maybe I need three bedrooms and you only need two. Or maybe I want two bathrooms and you only need one. At this time, it is necessary to use the main body transformation to turn the house into our ideal appearance.
The main body renovation is not necessary, if the existing house type can already satisfy you, there is no need to do the main body transformation.
The scientific name of hydropower is "hydropower transformation". It is to change the location and quantity of the original water circuit in the room through renovation.
Hydropower renovations are almost always done, as the existing water circuits in the room often do not meet the demand.
Can't you design a house in one step? I really can't!
Main renovation: It is impossible for developers to tailor the apartment type for each of us, so they can only make a house type that can meet the needs of most people (a house type with good sales), or a house type with strong transformation (less load-bearing walls).
We bought a similar type of house to the ideal, and then did a small amount of main renovation during the renovation to get the house type we wanted.
Hydropower transformation: on the one hand, there is a cost problem, the current national standard is implemented in 2012, do not underestimate the past few years, the development of the number of household appliances is advancing by leaps and bounds.
For example, the national standard stipulates that there are no less than 3 sockets in the living room and no less than 2 sockets in the bedroom – obviously, the number is too small and far from enough.
However, the national standard is stipulated in this way, as long as the developer is qualified, it is enough, and there is no need to increase the cost and design more sockets.
On the other hand, there is the problem of location, which means that even if the developer installs a few more sockets for you, it may not be suitable. Take the sockets on both sides of the head of the bed as an example – the width of a normal bed is that the width of a upholstered bed may reach. The window is wider, and the spacing between the sockets on both sides of the bed head should also be increased.
Without knowing how wide your bed is, it can be difficult to design the exact location of the outlet. In other words, even if you have more sockets, you may need to remove them and relocate them again – and there are more wire connectors, which poses a certain threat to safety.
The last point is the issue of safety - as I mentioned at the beginning, it doesn't meet the standards after the retrofit. In the national standard "J1193-2011", it is stipulated that a branch circuit breaker can control up to 10 sockets. Think about the actual needs of our home, there are only 10 sockets in each room, is it enough?
In fact, after remodeling the house. New houses do not renovate water and electricity. In general, we smash the walls in the original decorative order, and change the water and electricity in two orders. >>>More
This may be consistent with some ancient sayings, which have no scientific basis, but can also mean something bad.
Decoration is very important for many homeowners, after all, after spending so much money to buy a house of their own, if the decoration is not good enough, living is not comfortable enough, it will make you feel very lost. Many people like to paint their walls white because it adds space and makes them appear brighter during the day. So, in a newly renovated house, what color furniture looks good with big white walls? >>>More
Let's first understand what wall tiles are and what floor tiles are, because the most we usually talk about are tiles, whether it is wall tiles or floor tiles, they can be collectively referred to as tiles. The main difference between wall tiles and floor tiles is the water absorption rate, which belongs to ceramic tiles, and its water absorption rate is greater than 10%. >>>More
If it is a newly renovated house, it may be the cause of excessive formaldehyde, the concentration of formaldehyde in the air is too high, which exceeds the capacity of the plant, causing the leaves to turn yellow and fall and appear black spots, which will cause death in severe cases.