The decoration is to install the floor first, and there is a specific basis for theory and practice.
Installing the floor before installing the door can accurately ensure the gap between the door and the floor. If you install the door first and then install the floor, you will be afraid that the gap between the door and the floor will be large or small, then you will have to ask the wooden door manufacturer to adjust it again. While it is possible for skilled and experienced installers to reserve dimensions by informing them in advance of the thickness of the floor, any project is variable, and large sizes can be ugly and not soundproof; If it's too small, there's a chance that the door will hit the floor; Secondly, there is a possibility that the rear door will sink slightly because the gap is too small or the floor will rub against each other.
I believe that everyone does not like the gap between the door and the floor is too large, which is not breathable and soundproof, just keep the appropriate gap.
Installing the floor before installing the door can avoid the installation difficulties caused by various special angles and sizes that often occur when the floor needs to be inserted under the door frame or the door edge, so as to avoid the helplessness and harm of removing part of the ground lock when the floor is normally inserted under the door frame or the door edge, because once the floor loses the lock, it is easy to warp or produce mutual cracks; Install the floor first and then install the door, which can ensure that the door frame or door edge is easy to press on the floor, and the gap is uniform and small. In this way, the gap between the door frame or door edge and the floor is coated with glass glue, which will form an elastic contact to ensure that water will not penetrate into the crack of the door frame or door edge to deform the door frame or door edge, which is beautiful.
As we all know, whether it is a wooden floor or a tile floor in the home environment, a basic requirement is the flatness, except for the bathroom, the floor in almost all spaces is the same height. Ground leveling is a complex process, generally based on the high point that can not be lower indoors, and the whole house is leveled. And if we install the door first, there may be some problems with leveling in order to ensure that the gap between the door and the floor is even.
Without the interference of the door, natural indoor leveling becomes relatively simple. The above is the answer to the question of whether to install the floor or the door first for decoration, and whether there is any specific basis.
-
Lay the floor first. It is recommended to lay the floor first and then install the door. If the order is reversed, there is no specific size for the distance, so the installation effect cannot be guaranteed.
The gap is not beautiful and will be exposed, so laying the floor first can avoid the installation problem of the door frame caused by special size or angle adjustment problems, and better adjust the gap between the door and the floor. Once the floor is laid, the contact between the door cover and the floor is perfect. Glass glue is applied directly to the gap to form elasticity to ensure that moisture penetrates and does not deform the door frame.
-
There is no certain standard for this, mainly depending on the convenience of your own home decoration, you can lay the floor first or install the door first, but to ensure that the size of the gap between the floor and the door is appropriate.
-
In general, the floor is installed first, and the most important thing is to communicate with each other to determine how to install it is the most time-saving.
-
Install wooden floors first.
Procedures for renovation:
1. Enter the room, tear down the wall, and build the wall.
2. Bathroom, kitchen floor do 24 small blind limb code closed water test to see if there is water leakage.
3. Chisel the trunking and get the water and electricity.
4. Concealed hydropower renovation project of sealing and burying trunking, and waterproofing projects began to be done without seepage and hunger leakage in the closed water experiment.
5. Bathroom, kitchen with wall magnets, floor tiles, solid wood or composite wood flooring, waterproof marble strips, pay attention to protect the floor.
6. Next carpentry, hanging ceiling, gypsum corners.
7. Cover the door and the window. Make a wooden cabinet frame that grinds it.
8. Synchronous production of various wooden doors, modeling doors and flat pressing.
<> case of buying doors and floors, you may consult the ** business, and the reply you get is all human factors, and your own goods should be installed first. Regarding this problem, we can analyze it together and see what advantages and disadvantages there are in the first door installation and first installation flooring. >>>More
There are no hard and fast rules, according to the conventional construction process, if the home is to pave the floor tiles, then it is necessary to lay the bricks first, if the door is installed first and then the floor tiles are pasted with the water used to print the door cover. >>>More
Generally, the door is installed after laying tiles first, and if the order is wrong, the installed door may not be easy to open.
As we all know, whether the floor in the home environment uses wood flooring or ceramic tiles, a basic requirement is flatness, and it is a height in almost all spaces except for the bathroom. Floor leveling is a more complex process, generally according to the indoor height can not be lower, the whole house is marked and leveled. If we install the door first, there may be some leveling issues to ensure that the gap between the door and the floor is even. >>>More
During the renovation process, in general, we will lay the flooring first, and then install the wardrobe. The main reasons for this are as follows. >>>More