Tile or install the door first? What are the implications of the wrong order?

Updated on home 2024-07-04
20 answers
  1. Anonymous users2024-02-12

    Generally, the door is installed after laying tiles first, and if the order is wrong, the installed door may not be easy to open.

  2. Anonymous users2024-02-11

    The entrance door should be installed first. If the order is wrong, it will lead to the replacement of the entrance door in the later stage, which will make the master do the work of rework, and some tiles will be wasted.

  3. Anonymous users2024-02-10

    The door should be replaced first, and then the tiles should be laid, so that the tiles and the baseboard of the door can be better blended together. If the order is wrong, it will lead to a damage to the door, and it will also lead to ventilation, resulting in a very cool home, which will lead to a poor environment in the future, which may cause damage to the floor.

  4. Anonymous users2024-02-09

    Problems with tiling and installing doors.

    There will be a lot of problems when we decorate ourselves, that is, we often don't know what comes first, and once the order is reversed, we will rework, which will be very troublesome. Especially in the process of laying tiles, many people don't know whether to install the door or lay the tiles first? So today, let's talk about whether we should lay tiles or install doors first?

    Order.

    When we lay tiles on the ground, we need to do a ground leveling. The tiles can be paved only after leveling, so that the overall effect of the tiles can be the best, and there will be no stumbling. Then if we install it before the tile is applied, the door is installed first.

    Ground leveling has become a problem, you must know how to fill in between three centimeters and five centimeters when laying tiles on the ground. Because the ground is full of potholes, there are some uneven places, so in order to fill in the whole, it is necessary to reserve such a size. If the door is installed first, then we will not be able to lay the tiles.

    The reason is also very simple, that is, there is no way to level.

    From the above analysis, we can see that it must be necessary to lay tiles first and then install the door, which also avoids the situation that it cannot be leveled, and avoids the situation that the door cannot be opened after the tiles are paved. No one would put a door on the house and then tile it. Because it would take a lot of time to do that.

    We can only carry out some installation of the ground after the ground is completely paved, which is a must.

    Summary.

    In general, it is necessary to lay the tiles first, and then install the door. If we install the door first and then lay the tiles, it may cause the door to not open after the tiles are laid. So who bears the responsibility?

    Obviously, no one wants to take this responsibility, because rework is tiring. So in order for us not to rework, don't install the door before the tiles are laid. This is undoubtedly asking for trouble for ourselves, and at the same time wasting a certain amount of money to pay for your mistake.

  5. Anonymous users2024-02-08

    Workers said that the first security door and then paving the floor tiles is for the installation efficiency and economic benefits, measuring the security door said that the first to pave the floor tiles and then security the door is based on the original door frame size, but to install properly without leaving defects or choose the second method, but have to wait for the floor tiles to be laid and then installed.

    If changes are noticed, adjust the position of the hinges or locking plates on the door. At the same time, pay attention to the cold shrinkage and thermal expansion caused by the weather (wet in spring and dry in winter) to ensure that the gap between the safety door and the door frame, the lock body and the lock plate is reasonable, so as to ensure the smooth use of the lock.

  6. Anonymous users2024-02-07

    When decorating a house, it is common to install doors first and then lay tiles. Renovation can generally be carried out by following these steps:

    Week 1: Commencement procedures, self-measurement, pre-design and budgeting.

    The second week: the main body is demolished, the wooden door manufacturer comes to measure, and the cabinet is measured for the first time.

    Week 3: Hydropower renovation, waterproofing of toilets.

    Week 4: Carpentry of the main ingredients.

    Week 5: Tiling (installation of window sills, floor drains), installation of sleeve hood machine cabinets for the second measurement.

    Week 6: Painting the walls and ceilings in the kitchen and bathroom.

    Week 7: Gas and cabinet installation (sink and gas stove installed at the same time).

    Week 8: Wooden door installation, floor installation, wallpaper installation (radiator installation).

    Week 9: Switch and socket installation, lamp installation, hardware and sanitary ware installation, window pole installation, pioneer cleaning.

    Week 10: Furniture Arrival, Home Appliance Installation, Home Accessories, Moving.

    Door installation must be planned and measured in advance, because custom doors can take up to a month. Follow the steps above to install the door and tile the floor at the eighth week, so as to avoid damage and contamination of the tiles. There are several issues that need to be paid attention to in floor installation:

    1. Before the floor is installed, let the manufacturer come to the door to survey whether the ground needs to be leveled or partially leveled.

    2. Before the floor is installed, the ground should be cleaned and dry. On the second day of floor installation, you can make an appointment with wallpaper to pave. It is recommended that on the day of wallpapering, the floor should be protected first.

  7. Anonymous users2024-02-06

    The anti-theft door should be the first to be secured, because there are still a lot of things to do in the door, if the house is not built very well, there is a lot of work: hitting the wall, pouring the wall, plastering cement, putty, shabu-shabu or something, the floor should be installed before the interior door. The anti-theft door is now AB key, A (decoration key is called B) key is used for decoration workers, after the decoration is completed, B (the master key is also called A, and there is also a special key) key to turn 360 degrees, with A can not be opened only B can be opened, then A key is useless.

    It's like this now, you go buy it. Generally 5+2 or 6+2 handfuls. Be careful not to use the master key first!

    After use, the decoration key will be invalid.

  8. Anonymous users2024-02-05

    Each has pros and cons according to their own situation, if the home will not all be paved with flooring, the single living room tiles, the design of the bedroom floor can be installed first, if the floor has arrived in advance, but busy to wait for a period of time, in order not to delay the construction period, then it is better to install the floor first.

  9. Anonymous users2024-02-04

    It is best to lay the floor tiles first, if the anti-theft door is installed first, the bottom of the anti-theft door is too close to the original ground, and the floor tiles cannot be paved. If the bottom of the security door is too high from the original ground, or the gap between the floor tiles and the security door is too large, it will affect the aesthetics between the security door and the floor tiles. Therefore, it is best to keep the floor tile from the anti-theft door about 5mm, so as not to scrape the floor when the door is opened.

    The order of home decoration is to do a good job of water and electricity transformation, and then the bricklayer is on the field, waterproof wall tiles and floor tiles, carpenters and painters, and the installation is in the final stage, which includes the installation of anti-theft doors.

    In the installation of the security door, there is not much waste material generated, so it is correct to rank in the back. Generally, many factories will have a fixed door sleeve size, when we decorate, we can also repair the door hole and the manufacturer's door cover size is consistent, so that when purchasing the manufacturer's anti-theft door, the door to hand time is relatively fast.

  10. Anonymous users2024-02-03

    The decoration is to lay bricks first and then install the security door is more suitable.

    The order of home decoration is to do a good job of water and electricity renovation, and then the bricklayer is on the field, waterproof wall tiles and floor tiles, carpenters and painters, and the installation is in the final stage, which includes the installation of anti-theft doors; In addition, from the perspective of who is dirty first, demolition and reform are relatively dirty, so they will also be ranked first; In the installation of the security door, there is not much waste material generated, so it is correct to rank in the back.

    Generally, many manufacturers will have a fixed door sleeve size, in the decoration, you can also repair the door opening and the manufacturer's door sleeve size is consistent, so that when purchasing the manufacturer's anti-theft door, the door to hand time is relatively fast.

  11. Anonymous users2024-02-02

    Lay the tiles first and then install the door. You don't do the threshold anymore?

    1.If there is no threshold, people can see the situation inside your house from the outside lying on the ground, and if there is anyone, they will have bad ideas;

    2.To make an anti-theft door, there is no threshold, only the door frame, therefore, you yourself consider whether to make a threshold.

    3.If you want to make a threshold, you need to work together with the floor tiles. It is half dark and half open.

  12. Anonymous users2024-02-01

    The anti-theft door is installed first, and then paved with bricks, so that the door frame is fixed with cement. The handover of door frames and floor tiles is also beautiful.

  13. Anonymous users2024-01-31

    It is more appropriate to secure the door first, and then lay tiles. If you install the tile, it is not stable, and you have to drill holes in the tile, which is not cost-effective.

  14. Anonymous users2024-01-30

    Install the door first, otherwise the tiles will not be stolen?

  15. Anonymous users2024-01-29

    Of course, the security door is installed first, and the two upstairs said that I am adding a little to prevent the loss of the plasterer's tools.

  16. Anonymous users2024-01-28

    Are you home interior decorator? If so, of course, install the security door first. If you lay the bricks first, how will your floor tiles be handed over to the door, how ugly.

  17. Anonymous users2024-01-27

    The normal situation is to paste the tile first, because now basically the door needs to be customized, if the tile does not have a store sticker, its size can not be determined, so it needs to be tiled first. If the size of the door is measured without the tiles being paved, there will be a gap after waiting for the door to be installed, and it is easy to make mistakes in the size, which will affect the construction schedule.

    The correct order is that after the tiles are good, the wooden door manufacturer should confirm the size measurement, and then customize the wooden door that suits you, because of good tiles, the height of the ground will rise accordingly, if it is still a wall tile, the thickness of the wall will change, so it can only be attached to the floor tile.

    And wall tiles, wooden door manufacturers to stand up, and finally to determine the specific size of the door, from the response ruler to the wooden door has been made, it takes about two weeks, at this time the painter is doing the work at home, and so after the painter is finished, the wooden door has also been made, and then arrange the installation of the wooden door is very accurate.

    <> the whole process of decoration of a family should be demolished and modified, water, electricity, wood, oil, and installation, so the decoration of this family is in, first of all, we must do a good job in the transformation of water and electricity, then the play of bricklayers, then waterproof wall tiles and floor tiles, then carpenters, and finally painters, and the installation is in the final stage, which includes the installation of wooden doors. For owners who don't know much about renovation, it's best to choose a renovation company with a good reputation in the local area.

    Then develop a set of renovation plans. If the funds are limited, you can find a designer to make a design plan alone, and then find the construction team to decorate according to this design plan.

    When decorating, install the door first or put the tile first? This is because after the floor tiles are pasted, the floor of the home has a clear elevation, and the thickness of the wall is also determined, and the size of the doorway is also determined. At this time, the wooden door manufacturer also needs to re-measure the site called the double ruler, the purpose of the compound ruler is to get the accurate size, so that the material production, so that it takes about two weeks, the wooden door can be produced, until the end of the decorative oil, the wooden door manufacturer can come to install the wooden door.

  18. Anonymous users2024-01-26

    When decorating, install the door first, and the decoration procedure of the house must be the first water and electricity in the white, and finally the interior design.

  19. Anonymous users2024-01-25

    The overall process of decoration is the first water and electricity renovation work, bricklayers, waterproof wall tiles and floor tiles, carpentry, and finally painters, and the installation is in the final stage, which includes the installation of wooden doors.

  20. Anonymous users2024-01-24

    When decorating, the door is installed first. After the door is installed to clean the floor, then install the tiles, so that the tiles are not easy to break.

Related questions
26 answers2024-07-04

When decorating a house, it is common to install doors first and then lay tiles. Renovation can generally be carried out by following these steps: >>>More

9 answers2024-07-04

There are no hard and fast rules, according to the conventional construction process, if the home is to pave the floor tiles, then it is necessary to lay the bricks first, if the door is installed first and then the floor tiles are pasted with the water used to print the door cover. >>>More

15 answers2024-07-04

<> case of buying doors and floors, you may consult the ** business, and the reply you get is all human factors, and your own goods should be installed first. Regarding this problem, we can analyze it together and see what advantages and disadvantages there are in the first door installation and first installation flooring. >>>More

19 answers2024-07-04

When it comes to interior decoration, we generally do the laying of floor tiles before installing sliding doors. There are several reasons for this order. >>>More

21 answers2024-07-04

It doesn't matter who has the first and who can do the following, but, the footline and the wallpaper have the order, one to do the foot sweeping is the baseboard you are talking about, and then paste the wallpaper, because the size from top to bottom is fixed by the baseboard, so as to determine the length of the wallpaper.