    In the later stage of general decoration, the problem of who installs the wooden door and floor first appears. Many people don't know who comes first and who comes after the renovation is finished, so let's judge it together today.

    Nowadays, the level of the bricklayer is uneven, and I have encountered the situation that the bricklayer has a low middle and low sides when the bricklayer mops the ground to the threshold position, the high place is only a few millimeters away from the threshold, and the low position may be two centimeters away.

    In the event of such an uneven ground, it is best to install the floor first, and then install the door after the ground is completed to facilitate the gap between the lower edge of the door and the floor to ensure that the door will not scratch the threshold when the door is opened and closed. But the only trouble is that the flooring master has to go again to install the baseboard next to the door cover, or let the door master install the baseboard around the door by the way.

    1. If you install the floor first and then install the door, it is easy to determine the distance between the floor and the door, which is not too big or too small.

    2. However, there is more dust when installing the door, which will stain the floor, and there is also the possibility of scratching the floor.

    3. If the floor is laid first and then the door is installed, then when the floor is laid, the position of the transition between the living room and the bedroom cannot be determined.

    1. If you install the door first, the baseboard of the floor can be directly connected with the door sleeve, which looks more beautiful. At the same time, there is no need to worry about bumping and scratching the floor.

    2. However, there is no way to determine the exact height from the ground when the door is installed first, and the sound insulation is not good if the gap is too large, and the door will rub against the floor if it is too small.

    There are two scenarios to be found hereIn the case of solid wood flooring: first the door and then the floorSolid wood floors are relatively soft, and it is very easy to cause scratches when heavy objects or sharp objects pass by, so install wooden doors first. At the same time, it is also necessary to tell the master the exact thickness of the floor, and the gap should be large and large.

    If the seam is larger, you can also add a floor mat underneath, if it is smaller, it will be more troublesome, and you need to remove the door and cut some under the door.

    Strengthened or solid wood composite: look at the coordination of the construction period

    The custom time of the door is the longest in the building materials, and the floor is in stock at any time and can be installed at any time, if you can't wait for the wooden door, you can install these two floors in advance. In this way, the master can accurately leave the gap when installing the door. In addition, there is no way to install the baseboard of the door sleeve when laying the floor, so you can ask the installer of the wooden door to help install it, which is generally free.

  2. Anonymous users2024-02-11

    During the renovation process, the door should be installed before the floor is laid. This avoids damage to the floor when installing the door. It can be contracted to a renovation company to do it together.

  3. Anonymous users2024-02-10

    I think we can install laminate flooring first and install the door later, which also avoids that we can't close the door when we install the floor later.

  4. Anonymous users2024-02-09

    In the process of home renovation, the installation order of wooden floors and wooden doors is usually an issue to consider. Generally speaking, we recommend installing wooden floors first and then wooden doors.

    With the decoration device, you only need to enter the area + city, and calculate the most affordable local market in 3 seconds**: [Tubana Rabbit Big Platform Counts**].

    No longer worry about the public consumption of filial piety, the early division of the price increase, missing items and increasing the price.

    There are two main reasons for this: first, if you install a wooden door first, you may cause damage to the door frame when installing the wooden floor, or you will need to trim the bottom of the door to accommodate the new floor height. Secondly, a large amount of dust and scratches may be generated when installing wooden floors, which may cause damage to the surface of the door if a wooden door has been installed at this time.

    In the local market, the range of wood flooring is usually between 100 yuan and 500 yuan per square meter, depending on the material and brand of the flooring. The ** of the wooden door is between 500 yuan and 2000 yuan per model, which also depends on the material and brand.

    Therefore, we recommend that when renovating, you should install wooden flooring first to protect the wooden doors from damage, and also to avoid the hassle of trimming the doors due to changes in floor height. When choosing wooden floors and doors, you should choose the right material and brand according to your budget and preferences to ensure that the decoration effect is beautiful and durable.

  5. Anonymous users2024-02-08

    The reason why the floor is installed first and then the door is min:

    1. Installing the floor first and then installing the door can accurately ensure the size of the gap between the door and the floor.

    2. After installing the floor first, it can ensure that the door frame is pressed on the floor, so that the gap between the door frame and the floor will form elastic contact after the glass glue is applied to ensure that the moisture will not penetrate from the break of the door frame and deform the door.

    3. Before the installation of the floor board, the floor of the paved floor at home should be cleaned to ensure that the ground is dry, so do not use water during the cleaning process.

    4. Before the installation of the floor, it is best to let the manufacturer come to the door to survey whether the ground needs to be leveled or partially leveled, and some decoration companies or renovation teams will suggest that students level the ground or local leveling, and the actual survey of the floor manufacturer shall prevail.

    General Home Renovation Process:

    1. Early Tan early branch design;

    2. Demolition and alteration of the main body;

    3. Carry out hydropower renovation projects;

    4. Carpentry, bricklayer, and oilman are constructed in order;

    5. tiling; 6. Install kitchen and bathroom ceilings.

  6. Anonymous users2024-02-07

    Install the floor first and then install the door, because after laying the floor, the door can be installed to ensure that the size of the gap between the door and the ground is suitable. If the door is installed first, and then the floor is installed later, it may cause the gap between the door and the ground to be large or small, and it will need to be adjusted again later, which will be very troublesome.

    Some experienced masters can combine the thickness of the floor to leave the size, but there will definitely be various changes when decorating. If it is left relatively large, it will be very ugly, and the gap is relatively large, and it will not have the effect of sound insulation. However, if there is a small gap between the door and the floor, there will be friction, and the door is prone to sinking, which will also damage the floor.

    Therefore, under normal circumstances, the floor is installed first and then the door is installed, which can avoid the problem that the floor needs to be stuffed into the door frame in the later stage, resulting in difficult installation, and will not produce warping or friction cracks, which can not only ensure that the tiling effect is better, but also ensure that the door will not be deformed.

    Precautions for installing doors for house decoration

    1. When the ground is selected as a decorative material, it must be completed in advance, so that the door sleeve and the ground can be closely matched, and the installation position of the door cover decoration line should be left on the door baseboard.

    2. The installation of the living room door may also involve the renovation of the door opening. After the first measurement, the construction personnel should do a good job of the transformation and surface smoothing of the door opening according to the requirements, if the door opening has a relatively large change, the width of the decorative line should be taken into account to ensure that the transformed door opening has a good shape.

    3. In order to ensure the overall aesthetic effect of the home, the height of the adjacent door sleeve should be consistent, so the height of the adjacent door opening should be consistent.

  7. Anonymous users2024-02-06

    The decoration is to install the floor first, and there is a specific basis for theory and practice.

    Installing the floor before installing the door can accurately ensure the gap between the door and the floor. If you install the door first and then install the floor, you will be afraid that the gap between the door and the floor will be large or small, then you will have to ask the wooden door manufacturer to adjust it again. While it is possible for skilled and experienced installers to reserve dimensions by informing them in advance of the thickness of the floor, any project is variable, and large sizes can be ugly and not soundproof; If it's too small, there's a chance that the door will hit the floor; Secondly, there is a possibility that the rear door will sink slightly because the gap is too small or the floor will rub against each other.

    I believe that everyone does not like the gap between the door and the floor is too large, which is not breathable and soundproof, just keep the appropriate gap.

    Installing the floor before installing the door can avoid the installation difficulties caused by various special angles and sizes that often occur when the floor needs to be inserted under the door frame or the door edge, so as to avoid the helplessness and harm of removing part of the ground lock when the floor is normally inserted under the door frame or the door edge, because once the floor loses the lock, it is easy to warp or produce mutual cracks; Install the floor first and then install the door, which can ensure that the door frame or door edge is easy to press on the floor, and the gap is uniform and small. In this way, the gap between the door frame or door edge and the floor is coated with glass glue, which will form an elastic contact to ensure that water will not penetrate into the crack of the door frame or door edge to deform the door frame or door edge, which is beautiful.

    As we all know, whether it is a wooden floor or a tile floor in the home environment, a basic requirement is the flatness, except for the bathroom, the floor in almost all spaces is the same height. Ground leveling is a complex process, generally based on the high point that can not be lower indoors, and the whole house is leveled. And if we install the door first, there may be some problems with leveling in order to ensure that the gap between the door and the floor is even.

    Without the interference of the door, natural indoor leveling becomes relatively simple. The above is the answer to the question of whether to install the floor or the door first for decoration, and whether there is any specific basis.

  8. Anonymous users2024-02-05

    Lay the floor first. It is recommended to lay the floor first and then install the door. If the order is reversed, there is no specific size for the distance, so the installation effect cannot be guaranteed.

    The gap is not beautiful and will be exposed, so laying the floor first can avoid the installation problem of the door frame caused by special size or angle adjustment problems, and better adjust the gap between the door and the floor. Once the floor is laid, the contact between the door cover and the floor is perfect. Glass glue is applied directly to the gap to form elasticity to ensure that moisture penetrates and does not deform the door frame.

  9. Anonymous users2024-02-04

    There is no certain standard for this, mainly depending on the convenience of your own home decoration, you can lay the floor first or install the door first, but to ensure that the size of the gap between the floor and the door is appropriate.

  10. Anonymous users2024-02-03

    In general, the floor is installed first, and the most important thing is to communicate with each other to determine how to install it is the most time-saving.

Related questions
9 answers2024-07-11

There are no hard and fast rules, according to the conventional construction process, if the home is to pave the floor tiles, then it is necessary to lay the bricks first, if the door is installed first and then the floor tiles are pasted with the water used to print the door cover. >>>More

15 answers2024-07-11

<> case of buying doors and floors, you may consult the ** business, and the reply you get is all human factors, and your own goods should be installed first. Regarding this problem, we can analyze it together and see what advantages and disadvantages there are in the first door installation and first installation flooring. >>>More

20 answers2024-07-11

Generally, the door is installed after laying tiles first, and if the order is wrong, the installed door may not be easy to open.

8 answers2024-07-11

When the decoration enters the later stage, it will encounter a classic dispute, that is, whether to lay the floor or install the door first. For this controversial topic, in fact, whether it is laying the floor or installing the door first, there are pros and cons. So, what are the effects of different installation sequences for floors and doors? >>>More

26 answers2024-07-11

When decorating a house, it is common to install doors first and then lay tiles. Renovation can generally be carried out by following these steps: >>>More