-
About 10 days. Electric drill during the renovation process.
The most used links are hydropower renovation, demolition and modification of walls, and installation of ceiling brackets.
Secondly, the clothes poles, curtain rods, cabinet installations, etc. in the later stage need electric drills to make holes.
Of course, it also depends on the specific construction volume and progress to determine the number of days the electric drill is used.
Introduction to the use time of decoration electric drills:The most used places for decoration drills are hydropower transformation, demolition and modification of walls, and installation of ceiling brackets.
Generally speaking, hydropower renovation requires an electric drill for about one day, and demolition and renovation of the wall requires an electric drill for about two days, but it also depends on how to dismantle and how much to dismantle.
Installing the ceiling bracket depends on the progress.
These are the ones that must use an electric drill, and there are also a lot of holes.
-
The time spent using a renovation drill depends on the specific renovation project and workload. Generally, the use time of a renovation drill is between a few days and a few weeks.
If you are not sure about the decoration materials on the market, you can find me to receive the local decoration cost reference standard, enter the area + city, accurately calculate each decoration cost, and also list, all kinds of main materials and auxiliary materials, the market price of construction costs and material schedules, and the owners can compare them one by one with the schedule! [Click here to get the most complete decoration schedule for 23 years (102 items attached), including main materials, auxiliary materials, construction costs, etc.**].
The range of decoration drills varies according to the brand, model and function. In the Chinese market, the ** of ordinary home decoration drills is generally between 200 yuan and 1000 yuan. High-end brands and professional-grade renovation drills** may be higher.
In addition to the cost of purchasing a renovation drill, there are other associated costs to consider. The first is the cost of electric drill accessories, such as different types of drill bits, screwdriver bits, etc. The ** of these accessories will also vary according to the brand and quality.
The second is the cost of consumables that may be incurred during the use of the electric drill, such as the wear of the drill bit and the need to replace, the lubricating oil of the electric drill, etc. These fees are relatively low, but they also need to be taken into account.
In addition, it is also necessary to take into account the electricity and maintenance costs that may be incurred during the use of the electric drill. Using an electric drill for a long time will consume a certain amount of electricity, so you need to calculate the electricity bill. And, if the drill breaks down or needs to be repaired, you may have to pay for a repair.
In general, the time and cost of using a renovation drill are determined on a case-by-case basis. Before buying an electric drill, it is recommended to determine the workload of the renovation project and the frequency of the need to use the electric drill, and then choose the right brand and model according to the market price. During use, pay attention to the care and maintenance of the electric drill to prolong its service life.
Tuba Rabbit is one of the largest decoration platforms in China, with a total of more than 41 million owners, 110,000 decoration companies, covering more than 300 cities across the country, which can not only meet your decoration needs, but also provide specific decoration and decoration insurance services according to your budget (first decoration and last payment, safer funds, more bottom decoration. [If you don't want to be cheated, click here, and choose a decoration company that can be decorated first and paid later].
Kunming - [Kunming Decoration Strategy Guide].
Suzhou - [Suzhou Decoration Strategy Guide].
Hefei - [Hefei Decoration Strategy Guide].
Fuzhou - [Fuzhou Decoration Strategy Guide].
Beijing - [Beijing Decoration Strategy Guide].
Dalian - [Dalian Decoration Strategy Book].
Hangzhou - [Hangzhou Decoration Strategy Guide].
Shanghai - [Shanghai Decoration Strategy Guide].
Tianjin——[Tianjin Decoration Strategy Guide].
-
What exactly is the decoration drill drilling? When decorating a new house, there will always be people who hear the sound of electric drills, what are these renovation workers drilling? In fact, the frequency of the need for electric drills for decoration is still quite high, but if the sound is too loud, it is a disturbance, especially on weekends, and decoration is not allowed.
It is mainly used for opening holes. One is to drill holes in the walls with an electric drill when burying water and electricity pipelines and pipes. The other is to use an electric drill to screw the screws into the drywall when installing the ceiling.
The third is the installation of air conditioning. Use an electric drill to drill a 3 to 5 mm hole in the wall to connect the external machine pipes. In addition, according to the relevant regulations, the sound of the electric drill shall not exceed 55 decibels during the daytime decoration, and the sound of the electric drill shall not exceed 45 decibels during the night decoration, otherwise it will affect the life, work and rest of others.
Decorating a drill to 80 decibels is considered annoying. According to the relevant regulations of our country, the sound of the electric drill cannot exceed 60 decibels during the daytime decoration, and the sound of the electric drill cannot exceed 45 decibels during the later decoration. As can be seen, the sound of the decorative electric drill reaches 80 decibels, which is annoying both day and night.
Residents can file a complaint with the Community Property Office.
In general, in the renovation of residential complexes, if there are already owners moving in, that is, people living in the building, the renovation time of the drill should be based on 8 a.m. to 12 noon and 2 p.m. By 6 p.m. Decoration should not be done at any other time.
According to the provisions of the Law of the People's Republic of China on the Prevention and Control of Environmental Noise Pollution, it is forbidden to work on statutory holidays, holidays all day and from 12:00 to 14:00 on weekdays, and 18:00 on the next day
00 to 8:00. Noise-producing decorations and other interference with civilian operations.
-
Enter the area and get the decoration for free**].
In home decoration, a variety of tools will be used for decoration, among which the electric drill is an inevitable decoration tool, then, the following will introduce to you why the decoration should use the electric drill. 1. Why should electric drills be used for decoration Because of the decoration of the house, such as walls, curtains, carpentry, aluminum alloy doors and windows, and water and electricity, many projects need to use electric drills. Usually used is the electric hammer family shouting or hand drill, the electric hammer is used for the opening of the main body of the building, the hand drill is used for the opening of decoration materials, etc., generally will be used in 2-3 days.
2. What department should apply for housing decoration Zhaoye repair 1. Residential decoration: Before the implementation of interior decoration, it is necessary to declare and register with the property management unit and urban construction supervision squadron where the residence is located. 2. Non-residential decoration:
Before the decoration, you need to bring the relevant materials to the urban construction supervision squadron to apply for the "Housing Decoration Permit". 3. The project investment is more than 300,000 yuan, and the construction area is more than 300 square meters: the construction unit needs to bring relevant materials to the urban construction supervision squadron to apply for the "Construction Permit" before the start of construction.
2. How many decibels of noise is considered to disturb the people Daytime: 50 decibels, night: 40 decibels.
The standard is suitable for areas where there is a great need for quietness, such as wellness areas, high-end villa areas, and high-end hotel areas. This type of area located in the suburbs or villages shall be implemented according to the standard of 5 decibels stricter than the 0 category. Class Daytime:
55 dB, Night: 45 dB. The standard applies to areas where residences, cultural and educational institutions are the main combustion forces.
50 decibels. The standard applies to residential, commercial, and industrial mixed areas. Class Daytime:
65 dB, Night: 55 dB. The standard applies to industrial areas.
Category: 70 dB during the day, 55 dB at night.
The standard applies to the areas on both sides of the road in the urban road traffic arteries, and the areas on both sides of the inland waterway that run through the urban area. Summary: The above is all the content of why electric drills are used in decoration, I hope it can help you.
I think you also know something after reading it! If you want to know more about relevant information, please pay more attention to Qeeka Home, which will provide you with more complete, detailed and updated information.
Do the math how much it will cost you to renovate your home
-
Hello dear, glad to answer for you. The sound of the decoration drill is generally maintained for a few days: when decorating the house, the electric drill is often used, if the construction speed is relatively fast, you can not use the electric drill for about a month, but if the construction speed is relatively slow, it will take at least a month or so.
In addition, you can't use an electric drill to decorate on weekends, otherwise it is a disturbing behavior, and neighbors can complain, because at present, our country has a clear time regulation for decoration, and if it exceeds the specified time period, it is a disturbing behavior, and it is necessary to bear relevant responsibilities. In addition, if it is a national holiday, it is not allowed to be renovated.
You should first negotiate with your neighbors to ask them not to carry out drill construction during non-decoration hours, and if the negotiation is not smooth, you can file a complaint with the property and let the property staff intervene to deal with it. >>>More
Resilient acoustic ceilings can solve some of the noise from the upper floors, but reduce the height of the room by 10-15 cm. Because the sound of walking with high heels and running barefoot on the upper floor belongs to the impact sound, it is a solid sound, and part of it is transmitted to the downstairs through the wall, so the suspended ceiling cannot completely solve the noise upstairs. Decorate the walls. >>>More
1.Hydropower below 80 square meters of units in 2000 yuan 5000 yuan, 120 square meters of units in 4000 yuan, 8000 yuan in general, home improvement companies will pre-charge 1000 2000 yuan of water and electricity advance. 2. Floor tiles, wall tiles, floor tiles, and wall tiles are much more complex than floors, and they require the meticulous work of decoration workers, so the cost of paving floor tiles and wall tiles is more than that of flooring. >>>More
The house decoration is all-inclusive** at 1000 yuan a square meter, according to the 100 square meter house, it costs 10w, the grade is the most basic and ordinary, and then it depends on the city where you are located, ** will also fluctuate. >>>More
You can take a look at Hefei Golden Ideas.