-
The construction project data is the construction project data, and the whole data is divided into four categories, that is, the construction unit.
Documents, documents of the supervision unit, documents of the construction unit, and as-built drawings.
Information. Among them, the documents of the construction unit are divided into 8 sub-categories, such as project approval documents, construction planning land documents, survey and design documents, and other documents; The documents of the supervision unit are divided into four categories: supervision management data, supervision quality control data, supervision progress control data, and supervision cost control data.
The documents of the construction unit are divided into construction management data, construction technical data, construction materials data, engineering survey records, construction records, concealed engineering inspection and acceptance records, construction inspection data, construction quality acceptance records, and unit (sub-unit) project completion acceptance.
9 sub-categories such as materials; The as-built drawings are divided into three categories: comprehensive as-built drawings, outdoor professional as-built drawings, and professional as-built drawings. Within each sub-category, it is subdivided into a number of documents, information or **.
Extended information: Classification management method of construction project data.
1. Classified according to the different types of information. For example, it is divided into construction units, survey units, design units, supervision units, material and equipment units, construction general contractors, subcontractors, relevant departments and so on.
2. Classification according to the object of data archiving. Such as belonging to the construction unit, the construction unit, the urban construction archives and so on.
3. Classified according to the professional nature of the data. Such as building structure engineering, building decoration engineering, building water supply, drainage and heating engineering, ventilation and air conditioning engineering, building electrical engineering.
, building intelligent engineering, elevator engineering, etc.
4. Classified according to the content of the data. Such as construction management data, construction technical data, construction material data, construction survey records, construction records, concealed engineering inspection and acceptance records, construction inspection data, construction quality acceptance records, project completion acceptance data, etc.
5. Classification according to the order of the data. The same type of information should be sorted in the order in which it was formed.
Information on construction works.
-
Pre-bidding information, pre-construction preparation information, construction process information (unit engineering, branch engineering, sub-projects, inspection batches, concealed acceptance records and other technical information, of course, including raw materials for review, project negotiation and change, engineering visa, related ** image data, etc.), completion data, settlement data (limited to narrow engineering data).
-
Including the construction unit project preparation stage bidding documents, supervision documents, construction documents, project negotiation changes, engineering visas, as-built drawings and completion acceptance documents, collectively referred to as construction project data, the construction unit construction project national standard acceptance specifications are divided into nine divisions. Excludes the Energy Saving Division. Tianjin Acceptance Regulations will be the energy-saving division into the following:
There are 10 divisions in total.
The original nine divisions of civil engineering data engineering, the existing energy-saving division, a total of ten divisions, each division has a number of sub-items, and then according to the engineering parts of the division of a number of inspection batches, the data from the inspection batch to make. At the same time, it is necessary to simultaneously carry out the inspection of incoming materials and the sampling and retest of incoming materials. Division, sub-item, inspection batch.
Foundations and foundations, main structures, roofing, decoration, water supply, drainage and heating, electrical, intelligent, ventilation and air conditioning, elevators. (GB).
Foundation and foundation, main structure, roof, decoration, water supply, drainage and heating, electrical, intelligent, ventilation and air conditioning, elevator, energy saving (Tianjin landmark).
-
Content from user: Yang Yanfu.
-
Building construction materials include a lot of content, which includes the whole process of construction. It depends on local norms and procedures.
-
1. The construction organization design (plan) is submitted for review.
2. Drawing review record.
3. Technical (safety) disclosure.
4. Commencement report.
5. List of management personnel.
6. All kinds of materials for inspection.
7. Design changes.
8. On-site visa.
9. Concealed inspection.
10. Inspection batch inspection.
11. Sub-project inspection.
12. Submit for inspection of branch projects.
13. Unit engineering inspection.
14. Completion report.
6-8 of them are interspersed throughout the construction process of the project.
-
The construction project data is the construction project data, and all the data are divided into four categories as a whole, that is, the documents of the construction unit, the documents of the supervision unit, the documents of the construction unit, and the as-built drawings. Among them, the documents of the construction unit are divided into 8 sub-categories, such as project approval documents, construction planning land documents, survey and design documents, and other documents; The documents of the supervision unit are divided into four categories: supervision management data, supervision quality control data, supervision progress control data, and supervision cost control data.
The documents of the construction unit are divided into 9 subcategories, including construction management data, construction technical data, construction materials data, engineering survey records, construction records, concealed engineering inspection and acceptance records, construction inspection data, construction quality acceptance records, and unit (sub-unit) project completion acceptance data; The as-built drawings are divided into three categories: comprehensive as-built drawings, outdoor professional as-built drawings, and professional as-built drawings. Within each sub-category, it is subdivided into a number of documents, information or **.
-
1. To do a good job in the management of construction project data is to conscientiously implement the specification for archiving construction project documents (GB T 50328-2014), strengthen the standardized management of construction project data, improve the management level, and ensure the concrete embodiment of project quality.
2. Construction engineering data is an important part of the urban construction archives, and is a necessary condition for the completion and acceptance of the project, the evaluation of the quality of the project, the structure and the reliability of safety and health, and the identification of the quality level of the project. Therefore, the management should be strengthened so that it can comprehensively and objectively reflect the actual situation of the project.
3. Construction engineering data is an important technical basis for the handling of project quality and safety accidents, as well as the inspection, maintenance, management, use, reconstruction, expansion, project settlement, final accounts and audit of the project.
4. To strengthen the management of engineering data, each unit and individual can be urged to work in accordance with standards, specifications and procedures, and if the engineering data does not meet the relevant regulations and requirements, the project shall not be completed and accepted. The acceptance of engineering data during the construction process must be carried out simultaneously with the acceptance of project quality.
5. The preservation and management of engineering data in the construction process should be carried out in accordance with the relevant procedures and agreements, after the completion of the project, all parties involved in the construction should archive and preserve the engineering data, provide reference and accumulate experience for future construction, and is an important information to guide the future construction of the project.
-
1. Construction engineering refers to the engineering entity formed through the construction of various types of housing buildings and their ancillary facilities and the installation of supporting lines, pipelines and equipment. Among them, "housing construction" refers to the roof, beams, columns, walls, foundations and internal spaces that can form to meet the needs of people's production, residence, study, public activities and so on.
2. Construction project archival materials. Construction projects are generally divided into project planning, land acquisition and demolition, survey and design, civil construction, pipeline construction, equipment installation, interior and exterior decoration, completion acceptance and other engineering projects. The archival materials of these projects need to be preserved for a long time.
The construction cost is composed of the following parts:
1. Direct engineering costs, that is, various expenses that constitute the engineering entity, including labor costs, material costs, construction machinery use costs, etc. >>>More
Generally, it is composed of control system, numerical control system and servo system. >>>More
1. Motherboard: computer chassis motherboard, also known as motherboard, systemboard or motherboard; It is divided into two types: commercial motherboards and industrial motherboards. It is installed in the chassis and is one of the most basic and important components of the microcomputer. >>>More
The connecting devices between bones are called joints. The relatively large joints of the human body include shoulder joints, elbow joints, hip joints, knee joints, ankle joints, etc. >>>More
1 Engine The engine is the power unit of a car. Its role is to generate power from the combustion of fuel, and then drive the wheels through the transmission train of the chassis to drive the car. There are two main types of engines: gasoline engine and diesel engine. >>>More