requirements for fire hydrants in buildings; 1. The fire hydrant should be located in the walkway, near the stairs and other places that are obviously easy to access, and the spacing of the fire hydrants should ensure that the water jets of the two fire hydrants on any part of the same floor reach at the same time. 2. The water cannon of the fire hydrant shall be determined by hydraulic calculation, and the building height shall not be less than 10m for high-rise buildings not exceeding 100mm; High-rise buildings with a building height of more than 100m should not be less than 13m. 3. The spacing of fire hydrants should be determined by calculation, and high-rise buildings should not be greater than 30m, and podiums should not be greater than 50m.
Fourth, the height of the fire hydrant mouth from the ground should be the direction of the water outlet of the fire hydrant should be downward or perpendicular to the wall where the fire hydrant is installed. 5. The hydrostatic pressure of the fire hydrant should not be greater than that, and when it is greater, the zonal water supply system should be adopted. When the water outlet pressure of the fire hydrant is greater, a pressure reducing device should be set at the fire hydrant.
6. Fire hydrants should adopt the same model and specifications. The diameter of the bolt mouth of the fire hydrant should be 65mm, the length of the hose should not exceed 25m, and the diameter of the water gun nozzle should not be less than 19mm. 7. Each fire hydrant of the temporary high-pressure water supply system shall be equipped with a button to directly start the fire pump, and shall be equipped with a facility to protect the button.
8. Fire hydrants should be set up in the front room of the fire elevator room.
-
Design Code for Heating, Ventilation and Air Conditioning GB 50019-2003 Current Code for Fire Protection Design of Buildings GB50016-2014 Fire Linkage Control System:
Fire linkage control system: When the fire is confirmed, various fire fighting equipment will be activated to achieve the role of alarm and fire extinguishing.
System structure: The automatic fire alarm and fire linkage control system is mainly composed of the following equipment: host motherboard, loop card, manual control panel, multi-wire control panel, DC uninterruptible power supply, fire emergency broadcasting system, fire protection system, CRT system, chassis.
Intelligent Fire Protection System:
The intelligent fire protection system has the function of automatic alarm at the beginning of the fire, and is equipped with a direct access to the fire department, an automatic fire extinguishing control cabinet, a fire alarm broadcast system, etc.
-
1) Commencement report. 2) Completion acceptance report of fire protection project. 3) Construction summary.
4) Project quantity table. 5) Engineering inspection data. 6) Change the design.
7) The fire protection design review opinion issued by the public security and fire protection agency for the fire protection project.
8) Fire engineering acceptance opinion issued by the public security and fire protection agency. 9) Automatic fire detection, alarm, controller and other equipment products, model information, fire blocking engineering product information. 1o), fire extinguishing agent manufacturers and product information.
11), fire doors, emergency lighting, evacuation signs installed in stations and tunnels manufacturers and product information.
12) Manufacturers and product information of various types of fire extinguishers and fire pumps configured at each station. 13), the engineering quality supervision department of the fire concealment engineering on-site supervision, supervision records. 14) Qualification certificate of fire engineering testing institution and fire engineering testing opinion.
15) Minutes of the meeting for construction, completion and on-site engineering checking. 16), construction records and attachments.
17), each fire protection project should draw the fire pipe network, towards the completion of the drawing, the public security fire protection agency to review the fire protection engineering design and construction drawings. 18) Engineering log.
The floor is the last step in home decoration, and the walls of the home are generally treated, and the floor is paved after the home is cleaned up. Therefore, before laying the floor, you must finish all the dirty decoration work, and then clean the floor. If you want to install laminate flooring and don't need to make a keel, you also need to do a good job of leveling the cement floor or the bottom layer. >>>More
For the future fire protection industry, we can think a little bit about the current situation. >>>More
The French style of decoration is specifically romantic, and such decoration likes. If you are a person who loves life and is delicate and romantic, then you must not miss French design. Elegant, passionate, and French-style style has always hit the deep desire for a romantic and sophisticated life. >>>More
The first thing you need to pay attention to when installing PPR water pipes is to prohibit smashing water pipes, especially in winter, because PPR water pipes are cold and brittle. >>>More
What is Smart Pension?
Smart elderly care is also known as a fully intelligent elderly care system. >>>More