-
1 Material Acceptance 2Concealed works of hydropower pipelines, 3 waterproof projects, 4 other concealed projects, 5 base treatment, 6 surface acceptance, this is the acceptance process.
The acceptance project depends on what you do.
-
Generally speaking, see if there will be flaws in the work, such as the door can't be closed, the wall is stained, the tile will be hollow, whether the faucet can pass water, whether the floor drain is unblocked, etc., there are no process steps.
-
How to accept after the decoration has step 1, after the completion of the decoration construction, the decorator and the person in charge of the decoration enterprise jointly submit an acceptance application to the management office.
2. The management office organizes acceptance personnel (supervisors and technicians of the mechanical and electrical maintenance group, supervisors and administrators of the public affairs group) to carry out on-site acceptance of the decoration within the same day. If there is no violation of the rules and regulations, the following procedures shall be followed: if there are violations, they shall be handled according to the violation measures.
3. If the completion acceptance is qualified, the public affairs group of the management office shall be in charge of the decoration application form"Completion acceptance"Column signing"Passed the initial inspection"and sign and date.
4. The security team of the management office will take back the construction certificate, and if it is lost, the decoration company shall give certain compensation and omission.
5. The decoration company cleared the site and left on the same day.
6. After the decoration acceptance is qualified and used for one month, the public affairs group of the management office shall organize a re-inspection of the decoration construction, and there is no problem with the re-inspection, which shall be indicated by the head of the public affairs group in the "decoration application form"."The re-inspection is qualified"After that, it will be sent to the director of the management office for approval, and the finance department will return the decoration deposit of the decorator and the decoration enterprise.
7. When the decoration construction is accepted, the decorator has illegal decoration behavior, the head of the public affairs group shall, according to the situation, make an appraisal according to the regulations, list the amount of deductions, and after the consent of the director of the management office, a copy of the deduction list will be handed over to the decorator, a copy of the financial group, and the financial group will deduct the money according to the following methods:
1. Deduct the money from the decoration deposit of the decoration enterprise first;
2. If the decoration deposit of the decoration enterprise is insufficient to compensate for the deduction, it shall be deducted from the decoration deposit of the decorator;
3. If the deduction of the decoration deposit of the decoration imitation clan still cannot compensate for the deduction, the decoration person shall be required to give compensation;
4. Decoration data are sorted out and archived for long-term storage.
You can get it for free
-
New house decoration acceptance steps.
1. Check whether there is a hollow drum on the wall.
If the wall is hollowed out and left unrepaired for a long time, it may cause cracks or fall off the tiles. During acceptance, you can use a small hammer to beat whether there is a hollow drum to check whether the brick surface is smooth and whether there are cracks.
2. Acceptance of wall paint and wallpaper.
After the latex paint is dried, check whether there is serious color difference, anti-alkali, powder loss, color translucent and other conditions under natural light. The acceptance of the wallpaper should check whether the closing is smooth and whether there is blistering.
3. Circuit acceptance.
In the case of power failure, check whether the bending position of the electrical box is firm, and check whether the wiring in the electrical box is flat and smooth. Then check whether the location of the electrical appliances is loose and whether there is a fixed installation. Finally, turn on the switch and check the operation of the appliance.
A conventional electric pen can be used to check whether the circuit of the socket is connected, and a professional tool can be used to check whether the ground wire and the neutral live wire are connected.
4. Drainage acceptance.
Directly check whether the water pipe is installed firmly, turn on the faucet to see if the drainage is smooth and whether there is any water leakage. The drainage situation at the floor drain, toilet, shower, and washbasin can not be ignored, you can open the faucet to drain to the ground, and check how the water on the ground is after a period of hail.
5. Acceptance of doors and windows.
Check whether the doors and windows are installed firmly, whether the hardware accessories are complete, and whether the door lock can be opened normally. Check whether the sealant of the glass is uniform and tight to avoid water leakage in rainy days. Finally, use a rectangular ruler to measure whether the door frame and window frame are horizontal and vertical, and record the data if the error is large.
6. Acceptance of kitchen smoke outlet.
You can light a piece of paper with a lighter near the kitchen smoke vent to check whether the kitchen flue smoke exhaust is smooth.
7. Record data.
If you have any incorrect data, you can also use a post-it note to indicate the areas that need to be corrected. For example, where the tiles are hollow and the drain pipe is leaking, the leaking place is directly pasted with post-it notes, so that the construction party can modify it in time.
-
On the basis of the completion self-inspection, confirm that the project meets the completion acceptance standards, and the formal acceptance of the decoration project can be carried out if the conditions for delivery are met.
1. Issue the Notice of Completion Acceptance
The construction unit shall send the "Completion Acceptance Notice" to the construction unit 10 days before the date of formal completion acceptance.
2. Submit the completion acceptance materials.
The completion acceptance data shall include the following contents: an overview of the completed project; Drawing triage records; material substitution approval order; construction organization plan and technical disclosure materials; Materials, components, factory certificates and inspection reports of finished products; construction records; Decoration and decoration construction test report; Completion self-inspection record; Hidden inspection records; Decoration and decoration project quality inspection and evaluation data; change records; as-built drawings; Construction diary.
3. Organize the acceptance work.
The construction unit invites the design unit and the section to participate in the completion and acceptance of the project, and conducts inspection and acceptance together with the supervision unit and the construction unit.
1) Concentrate and meet to introduce the general situation of the project and the relevant situation of the construction;
2) Conduct inspections in groups and specialties;
3) Centralized group reporting of inspection conditions;
4) Put forward acceptance opinions, evaluate the quality level, and clarify the specific handover time and handover personnel.
4. Issue the Certificate of Completion Acceptance
After the construction unit completes the acceptance and confirms that the project meets the requirements of the completion standards and contract terms, the "Completion Acceptance Certificate" shall be issued to the construction unit. The construction unit, the design unit, the quality supervision unit, the supervision unit, the construction unit and other relevant units shall sign the "Completion Acceptance Certificate".
5. Carry out project quality verification.
The supervision unit of the project shall be approved in accordance with the relevant national standards after accepting the task of quality verification of the completed project. Approved qualified or excellent projects will be issued with a "Certificate of Conformity" and explain their quality level, otherwise they are not allowed to be put into use.
6. Handle the transfer of project files.
The project file is the permanent technical document of the project, an important basis for the use, maintenance and transformation of the construction unit, and also the basis for the review of the project. After the completion of the construction project, the project manager must hand over the dossiers to the construction unit in accordance with the regulations. The transferred project files and technical data must be true, complete and representative, and can truthfully reflect the situation of the project and construction.
7. Go through the procedures for the transfer of the project.
After the completion of the inspection and acceptance of the project, the construction unit shall go through the project handover procedures to the construction unit, sign the handover acceptance certificate, and go through the project settlement procedures.
8. Handle the final accounts of the project.
After the completion and acceptance of the entire project and the completion of the project settlement procedures, the construction unit shall prepare the final accounts of the project and report to the relevant departments. At this point, the whole process of the whole decoration project is over.
1. Pay attention to check whether the water pipe is fixed during acceptance. Generally speaking, if the water is changed to the top, it must be fixed with a metal pipe clamp, and the spacing cannot be greater than 60cm. >>>More
There is really no way to do it quickly, but generally don't move in first, and then open the windows to ventilate every once in a while, and then add white vinegar to wipe some painted furniture, and put some white vinegar in each part of the house to smoke it, it's OK :)
After the renovation of the new house is completed, many people will open the windows for ventilation, or try their best to remove the formaldehyde indoors, after all, formaldehyde has a certain impact on the human body. However, some people use activated carbon to remove formaldehyde in the decoration of new houses, which is okay, after all, activated carbon has a certain adsorption property and can quickly adsorb formaldehyde indoors. But there is a drawback, activated carbon cannot be decomposed. >>>More
When we buy a house, we all renovate our new house. The decoration is also a relatively large project, which is more laborious and laborious. We first need to find a regular renovation company, let them design the house, and then renovate it, and we also need to conduct a home inspection after the house is renovated. >>>More
1. Chlorine dioxide effervescent tablets are placed in a disposable cup filled with water 2. Activated carbon 3. Photocatalyst sprayed on walls and furniture 4. Green plants 5. Open windows for ventilation.