In principle, it is a must.
It is estimated that the new project will not be able to run, and it will need to be completed and filed together with the civil engineering.
If it is the renovation or renovation of the old hotel, it is possible that there is no application for construction, or after the completion of acceptance, especially after the fire acceptance, the direct use is not recorded, and the control of the management of the drill block does not affect its business and operation. However, this kind of general supervision will not be invited.
It is estimated that you are a new project, or carefully sort out the construction log, is it a hotel decoration project, refer to the relevant information and supervision log, and then re-compile it, and your original log, other materials (such as purchase list, work order, inspection report, project contact sheet or letter, supervision notice, design change order, meeting minutes, etc.) are not contradictory, much simpler than civil engineering.
Also, in the future, you may be stuck in the final accounts. If you really want to pay it, you must also pay it, and even if you pay it, it will delay your final accounts, delay your unpaid settlements, and even the end of the guarantee period in the future.
-
As an important project information, the construction diary is required to be archived by the archives.
-
The first time I did the decoration engineering data clerk work, I studied business, I don't understand this industry, which hero, what information should be prepared before the decoration engineering data clerk starts work? What to prepare during construction? What's next when it's done?
What else do you need to prepare after completion? If there is anything to pay special attention to, please say, thank you, hero, I have a point, a reward of 100
First of all, look at the drawings carefully, for the quality requirements of the material and the quality requirements of the acceptance, also turn over the specifications, do a good job in the inspection and test plan of the whole project, the number of batches used for inspection, etc., ask the constructor or go to the site to see the rhythm of the on-site construction, do not wait until the construction is completed and then supplement the information, and the synchronization will not be always urged. It is very important to do a good job in the registration of various projects and data ledgers, and the data storage and classification should be clear and complete, and patience is the first.
If you want the data clerk to write, ask the site responsible for the basic situation of the construction staff and safety officer in charge of each process, and write the equipment and materials into the site, construction progress, quality, safety and so on, I hope to help you.
-
In principle, there are on-site constructors to compile and report to the data department for collation. The actual situation depends on how your company's project is arranged. Thank you!
-
The construction worker writes, you are not at the construction site, how do you know what the situation is.
-
There are slight differences in the type of table and document structure used in each province for the as-built data of the decoration project.
Here I will talk about it (taking Hubei Province as an example).
1. Project management data.
Engineering and technical documents for review.
Enterprise qualification review.
Construction organization design.
Commencement report. Shutdown and resumption of work report.
Construction logs. Project Overview.
As-built report. Wait a minute.
2 Technical Documentation.
Drawings are triaged. Design disclosure record.
Technical disclosure record.
Engineering test records.
3. Engineering quality documents.
Inspection batches for each sub-item.
4. Engineering material documents.
Materials submitted for review. The test report of the material is certified.
5. The quality, safety, sensory and verification of the unit project should be recorded.
That's about that.
For more details, I suggest that you check the document number db42 Hubei Province's data regulations.
-
Landmark requirements vary from place to place
-
If it is required for tooling: construction agreement, construction budget, construction final accounts, design drawings, as-built drawings, price list of main materials of both parties, on-site additional visa form (if there is a need for additional items), concealed project visa form, construction log, completion of the four-party confirmation form (designer dust buried, Party A, Party B, supervision), material certificate and fire resistance certificate, design fire audit opinion and completion fire acceptance opinion (if the online application is not selected, the review report will be used). That's basically it.
If it's a home improvement, you don't need so much.
-
Commencement report, construction organization design, the company's qualification review (if there is subcontracting, the subcontracting company's qualification will be submitted for review), management personnel qualification certificate, on-site inspection records.
-
The qualification of the construction unit shall be submitted for the construction management personnel post certificate, special type of work certificate, construction plan, and schedule.
-
Commencement report, drawing review, drawing fire inspection,