I want to be a budget clerk. Cost Engineer. What is the difference between a budgeter and a cost eng

Updated on workplace 2024-02-09
13 answers
  1. Anonymous users2024-02-05

    So many questions·· If you still want to learn all at once about civil engineering, garden installation, steel structure and water conservancy!!

    Learn slowly one by one.

    Buy two textbooks for cost clerks, those two are very complete, very complete, and very practical. Then there must be a set of quotas! Otherwise, you won't be able to memorize the calculation rules! Be sure to read the drawings! You have to understand the materials, otherwise you can't set the price and can't convert it

    Skill is practice!! We can't finish an engineering study in school for several years as fast as we do it in a down-to-earth manner! It's a good thing to have a master, but you still have to understand it yourself, understanding is very important, some people can't get started in three years, and some people can take over the project by themselves in a year, come on!!

  2. Anonymous users2024-02-04

    It is a bit difficult to budget all-round, to study in different majors, first determine a direction, learn a budget officer certificate, accumulate experience, and then take a cost engineer exam.

  3. Anonymous users2024-02-03

    Register for the cost engineer certificate first.

  4. Anonymous users2024-02-02

    I graduated from junior high school, and now I feel good about learning with the teacher, I don't like to read books by myself, I'm in the Fa-rectification school, you better let the teacher tell you about it, I'm not promoting it for them, or seeing that you are interested in learning, so I kindly tell you.

  5. Anonymous users2024-02-01

    Look at the calculation rules, as well as the quota, understand the basic process, and now basically use software to calculate, which is relatively fast.

  6. Anonymous users2024-01-31

    Cost engineer refers to the practice after being qualified by the state and approved for registration, and specifically accepting the designation and commission of a certain department or unit.

    Entrust or hire, responsible for and assist in the valuation, pricing and management of the project cost, in order to safeguard their legitimate rights and interests of engineering economic professionals.

    Budgeter refers to the detailed or rough statistics on the most basic labor, materials, machinery and other expenses completed by a project, including taxes, profits, etc. Budgeters are also commonly referred to as building budgeters or civil budgeters.

    The difference between a cost engineer and a budgeter.

    1. Different concepts: there is a world of difference between budget and cost, and the budget is just a small subject within the scope of cost;

    3. The filing mechanism is different: as long as the previous budget clerk has obtained the certificate and seal, it basically doesn't matter how you practice, while today's cost clerk has to be registered, and the local cost management department will manage and continue education and training;

    4. The scope of use is different: generally speaking, the budget officer can only practice in the province, while the cost officer is applicable to the whole country.

  7. Anonymous users2024-01-30

    The difference between a budgeter and a cost engineer is on 2 levels:

    The first level is the practical level, especially in the cost consulting company, the budgeter (now basically called the cost officer) can independently prepare the budget, final accounts and even be able to independently complete the review, and as a management method, the issuance of a result document must be issued by a person with the qualification of a registered cost engineer, and the budget officer is only as an auxiliary person to assist the cost engineer to seal (can be used as a price examiner, reviewer, not as an appraiser). There is no such restriction for cost engineers.

    The second level is the conceptual level, the main purpose of the budget officer (cost officer) is to calculate the engineering quantity, the application of the project quota sub-item, the determination of the material **, and some project bidding, bill of quantities and other cost-related engineering calculation matters. The cost engineer, the purpose of its establishment is not limited to the above, for the entire project project capital cost management (financing investment management), contract management caused by the cost matters (claims management), and even some project management ideas, such as network management are compounded in the assessment scope of the cost engineer, in this way, the mission of the cost engineer is from the micro engineering quantity calculation to the macro capital management, a whole concept; The budgeter only implements at the micro level of quantity calculation.

  8. Anonymous users2024-01-29

    Generally speaking, having a cost engineer certificate is a symbol of authoritative status in the industry and a professional qualification, while the budget officer is a job qualification, and the budget officer certificate is a job certificate. The professional level of the budget officer is divided into details, and the application is emphasized, and the cost engineer is not classified into two specialties, focusing on system theory. To use an inappropriate analogy, but it is easy to understand, if the cost engineer has a bachelor's degree, the budget engineer is a specialist.

    Generally speaking, enterprises pay more attention to the value of cost engineers in actual use.

  9. Anonymous users2024-01-28

    Of course it's different. The budget clerk is nothing more than a job permit. The cost engineer is a professional qualification examination, which belongs to the scope of professional qualifications, and the budget officer learns the simplest of it, and the cost engineer learns a lot deeper, if there is anything else you don't understand, you can go to my username to see it, come on.

  10. Anonymous users2024-01-27

    Budgeters and Estimators:

    1. Different concepts: there is a world of difference between budget and cost, and the budget is just a small subject within the scope of cost;

    3. The filing mechanism is different: as long as the budget clerk has obtained the certificate and seal, he basically does not care how to practice, while the cost clerk must be registered, and the local cost management department will manage and continue education and training. 4. The scope of use is different

    Generally speaking, budget clerks can only practice in their own province, while cost clerks are applicable to the whole country.

    The difference between the cost officer and the cost engineer: whether the project can be undertaken across the region, this is the qualification of the consulting unit, and the cost officer (division) has nothing to do with it, according to the current practice, the cost business, the cross-regional must be a grade A cost consulting unit. If the cost engineer seal is to be stamped when bidding, it is common for registered cost engineers all over the country; To stamp the cost of the seal (do not specify the cost of the engineer), do not say that the local cost officer chapter is valid, the cost of other provinces and cities will not work.

    The similarities between the two: General in China; are all professional qualifications for pre-settlement audits; Differences:The level is different, the division is higher than the member; Permissions are not the same.

    The cost engineer can only prepare but not audit, which means that there is no right to audit, while the cost engineer can; The height of the representative's professional title is different, and the cost engineer is equivalent to the intermediate level. The cost clerk is only a junior one.

    The fundamental difference between cost engineer and cost engineer is: cost engineer belongs to the professional qualification set by the state according to law, is the administrative license implemented by the state administrative organs, is the professional market access, and the cost engineer has the right to sign the corresponding cost documents and bear legal responsibility according to law; Cost clerk is a kind of job setting, the cost clerk certificate belongs to the professional level certificate, does not have the nature of administrative licensing, nor is it the market access of professional qualifications, the responsibility of the cost clerk is to assist the cost engineer to complete the cost work, the cost clerk does not have the right to issue independent cost documents.

  11. Anonymous users2024-01-26

    Difference Between Estimator and Estimator:

    1. The nature of the work is different.

    The budgeter is to budget the investment of the project before the construction of the project, and the cost officer is to the project after the completion of the project.

    The actual costs incurred are carried out in the cost consulting (audit) work. Estimators can also work on budgeting, but budgeting.

    Employees are not allowed to engage in cost consulting work.

    2. The work unit is different.

    The budget clerk generally works in the construction enterprise, and the cost clerk generally works in the cost consulting enterprise.

    3. The certificates are different.

    The budget officer is a certificate printed by the Hubei Provincial Department of Construction and issued by the Hubei Provincial Department of Construction. Cost Engineer is a cost consultant in China.

    The certificate of the association (China Price Association) is issued by the Hubei Provincial Cost Management Station.

    The budget clerk is a certificate of qualification for the training of key positions in the construction industry in Hubei Province, and it can only be issued after participating in the training examination.

    Proof. The cost officer is the national cost officer qualification certificate, and there is no requirement for training.

    4. The application conditions are different.

    Basically, there are no restrictions on the application conditions for budget officers, and no relevant work experience is required. There are strict application conditions for cost personnel.

    system, non-cost majors must have more than one year of cost-related work.

    If you have any other questions, please feel free to contact us.

  12. Anonymous users2024-01-25

    The differences between a budgeter and a estimator are:

    1. The meaning is not the sameBudgeter has two meanings, one refers to the most basic labor, materials, machinery and other expenses completed by a project, including taxes, profits, etc. Second, it is also called a construction budget officer or a civil construction budget officer.

    Cost officer refers to the professional who has passed the cost qualification examination, obtained the "National Construction Project Cost Qualification Certificate", and obtained the practitioner seal through registration and engaged in engineering cost activities.

    2. The policy is differentOn January 13, 2016, the executive meeting decided to cancel 61 professional qualification licenses and recognition items on the basis of the previous cancellation of 211 professional qualifications in four batches. The national construction project cost engineer qualification is one of them.

    The budgeter did not cancel.

    3. Job responsibilities are differentThe budget officer is mainly responsible for reviewing the construction drawings, participating in the drawing review and technical disclosure, and making budget adjustments according to its records. Assist the leaders to do a good job in the project declaration, organize bidding, approval before the start of construction and acceptance after completion.

    Fully grasp the terms of the construction contract, go deep into the site to understand the construction situation, and lay a good foundation for the final account review.

    The responsibilities of the cost officer are to be familiar with the laws and regulations of the country and the management regulations related to the project cost, be proficient in the theoretical knowledge of the profession, be familiar with the engineering drawings, master the project budget quota and relevant policies and regulations, and lay the foundation for the correct preparation and review of the budget. Responsible for reviewing construction drawings, participating in drawing review and technical disclosure, and making budget adjustments according to their records.

  13. Anonymous users2024-01-24

    Cost clerk and budget clerk are the same, but in the construction industry is called different, the early construction industry is usually called "budget clerk", and now the construction industry is usually called "cost clerk", in fact, the same professional position!

Related questions
19 answers2024-02-09

I'm going to give you a full analysis:

After 3 years of boxing: it means that you have strong hand-to-hand fighting ability, strong offensive ability, strong defense, full physical strength, good overall strength and coordination. >>>More

2 answers2024-02-09

The main channels for playing as extras are as follows: 1. Through the group of actors in the circle. The most common way for running actors to receive the show is to obtain channel information every day through the actor announcement group in the circle and receive the show announcement. >>>More

3 answers2024-02-09

Method 1: Use Group Policy to prohibit access to Task Manager. >>>More

12 answers2024-02-09

There are several ways to do this, one is to take the national certificate, but because it is a written test, you may not be able to actually operate this piece, and it may not be easy to find a job, and one is to go to a technical school or training school to learn, and then get a certificate, this is to find a good school.