Some questions about the division of the electrical installation sub division! 10

Updated on Car 2024-02-08
6 answers
  1. Anonymous users2024-02-05

    That's not a thing, 1 do a few more inspection batches, respectively, summarized under the sub-division directory, 2 inspection batch records are filled in separately, to show distinction, I believe that the supervision, archives will not have any opinions 3 meet the construction control data (test record content) can be separately recorded, respectively, summarized under the sub-division directory, note: for the individual records that can not be divided, personal opinions directly fill in the name of the division project, and also record separately in the sub-division directory (anyway, the final archiving of the construction control data is separately summarized and compiled). You know, you say?

  2. Anonymous users2024-02-04

    On the surface, it is very messy, please understand the essence of the normative division.

    1. The division of divisions, subdivisions and sub-projects is to facilitate the detailed management of the project, but it is normal for the sub-divisions to cross each other. You have to understand this.

    Second, mutual intersection is allowed in many cases, for example, all the electrical installation projects of this project are constructed by you, and you can merge the same sub-items belonging to the strong electric power and lighting sub-divisions when applying for the inspection of the conduit sub-project, and even the same sub-items in the weak current sub-project can also be merged. Conversely, the more subcontracts there are, the more subdivisions are useful.

    Third, as far as you said that the sub-division of the lighting system and the sub-division of the power system belong to your own construction, you can merge a cable sub-item inspection according to a sub-division, but the construction section is how to divide the sub-project is determined according to the specific situation of your construction.

    Hope to understand.

  3. Anonymous users2024-02-03

    The main cable should be counted as the power supply part.

  4. Anonymous users2024-02-02

    I'm also depressed about this problem I'm a strong and weak current piping, threading inspection batch a report directly summarized to the branch can be supervised not let let me report separately then I am ready to do exactly the same two copies of the number of summary to the branch is also doubled. The weak current didn't know which sub-division to go to, so it jumped directly to the branch, no matter what.

  5. Anonymous users2024-02-01

    The question you raised is more general, a project is divided into many part of the project, the electrical sub-division project, that is, from the electrical part of the takeover, it can also be called the electrical branch project, and the part that goes down is called the sub-division project.

    If you can't tell the difference, please consult the supervisor, and the supervisor will give you a satisfactory answer.

  6. Anonymous users2024-01-31

    For details, please refer to the national list pricing specifications.

Related questions
5 answers2024-02-08

Installation quota 12 volume 7 chapter 1 section of the solar power supply part check which quota set, installation quota book 2 electrical equipment installation does not have photovoltaic related quota subheading.

5 answers2024-02-08

Electrical safety refers to the quality of electrical products, as well as the installation, use, and maintenance of electrical products without any accidents, such as death from electric shock, equipment damage, electrical fire, electrical accidents, etc. Electrical safety includes both personal safety and equipment safety. Personal safety refers to the personal safety of electricians and other participating workers; Equipment safety refers to the safety of electrical equipment and its ancillary equipment and facilities.

3 answers2024-02-08

Electrical automation is a popular major, and it is also a major with a relatively high employment rate. >>>More

11 answers2024-02-08

CD-Key is equivalent to the serial number, that is, the SN of the common series is the verification code that comes with every Windows series product produced by Microsoft. But it has lost its meaning, in the era of the rampant D version, Windows 98 was infinitely copied, and CD-Key can be universal, and you can find a lot of them on the Internet. The installation process must provide a cd-key to proceed. >>>More

17 answers2024-02-08

The resistance of V 60W is 110 * 110 40 according to the principle of voltage division 110V 60W should be divided into 88V voltage, 110V 40W should be divided into 132V, 2, the current in the circuit is: 220 (110 * 110 60 + 110 * 110 40 ) =, power consumption: 88 * of 110V 60W, 132 * of 110V 40W >>>More