Seek the construction organization design and construction plan of vertical storage tank insulation

Updated on society 2024-02-09
7 answers
  1. Anonymous users2024-02-05

    First, the general situation of the project.

    This project is a vertical storage tank insulation project, the height of the storage tank is 10 meters, the diameter is 5 meters, the insulation material is polyurethane foam board, and the insulation thickness is 100mm. The construction site is an industrial park.

    Second, the construction organization design.

    1.Organization of construction personnel.

    The construction personnel of this project include project managers, construction team leaders, insulation workers, electricians, mechanical operators, safety officers, etc. The construction team leader is responsible for on-site construction management, the insulation worker is responsible for the installation of insulation materials, the electrician is responsible for the installation of electrical equipment, the mechanical operator is responsible for the operation of mechanical equipment, and the safety officer is responsible for on-site safety management.

    2.Organization of construction equipment.

    The construction equipment of this project includes cranes, forklifts, electric welding machines, insulation material cutting machines, etc. Cranes and forklifts are used to transport and install insulation materials, electric welding machines are used to weld insulation materials, and insulation material cutting machines are used to cut insulation materials.

    3.Organization of construction materials.

    The construction materials of this project include polyurethane foam boards, steel plates, bolts, expansion screws, sealants, etc. Polyurethane foam boards are used for insulation, steel plates, bolts, and expansion screws are used to secure the insulation, and sealants are used to seal gaps between the insulation.

    4.Organization of the construction process.

    The construction process of this project includes the following steps:

    1) Site survey and measurement to determine the size and quantity of insulation materials.

    2) Build construction scaffolding and install safety protection facilities.

    3) To install the insulation material, first fix the insulation material with steel plates and bolts, and then use expansion screws to tightly fit the insulation material with the surface of the storage tank.

    4) Weld the joints between the insulation materials to ensure that the gaps between the insulation materials are sealed.

    5) Apply sealant to ensure that the gaps between the insulation materials are completely sealed.

    6) Clean up the site, remove construction scaffolding and safety protection facilities.

    Third, the construction plan.

    1.Safety precautions.

    1) Before construction, safety education and training must be carried out to ensure that construction personnel understand the construction safety specifications and operating procedures.

    2) Safety warning signs must be set up at the construction site to prohibit non-construction personnel from entering the construction area.

    3) Construction personnel must wear personal protective equipment such as safety helmets, safety shoes, and safety belts.

    4) Fire-fighting equipment and first-aid equipment must be set up at the construction site to ensure the safety of the construction site.

    2.Quality control.

    1) The insulation material must meet the national standards and engineering requirements, and the insulation thickness must meet the design requirements.

    2) The installation of the insulation material must be firm, and the gap between the insulation materials must be sealed.

    3) The welding of the insulation material must be firm, and the welding place must be smooth.

    4) The coating of the insulation material must be uniform, and the sealant must completely seal the gap.

    Fourth, summary. The construction organization design and construction plan of this project have carried out detailed planning and arrangement from the aspects of construction personnel organization, construction equipment organization, construction materials organization and construction process organization to ensure safety, efficiency and controllable quality in the construction process. At the same time, the construction plan of this project also puts forward safety measures and quality control measures to ensure safety and reliable quality in the construction process.

  2. Anonymous users2024-02-04

    'Special Construction Plan' is the abbreviation of 'Safety Special Construction Plan'.

    The tank foundation formwork does not belong to the scope of the "special construction plan for safety". Please read the Ministry of Housing and Urban-Rural Development's Measures for the Safety Management of Dangerous Sub-projects [2009] No. 87.

  3. Anonymous users2024-02-03

    Project Overview; This project is mainly the foundation for the production of light hydrocarbon storage tank equipment, and the foundation is a natural shallow base;

    Main engineering quantity;

    Construction drawingsParty A provides drawings (BN-DWG-TF-C;

    Technical specifications for construction;

    Technical preparation: drawing triage;

    Technical disclosure to the construction personnel;

    Understand the current situation of the construction site and investigate the underground concealed works;

    Material preparation: preparation of construction materials.

    Preparation of construction machinery and tools;

    On-site preparation:

  4. Anonymous users2024-02-02

    Sorry, this can't help.

  5. Anonymous users2024-02-01

    The plan is long, dozens of pages, and different ways of writing are all one project to one. You can see how to write it if you look at how the construction plan is written.

  6. Anonymous users2024-01-31

    The cold insulation installation needs to wait for the double-layer production and installation of the storage tank to be completed before the construction, and the cold-insulated installation needs to wait for the double-layer production of the storage tank to be completed in the construction of friends! The double layer is vacuumed with pearl powder! The material is glass wool and is winding! It is also a friend who needs to be vacuumed!

  7. Anonymous users2024-01-30

    Project Overview; This project is mainly the foundation for the production of light hydrocarbon storage tank equipment, and the foundation is a natural shallow base;

    Main engineering quantity;

    Construction drawingsParty A provides drawings (BN-DWG-TF-C;

    Technical specifications for construction;

    Technical preparation: drawing triage;

    Technical disclosure to the construction personnel;

    Understand the current situation of the construction site and investigate the underground concealed works;

    Material preparation: preparation of construction materials.

    Preparation of construction machinery and tools;

    On-site preparation:

Related questions
17 answers2024-02-09

It's too troublesome to say upstairs, it's actually very simple, the insurance company with serious damage and injuries has been compensated, and the rest of those who want to blackmail you don't care, these small accidents are also coordinated by the traffic police, ignore it, if you really follow the procedure, your car is estimated to not have to drive for a week.