How to implement CMMI and what is CMMI

Updated on technology 2024-02-09
6 answers
  1. Anonymous users2024-02-05

    No points will be given for asking such a big question.

    First of all, there should be a question of identity positioning, for example, you are now the CEO of the company, the middle manager, or the PM implementation of CMMI has different concerns, since you have the habit of asking questions casually, let me be simple.

    1.Strategy: Implementing CMMI is a long-term task, and the boss needs to define a strategy, such as what level to achieve in 2 years.

    2.Establish an organizational EPG: The ability of the EPG almost determines the level of the CMMI and the speed of improvement, having a strong EPG is the top priority for the implementation of the CMMI, the establishment of process specifications and education and training, and is also responsible for the CMMI level.

    3.Implementation of CMMI in all departments of the company: The organization requires each department to provide projects to operate in accordance with CMMI, audit each department in the form of certification, review the lack of personnel ability and do education and training. At the same time, improve the organization's process specifications.

    4.Collect data: Establish organizational assets such as test libraries and risk databases, collect project operation data, and establish (optimize) baselines and models.

    5.Circular improvement: In the process of implementing CMMI in the department, absorb experience and suggestions, analyze the causes of common problems of the project, and improve the organizational process specifications.

    There is a strong connection between the general CMMI implementation and the CMMI certification level. A mutually reinforcing relationship. During the certification, the company's shortcomings and suggestions for improvement will also be pointed out, and the company will make improvements in practice, and then go to certification, which is a healthy cycle.

    The other is that after the certification is passed, it will be abandoned, and the next certification will be rushed, so that everyone feels that it is just for the certificate, and the motivation for continuous improvement is lost, which is a vicious circle.

  2. Anonymous users2024-02-04

    If your company has passed the CMMI level and obtained the corresponding certificate, you should follow the process management taught by the consultant at that time. As for the specifics, that level is managed according to the corresponding CMMI level. You can't tell, I can't tell you.

  3. Anonymous users2024-02-03

    cmmi(capability

    maturity

    modelintegration) is capability maturity model integration;

    Since its debut, CMMI's goals have not changed, the first is quality, the second is timeline, and the third is to use the lowest cost. However, it is important to emphasize that CMMI is not a traditional software development life cycle, but should be applied to a broader area - the engineering life cycle. TSP was also established to support such a system at CMMI.

    So what exactly is CMMI?It's not a process, it's not a process that tells you how to do something. If you can summarize what CMMI is in one sentence, it is a key element of each process, a point of integration in many areas.

    It's a basic framework that can be used to measure your effectiveness and utility;Being able to identify some of these opportunities and opportunities for continued improvement, including in terms of business objectives, strategy, and risk reduction of the project.

  4. Anonymous users2024-02-02

    CMMI stands for Capability Maturity Model Integration. CMMI is the latest version of the CMM model.

    CMMI is a software capability maturity assessment standard developed by the Software Engineering Institute (SEI) of Carnegie Mellon University for four years by experts in software process improvement and software development management around the world, and is mainly used to guide the improvement of the software development process and evaluate the software development capability.

    The early CMMI (CMMI-SE SW IPPD), SEI began to be promoted and tried in some countries and regions. With the popularization of the application and the development of the model itself, the deduction has become a comprehensive model that has been widely used.

  5. Anonymous users2024-02-01

    Capability maturity model - integrated

    There are 5 levels:

    CMMI1 --- initial stage.

    CMMI2 --- management grade.

    CMMI3 --- definable level.

    CMMI4 --- quantitative grade.

    CMMI5 --- continuous improvement level.

  6. Anonymous users2024-01-31

    CMMI stands for Capability Maturity Model Integration.

    CMMI is the latest version of the CMM model. In the early days of CMMI (CMMI-SE SW IPPD), SEI began to be promoted and trialed in some countries and regions. With the popularization of applications and the development of the model itself, the deductive method has become a widely used comprehensive model.

    Since the CMM model was introduced in the late 80s of the 20th century and widely used in software process improvement in the 90s, it has greatly promoted the improvement of software productivity and software quality, and has made great contributions to the development and growth of the software industry.

    The basic idea of CMMI:

    Process improvement for software projects is a difficult problem to solve. After the successful implementation of CMM, it has greatly improved the development efficiency of software enterprises and the quality of software products, thereby improving the reliability of software products and the credibility of the software industry, and making people place greater hopes on software. People expect software to accomplish more, bigger, and more complex tasks.

    Realize the parallel and multidisciplinary combination of software engineering. The successful practice of the CMM model has led to a dramatic change in engineering organization and product development. The main goal of the reform is to eliminate the inefficiencies associated with segmented development.

    In the process of segmented development, when intermediate products are transferred to employees in the next stage, there may be a lot of rework to correct the original misunderstanding.

Related questions
39 answers2024-02-09

Since you have given up others for him Since he said that he is willing to work hard with you At least in the next few years or ten years, your relationship should be stable Maybe because you both have lofty ideals and independent thoughts, it will be more difficult, but since you like to be independent, should you pay some? Working together will leave good memories for your life, if you really succeed, he is a grateful and dedicated man, he will cherish you, even if there are other younger and more beautiful women appear, in his heart your first priority will not change, if he is not, then everything is different, so you should ask yourself if he is really worthy of your trust If yes, let go and love Don't hesitate to do anything You know.

19 answers2024-02-09

The system control part consists of three parts: S7200PLC, Pro-Face touch screen, and KGLF-2 microcomputer excitation controller. The PLC mainly completes the relay loop logic control working mode switching, PI adjustment during operation and external communication, etc., the Pro-Face touch screen mainly completes the system parameter setting and the information query of the fault, working time and setting operating parameters during operation, and the Pro-Face touch screen has the information of excitation current and excitation voltage recording curve. >>>More

10 answers2024-02-09

To check the nature of the house, you can check with the Housing and Land Management Bureau where the house is located, and you can provide the specific address of the house. It is also possible to verify the nature of the property right from the title certificate. >>>More

9 answers2024-02-09

Different light power is different, different working voltage power is different, different power charging conversion efficiency is different, photovoltaic modules have different power after a period of time, photovoltaic modules of different materials have different power for a long time, and the power is different when there is more dust in the use area.

7 answers2024-02-09

In 1150, the Indian mathematicians Gopala and Jin Yue first described this sequence when they studied the number of feasible methods for packing objects in boxes with exactly 1 and 2 in length and width. In the West, Leonardo of Pisa (also known as Fibonasi) was the first to study this sequence, and he used it to describe the number of rabbits growing. >>>More