Housing decoration will install water and electricity, but there are many types of water and electricity installation, in the design of everyone is better to master some methods, wiring is very troublesome, so in the design of everyone to see what are the design methods of water and electricity, thenHow to wire water and electricity well when decoratingThis? What are the key points of water and electricity wiring during decoration? Let's introduce it to you.
First, how to wire water and electricity well during decoration.
1. Integrated wiring; In the wiring design, the layout of ** line, cable TV cable, power line and twisted pair should be comprehensively considered. **The wire and power line should not be too close to the twisted pair to avoid interference with the twisted pair, but it should not be too far away, and the position should be kept about 20cm relative to the world.
2. Simple design; Due to the small number of information points and the convenience of management, there is no need to use patch panels for home cloth search fronts. One end of the twisted pair cable is connected to the information socket, and the other end can be connected directly to the hub device, saving money and reducing management difficulty.
3. Pay attention to aesthetics; Home wiring pays more attention to aesthetics, therefore, the wiring construction should be carried out at the same time as the decoration, try to bury the cable duct under the floor or decorative board, and the information socket should also be embedded, and the bottom box should be buried in the wall.
4. Appropriate redundancy; The service life of the integrated wiring is 15 years, maybe the number of computers owned by the family is less now, but no one can ** what extent the household appliances will develop in the future, maybe it will not take a few years, the household appliances can be managed with the help of the Internet. So, proper redundancy is necessary.
Second, the main points of water and electricity wiring during decoration.
1. Generally, the water is changed to the top and not to the ground, and the cold and hot water outlets must be horizontal, generally hot on the left and cool on the right, and the pipeline laying needs to be horizontal and straight. The layout direction should be safe and reasonable. The position of the pipe clamp and the slope of the pipe should meet the requirements of the specification.
All kinds of valves should be installed in the correct and flat position, which is easy to use and maintain. After the later construction, it is necessary to suppress the test.
2. The functionality of the kitchen and bathroom should also be considered when wiring, these places are more strict for the ground waterproofing, so the kitchen and bathroom should be clothed with strong wires, generally not on the ground wiring, but on the roof along the wall wiring, otherwise the ground slotted wiring may damage the waterproof layer of the space. Strong and weak current should be clearly distinguished, because the current and power of strong and weak current are different, if they are connected to a junction box at the same time, or even cross distribution, the function of weak current will be affected.
3. If you are decorating an old house and the original aluminum wire is used, it must be removed, because the aluminum wire can no longer meet the needs of modern household electricity. The construction personnel must not only replace the wires at the switches and plugs in order to cope with the residents, otherwise it will bury potential safety hazards for the residents in the future.
The layout of hydropower is a more important part, in the design of everyone to master the skills, so how to decorate the hydropower and what are the key points of wiring, we have read the above introduction and also understood.
-
Decoration wall water and electricity wiring is an important part of the whole house decoration, because the wall wiring directly determines the safety and comfort of the house. Here are some tips and precautions on how to wire the water and electricity on the decoration wall:
1.Before decoration, do a good job of water and electricity wiring plan. This plan needs to be considered in the construction stage of the house foundation, and you can find the relevant hydropower company or decoration company to provide the wiring design plan.
2.Hydropower wiring needs to have clear drawings and arrangement plans so that there are no confusions and errors when it is implemented.
3.Hydropower wiring needs to be constructed in accordance with safety specifications, such as waterproofing, insulation, heat insulation, etc.
4.Smart homes need to arrange additional wiring, and configure corresponding sockets and data cables, which needs to be considered in advance in the construction of hydropower projects.
5.Water and wires should be avoided in the middle of the joint, and the connection should be insulated with professional joints.
6.The trunking and socket should be smoothly connected to the wall to minimize gaps and unevenness.
7.Lamp holders and sockets should be installed in suitable locations, such as bedside, desk, bathroom, etc.
8.Before the end of the water and electricity project, the entire wall should be checked and accepted to ensure the normal use of each socket and switch, and ensure whether the water pipe is leaking, and check whether the wires are smoothly energized.
The above are some tips and precautions for decorating wall water and electricity wiring, I hope it can help you. And it is necessary to pay attention to protect the wall during construction, minimize the scratches and damage to the wall, and ensure the smooth completion of the entire decoration process.
-
I believe that many people will suffer losses in the process of hydropower construction when decorating their homes, and they don't know what to pay attention to during construction! Recently, my home is also installing water and electricity, but I am staring at the whole process, for fear that the decoration master will pit me, this is not when the water pipe is installed at home, I found a strange thing in order to be lazy will be poured directly on it, this is not good, if you can, do it yourself, the process is not difficult, mainly serious. Do one more waterproof in places such as floor drains, yin and yang corners, and pipes.
After the waterproofing construction is completed, remember to do two water storage tests.
The renovation plan should be confirmed in advance according to our requirements and drawn on the hydropower renovation drawings. That is to say, we must personally participate in the renovation of water and electricity in our home, which includes confirming the location of the switches and sockets in each room, as well as the water in the kitchen and bathroomThe brand and model of the water line pipe will be indicated in the contract, which must be consistent with the decoration contract. Also, the wire must check whether it is also a trademark designated by yourself, and there will be a certain price difference between different brands of wires
The positioning of water and electricity is very important when decorating, for a simple example, the height of the kitchen socket is not suitable, and the sink drain pipe is not lined by the wall, which is both simple but easy to ignore, which leads to inconvenience in later use. It doesn't matter if the construction is good or bad, the decoration is not good, in fact, such an idea will often make you suffer a big loss. Don't understand the location of water and electricity, don't decorate it messily, a centimeter is a disaster, after reading the following pictures, the decoration is a hydropower expert in seconds!
Before the construction of hydropower, it is necessary to draw the direction of the hydropower line with a pen in advance, and the switches and sockets that need to be reserved must be confirmed with the master in advance. If you find out that you forgot to leave the socket during the construction process, it is very troublesome, and it may waste more building materials. Specifications:
The lighting line is wired and the lighting is attached to the ground wire, the ordinary socket line is wired, and the main line of the bath bomb is 4, the kitchen socket of the bath bomb branch, the air conditioning socket, and the electric water heater socket are 4 special lines according to the description of the contract.
-
Pay attention to the hidden route of hydropower, but also pay attention to some details of the decoration, but also pay attention to the short circuit of the circuit, but also pay attention to the wiring of the line, but also pay attention to the risk of leakage.
-
In the decoration process, we must choose the best line, so that we will not find the fault of the line in the future, and then we must let a professional master to wiring when wiring, so that it will be particularly safe when using water and electricity in the future, and no accidents will occur.
-
First of all, it is necessary to choose some materials with good waterproof effect or anti-leakage effect, and in the process of wiring, we must choose dark wires, and we must ensure safety, and we must pay attention to reasonable planning, and we must make corresponding plans in advance, and design good positioning.
-
Pay attention to the choice of ***, be careful not to let the strong and weak electricity cross, pay attention to reduce the amount, it is better to walk on the ground, pay attention not to let the corners too much.
-
Hydropower wiring, must be very reasonable, and do not cross, must be horizontal line for finishing, it is best to find a professional hydropower worker to help wiring. And you should also pay attention to good protection. Do not leak electricity and water, and the owner should also check it in time after wiring.
-
To summarize the precautions:
1. Generally, hydropower renovation is a profitable construction project in the decoration company, which does not seem to be expensive, but it is generally thousands of yuan or even more than 10,000 yuan. Therefore, it is necessary to be fully prepared, and it is best to have the plumber of the decoration company do a simple measurement first, estimate the approximate cost, and then carry out the construction.
2. Acceptance method of hydropower: waterway acceptance, press 8kg with a pressure test machine for more than half an hour, and check the position of each joint by hand. Circuit acceptance, check with a multimeter to see if each wire is short-circuited or open-circuited.
Special attention: after the acceptance of the waterway, let the hydraulic engineer fix the water outlets.
3. Finished product protection: The inlet and outlet of all water pipes should be blocked with plugs, and it is best to connect the hot and cold water pipes with hoses to fill the two water pipes with water. Circuits:
The PVC pipe on the ground is easy to be crushed by the foot or other things, after acceptance, it is protected with cement mortar, each line head is protected with adhesive tape, and the line is complex to be marked with a number.
Special note: The bathroom should be tiled, and it is best not to fix the water pipe with plaster, because the plaster may make the magnetic sheet hollow. It should be fixed with cement mortar.
4. Responsible construction project: When negotiating with the plumber, you must ask clearly: whether it includes the installation of switch panels?Are you responsible for the protection of the finished product?Is it responsible for sealing the pipeline?Is it responsible for drawing the circuit diagram?。。
5. Whose garbage is responsible for cleaning and sending it to the designated garbage point in the community.
6. After the transformation is completed, take pictures with the camera for future maintenance.
-
It is better to leave the decoration to professionals, because the hydropower is generally hidden after the transformation, and the quality of the project will affect the use of life in the future.
-
This is indescribable in a few sentences, otherwise we would have to study this major for several years.
-
Up-and-down electricity, electrical vertical wiring, regular decoration companies do this.
-
It's not clear, are you asking about hydropower material standards or line directions?
1.Circuit modification: square single-strand copper core wire for lighting. >>>More
This line is OK, first of all, you reasonably distribute the components, such as the 1234 feet of U1 and the 5678 feet of U2 are connected, you will be close to the feet of these two ICs, the line is as straight as possible, the place where the bend must be used at a 45 degree angle, do not turn 90 degrees, ** After the road is through, the line will be poured copper, pay special attention here, press the O + P shortcut key to pop up the dialog box, Option automatically remov do not hook in front of the hook, the hook is automatic It is not good to pour copper on the separate linePlease note this when the copper pour on the entire circuit board is automatically remov in front of the hook. >>>More
How to calculate hydropower installation** Hydropower installation knowledge.
1. The material process must meet the requirements of the company's specifications: all wires are made of famous brands such as pigeon brand BV wires, lighting circuit sockets air conditioners 4mm2, kitchens, bathrooms 4mm2, and grounding wires, especially emphasizing that DAEX general light (16) pipes or DAEX (16) B pipes, round tees, direct, locks, and yellow wax pipes should be used in the threading, and bellows, elbows, and equal diameter tees are never allowed. 1 16 pipes can only be used for one circuit, 20 can only be used for 6mm21 circuits and the circuit between the toilet bomb and the switch. >>>More
Yes or no!
If there is leakage protection, even if there is no grounding, it is OK. >>>More