1. Construction drawings and design change records.
2. The main equipment and materials certificate, the re-inspection report and the equipment schedule 3, and the acceptance record of the concealed project.
4. Equipment testing records and system test records.
5. Software and equipment user manual and maintenance manual, reliability maintenance manual 6, and acceptance records of each inspection batch.
7. Other necessary documents and records.
-
The construction site quality management inspection record shall be filled in by the construction unit according to the form, and the chief engineer (construction of intelligent building communication network system communication system, satellite and cable television system, public address system office automatic.
-
From the supervisor's point of view, the following things are the bare minimum. Give a little point, big brother project design plan;
implementation plan;
construction schedule (test plan, development plan);
Project Manager Certificate and Project Manager Appointment Letter;
Construction qualification certificate and contract of the implementation unit;
Application for payment of construction funds;
Concealed engineering inspection form;
Hardware device self-test report;
Equipment inspection application, equipment list and quality certification documents;
Hardware system power-on test records;
System test report;
Project change documents and various change requests;
Preliminary acceptance report of the project;
Trial operation record and trial operation report;
Final acceptance report of the project;
User documentation (including: user manuals, operation manuals, installation manuals, maintenance manuals);
System management, use and maintenance manual;
Project as-built drawings, including information point distribution drawings and wiring tables;
training plans, programmes and records;
system maintenance documentation;
equipment technical documentation and CD-ROMs;
Project Summary;
-
The construction site quality management inspection record shall be filled in by the construction unit according to the form, and the chief engineer (construction of intelligent building communication network system communication system, satellite and cable television system, public address system office automatic.
-
In fact, it is filled in like other professional forms, and the scope of intelligent buildings is smaller. However, ** is still filled in the same way as the construction project.
-
The intelligent building engineer is part of the construction, so the requirements must be handed over.
-
Division, sub-item, inspection batch, concealed acceptance, trial operation, material inspection, etc.
-
: Branch project inspection form.
Acceptance records of branch projects.
The inspection batch shall be carried out in accordance with the corresponding ** of the building electrical division.
1) Fire alarm and fire linkage system sub-division.
Attached: Sub-division project inspection form.
Sub-division project acceptance record.
1. Fire and combustible gas detection system sub-items.
Attached: Sub-project inspection form.
Itemized project acceptance record.
2. Fire alarm control system sub-item.
Attached: Sub-project inspection form.
Itemized project acceptance record.
3. Fire linkage system sub-items.
Attached: Sub-project inspection form.
Itemized project acceptance record.
2) Power supply and grounding sub-division project.
Attached: Sub-division project inspection form.
Sub-division project acceptance record.
1. Intelligent building power supply sub-item.
Attached: Sub-project inspection form.
Itemized project acceptance record.
2. Lightning protection and grounding.
Attached: Sub-project inspection form.
Itemized project acceptance record.
3) Residential (community) intelligent system sub-division.
Including: automatic fire alarm and fire linkage system; security systems; property management systems; Smart home information platform system.
Functional test data.
1. System function measurement and equipment debugging records.
2. System test report.
3. System trial operation record.
4. System power supply and grounding test report.
Strictly speaking, it is not a concept, and the two biases are different
First, first enter the venue to prepare:
1. Project commencement report, construction permit, construction organization design, materials and equipment for review. >>>More
The quality standards of construction projects include: meeting the quality objectives and quality requirements of the project; Comply with the agreed requirements of the signed contract and supplementary agreement; Meet the requirements of design and construction drawings and technical documents; Comply with various norms and standards and quality management rules and regulations of the department; Pass acceptance. >>>More
First of all, you must ensure your own business level, like the construction industry pays more attention to practical experience, some masters have worked for a lifetime, especially carpenters are more stubborn, you must improve your ability, so that others can convince you that you can manage your people more conveniently, secondly, use different methods for different people, and quietly listen to what others say when they encounter problems that they don't understand, (learn more by themselves) don't talk nonsense for the sake of face, so you will be laughed at by others. I haven't been doing it for long, and anyway, I always remember to learn more.
Hello, I am also a person engaged in the construction industry, I think there should be no such person as the pay-off person you said, these jobs are technicians, supervisors can be said to be the losers, the quality of the project is the professionals invited by Party A to supervise and know the construction quality and the project of Party B. >>>More